Loading...
HomeMy WebLinkAboutNOI 8 Grove Street, West Yarmouth Notice of Intent Raze and Replacement of Single-family Dwelling and Proposed Pool Town of Yarmouth Conservation Commission November 2020 Prepared for: Michael Lenzi 810 Merrimack Avenue Dracut, MA 01826 BSC Job #50245.00 Prepared by: 349 Route 28, Unit D W. Yarmouth, Massachusetts 02673 November 19, 2020 Town of Yarmouth Conservation Commission 1146 Route 28 South Yarmouth, MA 02664 Attn: Kelly Grant, Conservation Administrator RE: Notice of Intent Application, Raze and Replacement of a Single-Family Dwelling and Proposed Pool, 8 Grove Street, West Yarmouth, Massachusetts BSC Job #50245.00 Dear Ms. Grant and Members of the Conservation Commission: BSC Group, Inc. (BSC) is pleased to submit this Notice of Intent (NOI) Application on behalf of Michael Lenzi (the Applicant) for the property located at 8 Grove Street, West Yarmouth, Massachusetts (the Site). The project consists of the raze and replacement of a single-family dwelling with associated deck and pervious driveway, as well as the construction of an inground pool with a surrounding patio (the Project). Portions of the proposed work will occur within Coastal Bank, 100-foot Buffer Zone to Coastal Dune and to Salt Marsh, within 200-foot Riverfront Area to an unnamed perennial stream, and within Land Subject to Coastal Storm Flowage. However, in all Resource Areas and their associated Buffers Zones, with the exception of 94 square feet of disturbance associated with a pervious driveway and inground pool within the 50-100-foot Buffer Zone to Coastal Dune, impacted areas on Site will be reduced as the result of the proposed work. For more information, please refer to the attached Site Plans and Project Description. This application is being submitted in accordance with the Massachusetts Wetlands Protection Act and the Town of Yarmouth Wetlands Protections By-law. If you have any questions or require additional information, please contact me at (508) 778 - 8919. Truly yours, BSC Group, Inc. Hannah Raddatz Wetland Scientist cc: Department of Environmental Protection, Southeast Regional Office, 20 Riverside Drive, Lakeville, MA 02347 Michael Lenzi, 810 Merrimack Avenue, Dracut, MA 01826 TABLE OF CONTENTS Item Attachment Town of Yarmouth NOI Application Forms 1 Notice of Intent Form 2 Project Description 3 USGS Site Locus Map 4 NHESP Priority & Estimated Habitat Map 5 FEMA Map 6 Photo Page 7 Abutter Information 8 Site Plans 9 Town of Yarmouth NOI Application Forms DEPARTMENT OF CONSERVATION Administrative Checklist Notice of Intent General Information: All filings must be made on Town of Yarmouth forms. Applications must be submitted two weeks prior to the next scheduled Conservation Commission meeting. No new information may be accepted .Failure to follow the Administrative Checklist guidelines shall result in an Administrative Incomplete Application and will notbe advertised for a Public Hearing. Contact the office if you need assistance. Submitting an Application: ______ 1 original application with original signatures (double sided). ______ 7copies of the first and second page of the Notice of Intent (double sided). ______ 8copies of a comprehensive and detailed narrative of the project including existing & proposed conditions, construction sequence, type of equipment, staging locations, drainage and stormwater, erosion controls, invasive species management and alternative analysis. The narrative shall document how the project meets performance standards per 310 CMR 10.0 & TOY Wetland Bylaw, Chapter 143, BVW delineation sheets or other supporting information. ______ 8copies of the plan, folded separately, right side out with title visible and attached to each application.All plans shall reference NAVD1988 unless otherwise noted. Landscape plans shall be detailed to show proposed & existing conditions, native species, size and spacing. ______ A pdf file of the application, supporting information, and plan emailed to kgrant@yarmouth.ma.us ______Anradius map, abutters list and abutters notification identifying the property owners who are to be notified per 310 CMR 10.00. Abutters list can be obtained online at http://gis.vgsi.com/yarmouthma/and must be certified by the Town office. Tdays advance notice. _______ Submit the proof of mailing via Certified Mail Receipts (PS From 3800) for all abutters, DEP, Massachusetts Natural Heritage and Endangered Species Program, Massachusetts Division of Marine Fisheries, US Army Corps of Engineers or as required. Yarmouth Conservation Commission 1146 Route 28 South Yarmouth, MA 02664-4492 Tel. (508)-398-2231 Ext. 1288 Fax (508)-398-0836 TTD# (508) 398-2231 Revised February 2016Page 1of 2 ______Any coastal projects such as, but not limited to, docks, piers, bulkheads, revetments, dredging and boardwalks shall require submittal of all Notice of Intent, plans and supplemental information to the Town of Yarmouth Waterways/Shellfish Committee via the Natural Resources office by certified mail or hand delivery. The applicant or his representative must provide the Conservation office proof that this has been done or the filing will not be accepted. ______ State filing fee: separate check, Refer to Wetland Fee Transmittal Form. ______By-law filing fee: separate c. ______ Legal ad fee: separate c. ______ One copy of application, plan, and any other supporting information shall be sent to Department of Environmental Protection Southeast Region, 20 Riverside Drive, Route 105, Lakeville, MA 02347 ______ DEP share of the fee (refer to NOI form) shall be sent to Dept. of Environmental Protection Box 4062 Boston, MA 02211 Other Comments: Does the proposed project meet all of the applicable regulations of the Town of Yarmouth Zoning bylaws? Do you need to file with the Yarmouth Board of Appeals? If so, you must file with both boards at the same time. Ifa vacant lot, have you completed and received a determination for the Building Department for a lot inquiry form? Yarmouth Conservation Commission 1146 Route 28 South Yarmouth, MA 02664-4492 Tel. (508)-398-2231 Ext. 1288 Fax (508)-398-0836 TTD# (508) 398-2231 Revised February 2016Page 2of 2 EFQBSUNFOU! PG!! DPOTFSWBUJPO! Jg!uif!bqqmjdbou!jt!opu!uif!qspqfsuz!pxofs-!qmfbtf!tvcnju!uijt!gpsn!xjui!zpvs!bqqmjdbujpo/!Uif!pxofs! nvtu!cf!tfou!b!dpqz!pg!uif!bqqmjdbujpo!po!uif!tbnf!ebz!ju!jt!gjmfe!xjui!uijt!pggjdf/! Qspqfsuz!Beesftt;!`````````````````````````````````````````````````````````````! Bttfttpst!Nbq0Mpu;!`````````````````````````````````````````````````````````````! !J!)xf*!ifsfcz!bvuipsj{f!uif!joejwjevbm!nfncfst!pg!uif!Zbsnpvui!Dpotfswbujpo!Dpnnjttjpo!boe!jut! bhfout!up!foufs!vqpo!uif!sfgfsfodfe!qspqfsuz!gps!uif!qvsqptf!pg!hbuifsjoh!jogpsnbujpo!sfhbsejoh!uif! bqqmjdbujpo!gjmfe!xjui!uif!Dpnnjttjpo!qvstvbou!up!uif!Xfumboet!Qspufdujpo!Bdu!)N/H/M/!Di/!242-!t/! 51*boe0ps!uif!Zbsnpvui!Xfumboet!Qspufdujpo!Czmbx!)Dibqufs!254*/ Bvuipsj{fe!Tjhobuvsf;!```````````````````````````````````````!Ebuf;!``````````````! Qmfbtf!Qsjou!Obnf;!`````````````````````````````````````````! Jg!puifs!uibo!pxofs-!qmfbtf!tubuf!xifuifs!ufobou-!bhfou-!ps!puifs;!`````````````````````! Nbjmjoh!Beesftt;!!````````````````````````````````````````````````! ````````````````````````````````````````````````! ````````````````````````````````````````````````! Qipof;!``````````````````````````!Dfmm;!``````````````````````````!! Fnbjm;!``````````````````````````!Gby;!``````````````````````````! !Zbsnpvui!Dpotfswbujpo!Dpnnjttjpo!€!2257!Spvuf!39!€!Tpvui!Zbsnpvui-!NB!13775.55:3! Ufm/!)619*.4:9.3342!Fyu/!2399!€!Gby!)619*.4:9.1947!€!UUE$!)619*!4:9.3342 Notice of Intent Form 4 Provided by MassDEP: Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands MassDEP File Number WPA Form 3 – Notice of Intent Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 YARMOUTH Town of Yarmouth Wetland By-Law, Chapter 143 City/Town Important: A. General Information When filling out forms on the computer, use 1. Project Location (Note: electronic filers will click on button to locate project site): only the tab key to move your 8 Grove Street West Yarmouth02673 cursor - do not a. Street Address b. City/Town c. Zip Code use the return 41.646676-70.269845 key. Latitude and Longitude: d. Latitude e. Longitude 2037 f. Assessors Map/Plat Number g. Parcel /Lot Number 2. Applicant: Michael J.LenziSr., Trustee a. First Name b. Last Name 8 Grove Street Realty Trust Note: Before c. Organization completing this 810 Merrimack Avenue form consult d. Street Address your local Conservation Dracut MA01826 Commission e. City/Town f. State g. Zip Code regarding any mlenzi@lenzicatering.com municipal bylaw j. Email Address h. Phone Number i. Fax Number or ordinance. 3. Property owner (required if different from applicant): Check if more than one owner a. First Name b. Last Name c. Organization d. Street Address e. City/Town f. State g. Zip Code j. Email address h. Phone Number i. Fax Number 4. Representative (if any): Hannah Raddatz a. First Name b. Last Name BSC Group, Inc. c. Company 349 Route 28 Unit D d. Street Address West Yarmouth MA02673 e. City/Town f. State g. Zip Code 508-778-8919 hraddatz@bscgroup.com j. Email address h. Phone Number i. Fax Number 5. Total WPA Fee Paid (from NOI Wetland Fee Transmittal Form): $915.00 $445.00 $470.00 a. Total Fee Paid b. State Fee Paid c. City/Town Fee Paid wpaform3.doc • rev. 2/8/2018Page 1of 9 4 Provided by MassDEP: Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands MassDEP File Number WPA Form 3 – Notice of Intent Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 YARMOUTH Town of Yarmouth Wetland By-Law, Chapter 143 City/Town A. General Information (continued) 6. General Project Description: The project consists of the raze and replacement of a single-family dwelling with associated deck and pervious driveway, as well as the construction ofan inground pool with a surrounding patio. 7a. Project Type Checklist: (Limited Project Types see Section A. 7b.) 1. Single Family Home 2. Residential Subdivision 3. Commercial/Industrial 4. Dock/Pier 5. Utilities 6. Coastal engineering Structure 7. Agriculture (e.g., cranberries, forestry) 8. Transportation 9. Other 7b. Is any portion of the proposed activity eligible to be treated as a limited project (including Ecological Restoration Limited Project) subject to 310 CMR 10.24 (coastal) or 310 CMR 10.53 (inland)? If yes, describe which limited project applies to this project.(See 310 CMR 1. Yes No 10.24 and 10.53 for a complete list and description of limited project types) 2. Limited Project Type If the proposed activity is eligible to be treated as an Ecological Restoration Limited Project (310 CMR10.24(8), 310 CMR 10.53(4)), complete and attach Appendix A: Ecological Restoration Limited Project Checklist and Signed Certification. 8. Property recorded at the Registry of Deeds for: Barnstable 216493 a. County b. Certificate # (if registered land) c. Book d. Page Number B. Buffer Zone & Resource Area Impacts (temporary & permanent) 1. Buffer Zone Only –Check if the project is located only in the Buffer Zone of a Bordering Vegetated Wetland, Inland Bank, or Coastal Resource Area. 2. Inland Resource Areas (see 310 CMR 10.54-10.58; if not applicable, go to Section B.3, Coastal Resource Areas). Check all that apply below. Attach narrative and any supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. wpaform3.doc • rev. 2/8/2018Page 2of 9 4 Provided by MassDEP: Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands MassDEP File Number WPA Form 3 – Notice of Intent Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 YARMOUTH Town of Yarmouth Wetland By-Law, Chapter 143 City/Town B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont’d) Resource Area Size of Proposed Alteration Proposed Replacement (if any) a. Bank 1. linear feet 2. linear feet For all projects b. Bordering Vegetated affecting other 1. square feet 2. square feet Resource Areas, Wetland please attach a narrative c.Land Under 1. square feet 2. square feet explaining how Waterbodies and the resource Waterways area was 3. cubic yards dredged delineated. Resource Area Size of Proposed Alteration Proposed Replacement (if any) d.Bordering Land 1. square feet 2. square feet Subject to Flooding 3. cubic feet of flood storage lost 4. cubic feet replaced e. Isolated Land 1. square feet Subject to Flooding 2. cubic feet of flood storage lost 3. cubic feet replaced Unnamed Perennial Stream - Coastal f. Riverfront Area 1. Name of Waterway (if available) - specify coastal or inland 2. Width of Riverfront Area (check one): 25 ft. - Designated Densely Developed Areas only 100 ft. - New agricultural projects only 200 ft. - All other projects 36,616 3. Total area of Riverfront Area on the site of the proposed project: square feet 4.Proposed alteration of the Riverfront Area: -2,512 -1,924-588 a. total square feet b. square feet within 100 ft. c. square feet between 100 ft. and 200 ft. 5. Has an alternatives analysis been done and is it attached to this NOI? Yes No 6. Was the lot where the activity is proposed created prior to August 1, 1996? Yes No 3. Coastal Resource Areas: (See 310 CMR 10.25-10.35) Note: for coastal riverfront areas, please complete Section