Loading...
HomeMy WebLinkAboutCorrespondence 7.22.2020 Grant, Kelly From:Grant, Kelly Sent:Wednesday, July 22, 2020 12:49 PM To:'Brendan Kling' Cc:Rick Grady Subject:RE: 8 Cuttyhunk Lane - Septic Repair Question in flood zone AE- Notice of Intent Required? Attachments:Septic Review Standard Conditions.pdf Hi Brendon If it is just a septic upgrade then I will just comment on the Health Dept review process. Please include the attached conditions with your plan. Regards Kelly Grant Conservation Administrator Town of Yarmouth 508-398-2231 Ext 1288 kgrant@yarmouth.ma.us From: Brendan Kling \[mailto:bkling@gradyconsulting.com\] Sent: Friday, July 17, 2020 5:19 PM To: Grant, Kelly <KGrant@yarmouth.ma.us> Cc: Rick Grady <rick@gradyconsulting.com> Subject: 8 Cuttyhunk Lane - Septic Repair Question in flood zone AE- Notice of Intent Required? Attention! This email originates outside of the organization. Do not open attachments or click links unless you are sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure. Otherwise delete this email. Good evening Kelly, I am preparing a septic repair plan for the house at 8 Cuttyhunk Lane. The entire lot and house are within the flood zone AE (firmette attached) El.11. Will we need to do a notice of intent for this project? I have also attached a preliminary plan for reference. Please let me know if you need any additional information. Thanks! Brendan Kling Grady Consulting, L.L.C. 71 Evergreen Street, Suite 1 1 Kingston, MA 02364 Phone: (781) 585-2300 \[x213\] Fax: (781) 585-2378 www.GradyConsulting.com 2