HomeMy WebLinkAboutfire Protection Construction Commonwealth of Massachusetts
Department of Public Safety
Uniform Fire Protection Construction
Document Transmittal Form
Date: 12/23/19
To: Fire Protection YFD - Capt. Huck or Lt. Moriarty
From: Building Inspector YBD - Tim Sears
Re: 30 Ansel Hallett Rd Parcel
Ma•
I am forwarding a set of fire protection documents to you for your review pursuant to 780 CMR
The following
e
Massachusetts State Building Code, Sections 107.1.2 and/or R106.3.3.4, as applicable.
documents are enclosed:
Plans modify existing fire alarm system per plan
Plans
Plans
Other:
Please review these construction documents for compliance with 780 For th CMR 0adf/or
y 80reMom'4.00,R 80en
0
CMR 34.00, 780 CMR 51.00 Ch. 3 and Appendix J as applicable. purpose
determined that the •ro•osed construction ty•e is VB and the •ro•osed use(s) is/are:
A Assembl A-1 ❑, A-2 ❑, A-3 ❑, A-4 ❑, ❑
M Mercantile M ❑
B Business B ® S Stora:e S-1 ❑, S-2 ❑
E Educational E ❑ S ❑
F Factory F-1 ❑, F-2 0
H Hi.h Hazard H-10, H-2 ❑, H-30,H-4 ❑, H-5 0
I Institutional I-1 ❑, I-2 ❑, I-3 ❑, I-4 0
R Residential R-1 ❑, R-2 ❑, R-3 ❑, R-4 ❑, land 2 Family Dwelling 0, Townhouses
Special Use Special Use ❑, Specify:
Mixed Use
Yes 0,No ®; Non Separated 0, Separated 0, Combination Non Sep./Sep. ❑
1
ays
Please forward your written comments, or a request for an extension of time,h th requirements s office inf 0 d CMR
. If
you believe the fire protection construction documents are noncompliant
or the applicable reference standards,provide your written commmenttingor the request relevant
sn e tionsion of time is
noncompliance (refer to M.G.L. c.148 §28A). If your written
not received within the allowed time frame,the documents, after review, may be deemed to be in compliance
with 780 CMR. Please note, one or more extensions of time for review may be granted,provided that
cumulative time does not exceed 30 days. Should ou have any •uestions, *lease contact this office.
Please si:n, date and return one co, o this document to the buildin: de,artment.
Fire Chief or Designee _i v � _
Print Name • NA 14-- Date / /
For Building Department Use: Date: /_/ Permit#:
Received By: