Loading...
HomeMy WebLinkAbout83-1960 - Proposed Conditions002REINFORCED ENVIRONMENTAL MATTING QG 0 P� / �� G�' Pj �N v�� m v7 LEWIS N NOTES: BA Y sr+ v 1. THE INFORMATION DEPICTED ON THIS PLAN WAS A RESULT OF A HYDROGRAPHIC N SURVEY PERFORMED ON MAY 25, 2010. LOCUS 2. THE ELEVATIONS ON THIS PLAN ARE ON THE MLW DATUM. QO\N 3. THE OTHERS.PIERS AND FLOATS DEPICTED ON THIS PLAN WERE COMPILED FROM PLANS BY POST STORM DREDGE VOLUME WESTERLY SECTION OF SWEETHEART CREEK DREDGE DEPTH TO -5.0 MLW=157 C.Y. PAY DEPTH TO -5.5 MLW= 71 CY TOTAL DREDGE VOL. -228 C.Y. STAGING AREA WITH WOOD BASED MATTING FRO CRANE STABILIZATION IIT C If, - al�SPARIINA \A f7NIFLORA _. .. _. I I MSR\ ,11 _1L -------- SECTIONS 5 :...................:...................: 5 .................. :.................:.......... EXISTING GROUND 0 `Y......... ............ 0 ti :... .................: .................. . - • •EXISTING •.CHANNEL PROPOSED: EDGE —5 ` PROP'OSED"DIVERDIG SECTION BB SCALE: 1"=50' HORIZONTAL 1"=5' VERTICAL PA 0/0— Val U C EASTERLY SECTION OF SWEETHEART CREEK DREDGE DEPTH TO -5.0 MLW=302 C.Y. PAY DEPTH TO -5.5 MLW=142CY TOTAL DREDGE VOL.=444 C.Y. ah, all, all. I, Ir, All ALLLhe>i MI, PLAN VIEW 1" = 50' 0 25' S0' 100' Ir 5 ................... ................... ................... : .....................................:.........EXISTING GROUND ............... :................... :................. : 0 ............. x.. ........ �„ ................. %yEXISTING: -CHANNEL ........... �R .....:................... . PROPOSED DREDGE PROPOSED OVERDIG —5 ............... .... ............... ........................................ SECTION CC SCALE: 1"=50' HORIZONTAL 1"=5' VERTICAL 0 t—IL alr, 1, Ir, NANTUCKET SOUND LOCUS MAP NOT TO SCALE `y �0 TUUKi vn 1 MDORING.. All,all. alb, ��RN11tiORP SQPR�NP IN LEGEND $ BORING LOCATION MAINTAINENCE DREDGE 2010 PERMIT 12642-1990-#193 AND PERMIT #9382. (EASTERLY SECTION) MAINTAINENCE DREDGE NED-R-11-78-149 CHAPTER 91 #193 (WESTERLY SECTION) FEW AREA TO BE DREDGED GROUND Re�:se-8 A�oova Pion OF CRAIG A. v FIELD vl No.38039 UNDND CRAIG A. FIELD DATE PROFESSIONAL LAND SURVEYOR PLAN TO ACCOMPANY A NOTICE OF INTENT (NOI) FOR SWEETHEART CREEK PROPERTY ABUTTERS TO MAINTAINENCE DREDGE 672± C.Y. OF MATERIAL IN AND OVER THE WATERS OF SWEETHEART CREEK, WEST YARMOUTH, MA. BARN STABLE COUNTY PROPOSED CONDITIONS JANUARY 15, 2013 NO. DATE DESC. 1. 2/21/13 ADD STAGING AREA PREPARED FOR: SWEETHEART CREEK PROPERTY ABUTTERS C/O ROBERT GRIFFEN GRIFFIN INTEGRATED COMMUNICATIONS 260 FIFTH AVE, 6TH FLOOR NEW YORK, NY 10001 BSC GROUP 349 ROUTE 28 UNIT D W. Yarmouth, Massachusetts 02673 508 778 8919 © 2013 BSC Group, Inc. SCALE: AS NOTED FILE: 9402—NOI-2012A. DWG DWG. NO: 5950-05 SHEET 2 OF 2 JOB. N0: 49402.01 Re�:se-8 A�oova Pion