Loading...
HomeMy WebLinkAbout20200921_A1.1_Revision 2_cleanMASTER BEDROOM 102 ENTRY HALL 100MUDROOM 101 MASTER BATH 103 102A 103A 104A POWDER ROOM 104 101 A SLOPE DN SLOPE DN CATHEDRAL CEILING. PTD. GWB FINISH A A A D D D D E F F DN 6" HDWD FLOORING 51 2" 1'-7" 4'-10" 3'-3" 24'-4" 51 2" 1'-9" 2'-9" 4'-6" 51 2" 8'-1" 6'-7" 1'-6" 51 2" 5'-1" EQ.EQ. ℄℄℄℄ 6'-6" 31 2" 11'-61 2"3'-1"312"5'-512"512"2'-0"512"4'-912"512"4'-812"512"3'-2"3'-0" 31 2" 4'-91 2" PROPOSED DECK NEW MECHANICAL CLOSET ON (E) BULKHEAD FOUNDATION AND NEW FROST WALL FRAME IN OPENING AS REQ'D X X X X X X X X X XX 4 A3.0 1 A3.0 2 A3.0 3 A3.0 5 A3.0 ALIGN OPENINGS ALIGN OPENINGS TILE FLOORING TILE FLOORING TILE FLOORING 5 A3.0512"6"3'-8"DN 6"4'-0"NEW OPENING AS SHOWN INFILL OPENING, PATCH AND MATCH FINISHES LINE OF (E) BREAK IN CEILING KITCHEN 106 LIVING AREA 108 DINING AREA 107 SITTING AREA 105 BEDROOM 109 3'-0"BATHROOM 110 109A 109 B 110 A 111 A BEDROOM 111 111B3'-7"1'-6"312"1'-712"1'-10"℄ ℄ TILE FLOORING HDWD FLOORING HDWD FLOORING HDWD FLOORING HDWD FLOORING HDWD FLOORING HDWD FLOORING INFILL (E) DOOR OPENING, PATCH AND MATCH FINISHES PROVIDE ATTIC ACCESS AS REQ'D (E) CABINET TO REMAIN NEW VANITY & FIXTURES (E) GAS METER BENCH NEW OUTDOOR SHOWER ENCLOSURE AS SHOWN SHELFREPLACE FIXTURES IN KIND, REUSE (E) PLUMBING 8'-6"4'-6"B DN PROPOSED GRILL LOCATION, PROVIDE HARD LINE GAS HOOK-UP WITH QUICK DISCONNECT DNMOSAIC TILE FLOORING HALF WALL NEW 60" VANITY DN NEW CONC. STEP REF. PANTRY PEA GRAVEL OR APPROVED EQ. EXTERIOR DRY LAID PAVERS PROVIDE 'STADIUM STAIRS' TO GRADE AS REQ'D, FINAL LAYOUT TBD UPON OWNER REVIEW NEW EXPOSED BEAM CATHEDRAL CEILING. (PTD. GWB FINISH) 7'-6"7'-6"13'-6"± 7'-6" 7'-6" 7'-6" 7'-6" BEADBOARD FINISH @ ALL DRY MASTER BATH WALLS NEW BROOM CLOSET, MATCH FINISH OF (E) CABINETS MASTER CLOSET 112 4'-634"±2'-6"2'-0" 19'-3" 51 2" 3'-3"5'-11"5'-11"3'-3" 51 2" 5'-1" EQ.EQ. EXISTING RESIDENCE ℄℄℄25'-012"512"EQ.11'-012"512"3'-9"5'-1"512"℄ ℄312"EQ.3'-6"102 B HDWD FLOORING HW AHU ELECMECH. CLOSET 1135'-1012"512"51 2"51 2" 5'-10" 6'-9" 2 G 4'-0"DN DN PROVIDE NEW LANDING AT DOOR TO MECHANICAL CLOSET AND STAIRS AS REQ'D ADD TYP. 12" SONOTUBE @ OUTER CORNER OF LANDING 2 PROPOSED DECKING 2X FRAMING AS REQ'D, REFER TO STRUCTURAL DWGS STAIRS TO GRADE TO BE 3 BOARDS DEEP (±15") BOTTOM OF SONOTUBE TO BE 48" BELOW MEAN GRADE 1/4" = 1'-0"1 PROPOSED FIRST FLOOR PLAN Scale: Title: Sheet: Date: Revision: Lynch Residence 42 Acres Avenue W. Yarmouth, MA 02673 02.12.2020 Issue for Permit 05.20.2020 Revision 1 Set 09.23.2020 Mechanical Rev.REVISION 209.23.2020Scale: Title: Sheet: Date: Revision: As Noted Proposed First Floor Plan A1.1 1" = 1'-0"2 DECK STAIR DETAIL