B.2.f. above. wpaform3.doc • rev. 2/8/2018Page 3of 9 4 Provided by MassDEP: Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands MassDEP File Number WPA Form 3 – Notice of Intent Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 YARMOUTH Town of Yarmouth Wetland By-Law, Chapter 143 City/Town B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont’d) Check all that apply below. Attach narrative and supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. Online Users: Resource Area Size of Proposed Alteration Proposed Replacement (if any) Include your document transaction a. Designated Port Areas Indicate size under Land Under the Ocean, below number (provided on your receipt page) b. Land Under the Ocean 1. square feet with all supplementary information you 2. cubic yards dredged submit to the Department. c.Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes below d. Coastal Beaches 1. square feet 2. cubic yards beach nourishment e. Coastal Dunes 1. square feet 2. cubic yards dune nourishment Size of Proposed Alteration Proposed Replacement (if any) 40 f. Coastal Banks 1. linear feet g. Rocky Intertidal 1. square feet Shores h. Salt Marshes 1. square feet 2. sq ft restoration, rehab., creation i. Land Under Salt 1. square feet Ponds 2. cubic yards dredged j.Land Containing 1. square feet Shellfish k.Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above 1. cubic yards dredged 53 l. Land Subject to 1. square feet Coastal Storm Flowage 4. Restoration/Enhancement If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been entered in Section B.2.b or B.3.h above, please enter the additional amount here. a. square feet of BVW b. square feet of Salt Marsh 5. Project Involves Stream Crossings a. number of new stream crossings b. number of replacement stream crossings wpaform3.doc • rev. 2/8/2018Page 4of 9 4 Provided by MassDEP: Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands MassDEP File Number WPA Form 3 – Notice of Intent Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 YARMOUTH Town of Yarmouth Wetland By-Law, Chapter 143 City/Town C. Other Applicable Standards and Requirements This is a proposal for an Ecological Restoration Limited Project. Skip Section C and complete Appendix A: Ecological Restoration Limited Project Checklists – Required Actions (310 CMR 10.11). Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review 1. Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on the most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural Heritage and Endangered Species Program (NHESP)? To view habitat maps, see the Massachusetts Natural Heritage Atlas or go to http://maps.massgis.state.ma.us/PRI_EST_HAB/viewer.htm. If yes, include proof of mailing or hand delivery of NOI to: a. Yes No Natural Heritage and Endangered Species Program Division of Fisheries and Wildlife 1 Rabbit Hill Road MASS GIS 2020 Westborough, MA 01581 b. Date of map If yes, the project is also subject to Massachusetts Endangered Species Act (MESA) review (321 CMR 10.18). To qualify for a streamlined, 30-day, MESA/Wetlands Protection Act review, please complete Section C.1.c, and include requested materials with this Notice of Intent (NOI); OR complete Section C.2.f, if applicable. If MESA supplemental information is not included with the NOI, by completing Section 1 of this form, the NHESP will require a separate MESA filing which may take up to 90 days to review (unless noted exceptions in Section 2 apply, see below). c. Submit Supplemental Information for Endangered Species Review 1. Percentage/acreage of property to be altered: (a)within wetland Resource Area percentage/acreage (b)outside Resource Area percentage/acreage 2. Assessor’s Map or right-of-way plan of site 2. Project plans for entire project site, including wetland resource areas and areas outside of wetlands jurisdiction, showing existing and proposed conditions, existing and proposed tree/vegetation clearing line, and clearly demarcated limits of work (a) Project description (including description of impacts outside of wetland resource area & buffer zone) (b) Photographs representative of the site Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review (see http://www.mass.gov/eea/agencies/dfg/dfw/natural-heritage/regulatory-review/). Priority Habitat includes habitat for state-listed plants and strictly upland species not protected by the Wetlands Protection Act. MESA