Loading...
HomeMy WebLinkAboutfire Protection Construction Commonwealth of Massachusetts Department of Public Safety Uniform Fire Protection Construction Document Transmittal Form Date: 12/23/19 To: Fire Protection YFD - Capt. Huck or Lt. Moriarty From: Building Inspector YBD - Tim Sears Re: 30 Ansel Hallett Rd Parcel Ma• I am forwarding a set of fire protection documents to you for your review pursuant to 780 CMR The following e Massachusetts State Building Code, Sections 107.1.2 and/or R106.3.3.4, as applicable. documents are enclosed: Plans modify existing fire alarm system per plan Plans Plans Other: Please review these construction documents for compliance with 780 For th CMR 0adf/or y 80reMom'4.00,R 80en 0 CMR 34.00, 780 CMR 51.00 Ch. 3 and Appendix J as applicable. purpose determined that the •ro•osed construction ty•e is VB and the •ro•osed use(s) is/are: A Assembl A-1 ❑, A-2 ❑, A-3 ❑, A-4 ❑, ❑ M Mercantile M ❑ B Business B ® S Stora:e S-1 ❑, S-2 ❑ E Educational E ❑ S ❑ F Factory F-1 ❑, F-2 0 H Hi.h Hazard H-10, H-2 ❑, H-30,H-4 ❑, H-5 0 I Institutional I-1 ❑, I-2 ❑, I-3 ❑, I-4 0 R Residential R-1 ❑, R-2 ❑, R-3 ❑, R-4 ❑, land 2 Family Dwelling 0, Townhouses Special Use Special Use ❑, Specify: Mixed Use Yes 0,No ®; Non Separated 0, Separated 0, Combination Non Sep./Sep. ❑ 1 ays Please forward your written comments, or a request for an extension of time,h th requirements s office inf 0 d CMR . If you believe the fire protection construction documents are noncompliant or the applicable reference standards,provide your written commmenttingor the request relevant sn e tionsion of time is noncompliance (refer to M.G.L. c.148 §28A). If your written not received within the allowed time frame,the documents, after review, may be deemed to be in compliance with 780 CMR. Please note, one or more extensions of time for review may be granted,provided that cumulative time does not exceed 30 days. Should ou have any •uestions, *lease contact this office. Please si:n, date and return one co, o this document to the buildin: de,artment. Fire Chief or Designee _i v � _ Print Name • NA 14-- Date / / For Building Department Use: Date: /_/ Permit#: Received By: