GENERAL NOTES:
1. CONTRACTOR SHALL NOTIFY °D►G-SAFE" AS REQUIRED PRIOR TO THE START OF ANY
EXCAVATION WORK. CONTRACTOR IS RESPONSIBLE FOR PROTECTING UTILITIES WITHIN THE
WORK AREA DURING CONSTRUCTION.
2. CONTRACTOR/ARCHITECT SHALL VERIFY BUILDING SETBACKS, BUILDING COVERAGE, & BUILDING
HEI�HT.
3. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING
REGULATIONS. OWNER/APPLICANT IS TO OBTAIN SUCH DETERMINA110N FROM APPROVING
AUTHORITY.
4. RETAINING WALLS, LANDSCAPE STEPS, AND LANDSCAPE FEATURES ARE SHOWN ON THIS PLAN
FOR CONCEPTUAL PURPOSES ONLY. FINAL DESIGN OF LANDSCAPE FEATURES AND GRADING IN
THAT AREA SHALL BE DONE BY OTHERS.
5. HOMEOWNER/CONTRACTOR TO APPROVE DRIVEWAY LOCAl10N AND MATERIAL OF
CONSTRUC110N.
6. OWNER/CONTRACTOR SHALL REVIEW AND APPROVE HOUSE LOCATION, TOP OF
FOUNDATION/SLAB ELEVATION AND GRADING PRIOR TO EXCAVATION.
7. FOUNDA�ION LAYOUT TAKEN FROM PLANS DATEO 6/15/2020 PROVIDED BY THE OWNER.
8. CONTRACTOR SHALL DETERMINE THE LOCAl10N OF EXISTING UNDERGROUND UTILITIES PRIOR TO
EXCAVATION.
9. ALL CONSTRUC110N SHALL CONFORM TO THE STATE SANITARY REGULATIONS (310 CMR 15.00)
AND ALL OTHER APPLICABLE LOCAL, STATE, AND FEDERAL CODES AND REGULATIONS.
10. PROPERTY IS LOCATED WITHIN FLOOD ZONE AE EL=11 PER FEMA MAP PANEL 25001C0589J.
SEWAGE DISPOSAL SYSTEM NOTES:
1. H-20 RATED COMPONENTS SHALL BE REQUIRED IN ANY AREAS SUBJECT TO VEHICULAR
LOADING AND AS REQUIRED ON THE PLAN.
2. THE DESIGNER WILL NOT BE RESPONSIBLE FOR THE SYSTEM AS DESIGNED UNLESS
CONSTRUCTED AS SHOWN. ANY CHANGES OR DEVIATIONS FROM THIS PLAN MUST BE
APPROVED IN WRITING.
3. ALL GRAVITY SEWER PIPE SHALL BE 4" DIA. SCH 40 PVC UNLESS OTHERWISE NOTED. THE
MINIMUM SLOPE OF 4" DIA. SCH 40 PVC SHALL BE 0.01 FT/FT.
4. SOIL ABSORPTION SYSTEMS MUST BE VENTED WHEN DISTRIBUTION LINES EXCEED 50 FEET IN
L E N G T H, W H E N L O C A T E D I N A R E A S S U B J E C T T O V E H I C U L A R L O A D I N G, A N D W H E N P R E S S U R E
DOSED.
5. FINISHED GRADE SHALL BE A MAXIMUM OF 36" AND A MINIMUM OF 9" OVER THE TOP OF ALL
SYSTEM COMPONENTS.
6. ALL ABANDONED SEPTIC SYSTEM COMPONENTS SHALL 8E PUMPED DRY AND FILLED WITH
CLEAN SAND OR REMOVED AND REPLACED WITH CLEAN SAND UNLESS NOTED TO BE REMOVED.
7. ALL SEPTIC COMPONENTS SHALL BE INSTALLED WATERTIGHT.
8. COMPONENTS TO BE PROVIDE WITH WATERTIGHT ACCESS COVERS RAISED TO WITHIN 6" OF
GRADE WHERE REQUIRED.
9. PRIOR TO FlNAL INSPECTION BY THE ENGINEER AND THE BOARD OF HEALTH ALL SYSTEM
COMPONENTS MUST BE INSTALLED INCLUDING ALL ACCESS COVERS WITH RISERS.
