Loading...
HomeMy WebLinkAboutEngineers letter si �. - Y j W d .� f )11' / ECTOR f F yyp '� E rI G I I1 E E R S yt I VSE Project Number:U3227.0097.202 January 21,2020 Rooftop Power Co. 2980 West Shore Rd.Suite#3 Warwick RI,02886 REFERENCE: Dorce,Jean Marc Residence:27 Melville Road,Yarmouth,MA 02664 Solar Array Post Installation To Whom It May Concern: We have reviewed photographs and a post-installation checklist for the above-referenced site. Based upon our review, it is our conclusion that the installation of solar panels on this existing roof occurred in accordance with the building code and our original requirements as stated in a letter dated: 12/05/2019. Framing size and spacing has been verified to match the original design. After installation was complete, it was verified that all roof-penetrating fasteners actually penetrated into the roof framing and did not visibly split the framing members.No existing damage to any existing structure was discovered and no damage was caused to any existing structure during installation, according to the installer. Measures have been taken to waterproof all roof penetrations. Our conclusions are based upon our review of the photos and a checklist prepared by the installer.This letter does not waive the installer of any responsibility for improper installation. We hope this meets your needs. If you have any further questions regarding this matter, please call this office at your convenience. VECTOR STRUCTURAL ENGINEERING,LLC -`v%OF/444,6 Digitally signed ��'y by Jacob S 4 JACOB S. GN Jacob S Proctor Proctor PROCTOR IT Date: v CIVIL H Jacob Proctor,P.E. 2020.01.21 N0.14:30:34-07'00' 54953 MA License:54953-Expires:06/30/2020 '9 FeiSTEp � Project Engineer S/ONALE JSP/brw 01/21/2020