HomeMy WebLinkAboutSM-19-2908 of•Y4R TOWN OF YARMOUTH Building Department BUILDING
- 4 (508) 398-2231 ext.1261
0- • t y PERMIT NO BLDSM-19-002908 PERMIT
? • ' ISSUE DATE :11/15/2018A~ M JOB WEATHER CARD
APPLICANT ;Diones Henrique PERMIT TO : New Work .
AT(LOCATION) 125 TEE WAY,SOUTH YARMOUTH,MA 02664 I ZONING DISTRICT I I Bldg.Type: Residential
SUBDIVISION MAP BLOCK LOT 081.10 J BUILDING IS TO BE: CONST TYPE USE GROUP
REMARKS Supply and install metal duct work. CONTRACTOR
LICENSE 2544
Sheet Metal Workers-
IDiones Henrique
Diones Henrique
AREA(SQ FT) 1607,1820. EST COST($) 17855.00 PERMIT FEE($) 50.00 901 Bridge 0t
,84
Lowell,MA 018501664
OWNER MASTROCOLA DAVID J TR
BUILDING DEPT BY
ADDRESS THE JOSEPH MASTROCOLA RLTY TRUST,15
NEW YORK NY 10023 _✓ PHONE
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR
PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE
CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR
FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE.WHERE ELECTRICAL PLUMBING/GAS
MEMBERS(READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL
3)FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED,SUCH BUILDING SHALL NOT BE INSTALLATIONS.
REFER TO DETAILED INSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS
BEEN MADE.
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
<
OTHER:
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION.
STAGES OF CONSTRUCTION ARf1VF