10. SOIL REMOVAL: ALL TOPSOIL AND SUBSOIL (B LAYER) SHALL BE REMOVED FOR A DISTANCE
O F 5' F R O M T H E S O I L A B S O R P T I O N S Y S T E M D O W N T O T H E C L E A N S A N D L A Y E R, L A Y E R C 1,
APPROX. 35" BELOW GRADE. AREA TO BE BACKFILLED WITH CLEAN "T1TLE 5" SAND AND
C O M P A C T E D T O M I N I M I Z E S E T T L I N G. C O N T R A C T O R T O N O 1 1 F Y T O W N A N D/ O R E N G I N E E R T O
VERIFY SOIL REMOVAL AS REQUIRED.
11. PROPOSED LINER: INSTALL A 40 mil HDPE LINER FROM EL=9.0 TO EL=6.0 AS SHOWN ON
PLAN AND SAS DETAIL.
12. PROPOSED SEWER EXIT LINE LOCATION/ELEVATION: PLUMBER TO CONFlRM AND APPROVE
LOCATION AND ELEVATION OF PROPOSED SEWER LINE PRIOR TO THE SETTING OF ANY SEPTIC
COMPONENTS.
13. FLOOR PLANS: FLOOR PLANS SHALL BE PROVIDED SEPARATELY BY THE
OWNER/ARCHITECT/CONTRACTOR. _
SCHEMATIC FLOW PROFILE:
NOT TO SCALE
RAISE COVER
T O G R A D E W I T H M I N. 3 0"-
TOP OF FOUNDATION EL=11.2 POLYLOK HEAVY DUTY (SCREW
� DOWN WITH GASKET) AND A
, PROPOSED SLAB RAISE COVER MIN 30" PLASTIC RISER
EL=9.Ot TO WITHIN 6" OF
FlNISH GRADE FINISH GRADE=10f
•; 4� 4" DIA SCH 40
PVC PIPE
� ! 9.Ot Check
' � *SEE NOTE Valve
.�
..' a 1l12 � L
' . . • • e•
7.85
DROP:2' min. Gate Valve
3' max.
10" 3/8" Bleeder-
�, Hole
GAS BAFFLE
7.60
3.3f PROPOSED 2000 GALLON
MONO 2 COMPARTMENT
SEPTIC TANK/PUMP CHAMBER
� ___.._-_.___, � _
PUMP NOTES & REQUIREMENTS: ,
1.) ALARM SHALL 8E A RED WARNING LIGHT WITH AUDIBLE ALARM LOCATED WITHIN THE
BUILDING AS SHOWN ON THE PLAN. '
2.) THE CORDS FOR THE FLOATS SHALL BE ONE CONTINUOUS PIECE FROM THE PUMP CHAMBER
TO THE DISCONNECT PULL BOX. THE CORDS SHALL 8E ENCASED IN 3" ELECTRICAL CONDUIT.
3.) ALARM AND PUMP TO BE WIRED TO DIFFERENT CIRCUITS.
4.) ALL PUMP, WIRING, ALARM, AND FLOAT INSTALLATIONS SHALL CONFORM TO MASSACHUSETTS
STATE PLUMBING AND MASSACHUSETTS STATE ELECTRICAL CODES AS WELL AS TO
MANUFACTURER'S SPECIFICATIONS.
5.) PUMP SHALL BE I.IBERTY LE41A SERIES � PUMP (OR EQUAL) MEETING MAXIMUM
REQUIREMENTS OF 25.7 GPM AND 9.1' OF TOTAL DYNAMIC HEAD. INSTALLER TO VERIFY PUMP
WITH MANUFACTURER FOR FLOW AND TDH.
6.) 30" FROM PUMP ON FLOAT TO INLET INVERT PROVIDES 335 GALLONS OF STORAGE.
PUMP DOSING CALCULATIONS:
1. DETERMINE VOLUME OF EFFLUENT TO BE PUMPED TO LEACHING
FIELD:
DAILY FLOW = 330 GALLONS
NUMBER OF DOSES PER DAY = 10 DOSES
NUMBER OF GALLONS = 330/10 = 33 GPD
DRAIN BACK VOLUME:
2" FORCE MAIN & 2" MANIFOLD = 0.2 GALLONS
PUMPING VOLUME = DOSING VOLUME + DRAIN BACK VOLUME
PUMPING VOLUME = 33 GALLONS + 0.2 GALLONS = 33.2 GALLONS '