projects may not be segmented (321 CMR 10.16). The applicant must disclose full development plans even if such plans are not required as part of the Notice of Intent process. wpaform3.doc • rev. 2/8/2018Page 5of 9 4 Provided by MassDEP: Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands MassDEP File Number WPA Form 3 – Notice of Intent Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 YARMOUTH Town of Yarmouth Wetland By-Law, Chapter 143 City/Town C. Other Applicable Standards and Requirements (cont’d) (c) MESA filing fee (fee information available at http://www.mass.gov/dfwele/dfw/nhesp/regulatory_review/mesa/mesa_fee_schedule.htm). Make check payable to “Commonwealth of Massachusetts - NHESP” and mail to NHESP at above address Projects altering 10 or more acres of land, also submit: (d) Vegetation cover type map of site (e) Project plans showing Priority & Estimated Habitat boundaries (f) OR Check One of the Following 1. Project is exempt from MESA review. Attach applicant letter indicating which MESA exemption applies. (See 321 CMR 10.14, http://www.mass.gov/dfwele/dfw/nhesp/regulatory_review/mesa/mesa_exemptions.htm; the NOI must still be sent to NHESP if the project is within estimated habitat pursuant to 310 CMR 10.37 and 10.59.) 2. Separate MESA review ongoing. a. NHESP Tracking # b. Date submitted to NHESP 3. Separate MESA review completed. Include copy of NHESP “no Take” determination or valid Conservation & Management Permit with approved plan. 3. For coastal projects only, is any portion of the proposed project located below the mean high water line or in a fish run? a. Not applicable – project is in inland resource area only b. Yes No If yes, include proof of mailing, hand delivery, or electronic delivery of NOI to either: South Shore - Cohasset to Rhode Island border, and North Shore - Hull to New Hampshire border: the Cape & Islands: Division of Marine Fisheries - Division of Marine Fisheries - Southeast Marine Fisheries Station North Shore Office Attn: Environmental Reviewer Attn: Environmental Reviewer 836 South Rodney French Blvd. 30 Emerson Avenue New Bedford, MA 02744 Gloucester, MA 01930 Email: DMF.EnvReview-South@state.ma.us Email: DMF.EnvReview-North@state.ma.us Also if yes, the project may require a Chapter 91 license. For coastal towns in the Northeast Region, please contact MassDEP’s Boston Office. For coastal towns in the Southeast Region, please contact MassDEP’s Southeast Regional Office. wpaform3.doc • rev. 2/8/2018Page 6of 9 4 Provided by MassDEP: Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands MassDEP File Number WPA Form 3 – Notice of Intent Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 YARMOUTH Town of Yarmouth Wetland By-Law, Chapter 143 City/Town C. Other Applicable Standards and Requirements(cont’d) 4. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)? If yes, provide name of ACEC (see instructions to WPA Form 3 or MassDEP Online Users: a. Yes No Website for ACEC locations). Note:electronic filers click on Website. Include your document transaction b. ACEC number 5. Is any portion of the proposed project within an area designated as an Outstanding Resource Water (provided on your receipt page) (ORW) as designated in the Massachusetts Surface Water Quality Standards, 314 CMR 4.00? with all supplementary a. Yes No information you submit to the 6. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Department. Restriction Act (M.G.L. c. 131, § 40A) or the Coastal Wetlands Restriction Act (M.G.L. c. 130, § 105)? a. Yes No 7. Is this project subject to provisions of the MassDEP Stormwater Management Standards? a. Yes. Attach a copy of the Stormwater Report as required by the Stormwater Management Standards per 310 CMR 10.05(6)(k)-(q) and check if: 1. Applying for Low Impact Development (LID) site design credits (as described in Stormwater Management Handbook Vol. 2, Chapter 3) 2. A portion of the site constitutes redevelopment 3. Proprietary BMPs are included in the Stormwater Management System. b. No. Check why the project is exempt: 1. Single-family house 2. Emergency road repair 3. Small Residential Subdivision (less than or equal to 4 single-family houses or less than or equal to 4 units in multi-family housing project) with no discharge to Critical Areas. D. Additional Information This is a proposal for an Ecological Restoration Limited Project. Skip Section D and complete Appendix A: Ecological Restoration Notice of Intent – Minimum Required Documents (310 CMR 10.12). Applicants must include the following with this Notice of Intent (NOI). See instructions for details. Online Users: Attach the document transaction number (provided on your receipt page) for any of the following information you submit to the Department. 