Loading...
HomeMy WebLinkAboutEngineering Letter I ---1 TRANSITION , EVGINEERING } '-' :1-1-6%1E:PLIA-2R-L-IT7MI:ENT 9 ,j4 _ February 13, 2020 -'- ---- _ A,,o ass Z.t q •r- Z.o ERIC J• to Mr. Thomas Finelli I CEDERHOl1u1 Finelli Building, Inc. $ sNo. 3a92 172 Middle Rd. , 'y Southborough, MA 01772 �`:Y%,, �''� 4 fot RE: 159 South St., Yarmouth, MA- Garage &Addition Foundation Construction Dear Mr. Finelli, At your request, Transition Engineering has reviewed the photographs and supplemental information from the foundation contractor you provided for the garage and addition foundations recently constructed at the referenced property location. Based on a review of this information, the foundations have been constructed in accordance with the design drawings to the best of my knowledge and belief. Should you have any questions regarding these findings, please do not hesitate to contact me. Sincerely, Eric J. Cederholm, PE Transition Engineering, Inc. P.O. Box 576 Cotuit, MA 02635 (508)404-0358 ejcpe@verizon.net Page 1 of 1