Loading...
HomeMy WebLinkAboutsolar Installation E13IEERSVECTDR JqN13Zo?\GDpg _T Nr , VSE Project Number:U2041-2965-191 December 4,2019 Trinity Solar 20 Patterson Brook Road,Unit#1 W.Wareham MA,02576 REFERENCE: Bismarck Ladner Residence:96 Starbuck Lane,Yarmouthport,MA 02675 Solar Array Post Installation To Whom It May Concern: We have reviewed photographs and a post-installation checklist for the above-referenced site. Based upon our review,it is our conclusion that the installation of solar panels on this existing roof occurred in accordance with the building code and our original requirements as stated in a letter dated: 10/28/2019. Framing size and spacing has been verified to match the original design. Water damage was not encountered during work on and under the existing roof.No pre- installation splits,cuts,breaks,or visible sagging was encountered in the existing roof framing.After installation was complete, it was verified that all roof-penetrating fasteners actually penetrated into the roof framing and did not visibly split the framing members. No existing damage to any existing structure was discovered and no damage was caused to any existing structure during installation,according to the installer.Measures have been taken to waterproof all roof penetrations. Our conclusions are based upon our review of the photos and a checklist prepared by the installer.This letter does not waive the installer of any responsibility for improper installation. We hope this meets your needs. If you have any further questions regarding this matter, please call this office at your convenience. VECTOR STRUCTURAL ENGINEERING,LLC Digitally sired by Jacob S Jacob S Prodgr Dro or Jacob Proctor,P.E. " 2019.12.04 11:17:54-07'40• MA License:54953-Expires:06/30/2020 Project Engineer JSP/jsl