HomeMy WebLinkAboutEngineering Letter I
---1 TRANSITION
, EVGINEERING
} '-' :1-1-6%1E:PLIA-2R-L-IT7MI:ENT
9 ,j4
_
February 13, 2020 -'- ---- _ A,,o ass
Z.t q •r- Z.o
ERIC J• to
Mr. Thomas Finelli I CEDERHOl1u1
Finelli Building, Inc. $ sNo. 3a92
172 Middle Rd. , 'y
Southborough, MA 01772 �`:Y%,, �''�
4 fot
RE: 159 South St., Yarmouth, MA- Garage &Addition Foundation Construction
Dear Mr. Finelli,
At your request, Transition Engineering has reviewed the photographs and supplemental
information from the foundation contractor you provided for the garage and addition foundations
recently constructed at the referenced property location.
Based on a review of this information, the foundations have been constructed in accordance
with the design drawings to the best of my knowledge and belief.
Should you have any questions regarding these findings, please do not hesitate to contact me.
Sincerely,
Eric J. Cederholm, PE
Transition Engineering, Inc.
P.O. Box 576
Cotuit, MA 02635
(508)404-0358
ejcpe@verizon.net
Page 1 of 1