2. DfSCHARGE RATE:
22 TOTAL PERFORATIONS (INCLUDING VENTS) x 1.17 GPM / PERF.
� 2.5' HEAD = 25.7 GPM
3. TOTAL DYNAMIC HEAD: 9.1 FT.
4. PUMP MUST BE CAPABLE OF PUMPING AT LEAST 25.7 GPM
AGAINST A TOTAL DYNAMIC HEAD OF 9.1 FT
D E T A I L O F V E N T A C C E S S C A P �
NOT TO SCALE
Finis h Gra de e b a r ( f o r f u t u r e l o c a t i o n
� of vent access cap)
��\��\\� � Maximum
6" DIA. NDS ROUND I
IRRIGATION BOX COVER
1" Screw-on Cap ;
4k� N
1" PVC Access Pipe � i
. . . . .__. _- .__ .I . . .
DEEP OBSERVATION HOLE LOGS
NO SCALE
DEEP OBSERVATiON HOLE 1 EL. = 7.1t DEEP OBSERVATION HOLE 2 EL = 5Jf
DEPTN FROM SOIL SOIL SOIL COLOR
SURFACE HORIZON TEXTURE MUNSELL
0" - 15" A LOAMY SAND 10 YR 3/4
15" - 35" B LOAMY SAND 10 YR 5/8
35" - 98" C1 MED-COARSE �Q � g�g
SAND
DEPTH FROM SOIL SOIL SOIL COLOR
SURFACE HORIZON TEXTURE MUNSELL
0" - 42" FlLL - - - - -
42" - 106" C1 MED-COARSE 10 1R 8/6
SAND
DATE OF TESTING: 12/4/19
PERCOLATION RATE: MORE THAN 2 MIN/INCH (PERC � 33" W TP#1)
WITNESSED BY: KEITH E. FERNANDES, PE, GFM ENTERPRISES, INC.
PHILIP RENAUD, HEALTH INSPECTOR, YARMOUTH HEALTH DEPARTMENT
GROUNDWATER STANDING � 55" BELOW GRADE (EL=2.55) IN TP#1 AND 53" BELOW GRADE (EL=1.3) IN TP#2
USE A LOADING RATE OF 0.74 GPD/SF FOR SIZING OF SOIL ABSORPTION �YC'fFAA_
SYSTEM DESIGN CALCULATIONS:
DESIGN FLOW:
PROPOSED 3 BEDROOM DWELLING AT 110 GAL. PER DAY PER BEDROOM = 330 GPD
330 GPD X 200% = 660 GALLONS - USE 2000 (2) COMPARTMENT MONO SEPTIC TANK/PUMP CHAMBER (1500
GALLON SEPTIC TANK & 500 PUMP CHAMBER)
PRIMARY SAS AREA: A 28' L. X 16' W. X 0.5' D. LEACHING FIELD (H-10) CAN LEACH:
Vt =[(28 X 16)] X OJ4 GPD/SF = 331 GPD
RESERVE SAS AREA: A 29' L X 10' W. X 2' D. LEACHING CHAMBER (H-10) CAN LEACH:
Vt =[(29 X 10) +(29 X 2)2 +(10 X 2)2] X 0.74 GPD/SF = 330 GPD
NOTE: A GARBAGE DISPOSAL IS l� PERMITTED WITH THIS DESIGN.
INSTALL:
ONE (1) - 200a GALLON MONO SEP11C TANK/PUMP CHAMBER (USE ACME/SHOREY STPC20M)
ONE (1) - 28' X 16' X 0.5' LEACHING FlELD
ONE (1) - LIBERTY LE41A 4/10HP PUMP WITH CONTROL PANEL, FLOATS, AND ALARM
PLAN VIEW
PROPOSED SCALE: 1" = 10'
WATER SERVICE
°' _- x -
J -x -x-.--x
H- X�-_ X_..-- x - x
� nn, -X �i
� `�'-"-� X � , I
�_ X_� x_� x--_ x--- lOxO
- x " LOT #39 6 ' -� 39.s't
•� rn AREA = 5,000 SQ. FT. �oXo ;
� �;
� J �
o � 1+
;
I �: , �-� 1 i � ��� '� 1 �; 6
�
�� 30.5 t � �!�� g � PROPOSED LANDSCAPE WALL
W--.--_ W W W 1, �,�� �� �'�� T.O.W. EL=10
,� .
� _ �;,� k y = p B.O.W. EL=VARIES
,�, �� j�� p '' ' ' ' ' ' ° (SEE GENERAL NOTE #4)
PROPOSED DRIVEWAY 10.5't PROPOSED 3 B� D� OOM ,,; D E C K, ,,` PROPOSE Q S A S
(SEE GENERAL NOTE #5) � c DWELLING �a i q � �� `� �, �, � �",i "� SE� Q�jA1L�
P R O P O S ED T.O.F. EL = 1 1.2 �, R p� , � � �'
;�q;113.1t o
I' R E S E R VE � a�2 F. F. E L =_� 2. 7 , p+,� y�
AREA � O.S� EL � 9.0 ', �� � y �� ,� � h, � 1 ��
D � T. s ; �Ox3
� � .. `q' �1i `
z ---- '"-- 4 �
n m - �
� � _ lOxS
� �, � 10't % " � �= s.2't
0 0 , � 'ST ,
m �
D 3 / ' - 10.5'
m
� �
m I � ' I BENCHMARK
3/4"-1-1/2" Stone Base �� I
Fill
1" Distribution Laterai ' ,
1/4" Vent Hole with "ORENCO" Shieid
90' Bend
�-,i4�� Perforation with ��ORENCO� Sh�e�d P U M P C H A M B E R F LOAT D ETA I L
Leach Field . NOT TO SCALE
Inlet EL=7.6
�
Storage Volume Alarm (
(30" - 335 Gallons) 6"
' Pump On
48� � Cycle Volume (3" - 33.5 Gallons)
� Pump ON/OFF
w � N CB W/ DH
30.5�t E �y � 5! tl F4' � j EL=8.Ot
e I � ', 1. N�- � �; iOXO I I (NAVD 88)
� N �
V�' "�
�- lOx '
cv �L c__ � c � ��c ,�_- �"'� x�_ _�
�--- �; .�-` _--- x x --- x
\_.--- �' - x --- x --
� ��___ �� X �_ X _�- X
, �- / � �-X� X X ���' --�-PROPOSEC LANDSCAPE FEATURES
� � (SEE GENERAL NOTE #4)
VENT LOCATION
' 15" Sump TO BE APPROVED
•. L i: •..••. ... ,• BY CLIENT� PASSIVE VENT LINES:
THREE (28't) OF SCHEDULE 40
`-\ PERFORATED PIPE CONNECTED TO VENT LINE
� & CAP BY "SWEET AIR" (MUSHROOM CAP)
PUMP FLOAT NOTES: `
� PERFORATION AT VENT ACCESS CAP
1. FLOATS SHALL BE SECURED TO THE DISCHARGE LINE, -:1r `- - (SEE DETAIL)
� ' INSTALLED ON A FLOAT TREE, OR PROVIDED WITH A , iNSPEc�oN PORr `� h �
CABLE WEIGHT. 5' , �' �� I
1 } �,
' 4" SCH. 40 PVC � �
INSPECTION PORT 2. FLOATS SHALL BE INSTALLED SO THAT THEY ARE 1.� �
PROPOSED SOIL REMOVAL �
W/ 18" PiECE oF #4 REeAR ACCESSIBLE FROM THE OUTLET MANHOLE COVER. (SEE NOTE 10 � NUMBER PERFORATIONS PER LATERAL =
RAISE TO WITHIN 3" OF GRADE #� � � � 2) OUTSIDE LATERALS IMTH 7(INCLUDING VENT)
PIPE SNALL BE PERFORATED �, �; p � N �1) MIDDLE LATERAL WlTH 8(INCLUDING VENT)
N1THIN FIELD 4" Sch. 40 PVC Vent Pipe � ca PERFORATION SIZE = t/4"
` (Passive Vent) by "Sweet Air" PROPOSED LINER � �,
� PERFORATION SPACING = SEE SAS D�:TAIL
Vent Access Cap I (SEE NOTE #11) � (. ��', LATERAL LENGTH = 28'
at end of each Lateral I � � NUMBER OF LATERALS =3
(SEE DETAIL) � � LATERAL DIAMETER = 1"
� I � i PERFORATIONS SHALL BE DRILLED AT 5:00 & 7:00 0'CLOCK
Proposed EL=10.0 (min) � ' � � '� =
�\ \�� 3„ , ST � � �? I
7 m�n � ti� SAS D ETAI L
1" Distribution �aterals 9" Proposed HIGH GROUNDVIfATER LEVEL � I N
(9" Min - 36" Max) CALCULAiION
SCALE: 1 " = 10'
\ '�'� ' � �' '"� \ ,: � � LAYER OF FILTER FABRIC DEPTH TO WATER TABLE (12/4/2019) EL=2.55
�����7y� $.90 APPROPRIATE INDEX WELL: M�W-� �
2 Manifold to be below
lateral invert as shown. 3 4" - 1-1 2" STONE 'MA1ER LEVEL RANGE ZONE: ai0-z�)
� � 2" MANIFOLD �
2'� Delivery Line CURRENT DEPTM TO WA1ER LEVEL (12/<019): 6.�5
. , 2" DELIVERY LINE/FORCE MAIN
;. 90''; i� A wAiER LEVEI ADJUSiMENT: o.�� 4, 4, 4' •
'� t t ESTIMATED DEPTH TO WATER ��. EL=3.25 � '4�
5.1't 16' �
�
7.60 1 CF Poured CLASS 150 Pressure Pipe W�th SECTION A-A �/�
Thrust Blocking 1 CF of concrete behind bends for
at all bends thrust blocking (Typical) �-EL=3.3f ESTIMATED SEASONAL HIGH CROSS-SECTION OF DELIVERY LINE � MANIFOLD CONNECTION
1■
I HEREBY CERTIFY THAT THE EXISTING SITE
FEATURES SHOWN HEREON ARE LOCATED
AS THEY EXIST ON THE GROUND.
�A� v�'1 � i! 2•r�-,
DONALD T. PO E PLS#32662
LAND SURVEYOR:
°r OUTERMOST LAND SURVEY, INC.
W� 46 MAIN STREET
�9�a ' ,a� BREWSTER, MA 02631
��0���,LTH CF,� s9�y
s
G
� P�O�E T 1
o ^1Q 32662 h
�
��s/�Nq� CANO Sv�J �Q
EI�TIRE PROPERTY IS LOCATED WITHIN
AN AE FLOOD ZONE (EL-11) PER
FEM A M AP PAN EL 25001 C0589J
,s�'"��H OF kqssq�
,�i
ro�' KEITN E. y�
� FEW�lANDES �"
W4 �
v CIVIL u
`ko. 49725
�,e� aISTEP� ���
2s' Distribution Lateral p,7' - �RouN�wATER NOT TO SCALE ' OVER TH E COU N TER VARI AN CE
Pitch 2" dia. ' ' ' � -l- �- EL=2.6t OBSERVED GROUNDWATER 4� PVC PERFORATED VENT PIPE (TYPICAL) R E Q U E S T
Force Main ONE (1 � 28 x 16 x 0.5 _
I B°�k t° the L E A C H F I E L D �N TEST PIT #1 , 2�4,20, 9
8.40 (3) 1" PVC DISTRIBUTION
Pump Chamber
� LAfERALS (TYPICAL)
Bottom of Stone 4'-� 4'�
I �s�f I 2" Delivery Line to 2" Manifold LOCAL UPGRADE APPROVALS: 310 CMR 15.403
(- -(3) 1" Laterals with 1/4" Burr-free Perforations (see VARIANCE: 310 CMR 15.211 (Setbacks)
SAS detail for spacing)
Drilled at the 5: 00 and 7: 00 positions Each 1/4" 1.) Septic Tank/Pump Chamber not 10' from Foundation
Perforation Capped with "ORENCO" Splash Guard ' 2' MANIFOLD, cnPPE� EN� 6' held 4' variance
1/4" Vent Holes drilled below 90' bend at each end
of each Lateral
2' DELIVERY LINE
\\10.1.10.193\Users\Admin\OneDrive - GFM Excavating\GFM Cloud\aa Engineering\Projects\6050- 14 Angus Ave, Yarmouth\CAD\Plans\6050-Site & SDS(10-12-2020).dwg
0 10 20 30
SCALE 1 "=10'
REVISED10/12/2020: LAND SURVEYOR CERTIFICATION
ADDED
�� GFM ENTERPRISES, INC.
s �7, '
j� 3 PO BOX 1439
'�'� +�`� SOUTH DENNIS, MA 02660
� P H O N E: 508-694-5600
www.gfinexcavating.com