Grant, Kelly
From:Grant, Kelly
Sent:Tuesday, September 8, 2020 12:06 PM
To:'Avner Schneur'
Subject:RE: 3 powers lane deck extension
Hi Avner
Any deck extension in a resource area needs to go through the permitting process to the Commission with a surveyed
plan. The expansion of deck at 55 powers lane was cantilevered. They filed a Notice of Intent for that work. No on
ground disturbance is likely to be approved within the resource area.
Here is a link to the filing forms (scroll down to the Notice of Intent) http://www.yarmouth.ma.us/696/Filing-Forms
Thanks
Kelly Grant
Conservation Administrator
Town of Yarmouth
508-398-2231 Ext 1288
kgrant@yarmouth.ma.us
From: Avner Schneur \[mailto:aschneur@gmail.com\]
Sent: Thursday, September 3, 2020 11:34 AM
To: Grant, Kelly <KGrant@yarmouth.ma.us>
Subject: Re: 3 powers lane deck extension
Attention! This email originates outside of the organization. Do not open attachments or click links unless you
are sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure.
Otherwise delete this email.
Kelly,
I hope you and your family all well and healthy.
As discussed I want to extend my deck in 3 yards out
I saw that 55 Powers lane extends its deck dramatically ON the GROUND. Mine is
floating.
1
There are 3 options. Chart 2 is my preferred one, very simple, and have a min impact.
If to do with no impact at all either Chart 1 or 3. Obviously more engineering
challenging assuming is doable.
Can you approve chart 2?
Thank you
Avner