1. USGS or other map of the area (along with a narrative description, if necessary) containing sufficient information for the Conservation Commission and the Department to locate the site. (Electronic filers may omit this item.) 2. Plans identifying the location of proposed activities (including activities proposed to serve as a Bordering Vegetated Wetland \[BVW\] replication area or other mitigating measure) relative to the boundaries of each affected resource area. wpaform3.doc • rev. 2/8/2018Page 7of 9 4 Provided by MassDEP: Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands MassDEP File Number WPA Form 3 – Notice of Intent Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 YARMOUTH Town of Yarmouth Wetland By-Law, Chapter 143 City/Town D. Additional Information (cont’d) 3. Identify the method for BVW and other resource area boundary delineations (MassDEP BVW Field Data Form(s), Determination of Applicability, Order of Resource Area Delineation, etc.), andattach documentation of the methodology. 4. List the titles and dates for all plans and other materials submitted with this NOI. Plan of Land a. Plan Title BSC Group, Inc Kieran J. Healy, PLS b. Prepared By c. Signed and Stamped by 11/3/20201" = 20' e. Scale d. Final Revision Date f. Additional Plan or Document Title g. Date 5. If there is more than one property owner, please attach a list of these property owners not listed on this form. 6. Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed. 7. Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed. 8. Attach NOI Wetland Fee Transmittal Form 9. Attach Stormwater Report, if needed. E. Fees 1. Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority. Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee Transmittal Form) to confirm fee payment: 3671 11/18/2020 2. Municipal Check Number 3. Check date 3672 11/18/2020 4. State Check Number 5. Check date MichaelLenzi 6. Payor name on check: First Name 7. Payor name on check: Last Name wpaform3.doc • rev. 2/8/2018Page 8of 9 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands NOI Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A.Applicant Information Important: When filling out forms on the computer, 1. Location of Project: use only the tab key to move your 8 Grove Street West Yarmouth cursor - do not a. Street Address b. City/Town use the return 3672 $445.00 key. c. Check number d. Fee amount 2. Applicant Mailing Address: Michael Lenzi a. First Name b. Last Name c. Organization 810 Merrimack Avenue d. Mailing Address Dracut MA 01826 e. City/Town f. State g. Zip Code mlenzi@lenzicatering.com h. Phone Number i. Fax Number j. Email Address 3. Property Owner (if different): Karen M. Bolton, Trustee a. First Name b. Last Name 8 Grove Street Realty Trust c. Organization d. Mailing Address e. City/Town f. State g. Zip Code h. Phone Number i. Fax Number j. Email Address To calculate B.Fees filing fees, refer to the category Fee should be calculated using the following process & worksheet. Please see Instructions before fee list and examples in the filling out worksheet. instructions for filling out WPA Step 1/Type of Activity: Describe each type of activity that will occur in wetland resource area and buffer zone. Form 3 (Notice of Intent). Step 2/Number of Activities: Identify the number of each type of activity. Step 3/Individual Activity Fee: Identify each activity fee from the six project categories listed in the instructions. Step 4/Subtotal Activity Fee: Multiply the number of activities (identified in Step 2) times the fee per category (identified in Step 3) to reach a subtotal fee amount. Note: If any of these activities are in a Riverfront Area in addition to another Resource Area or the Buffer Zone, thefee per activity should be multiplied by 1.5 and then added to the subtotal amount. Step 5/Total Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4. Step 6/Fee Payments: To calculate the state share of the fee, divide the total fee in half and subtract $12.50. To calculate the city/town share of the fee, divide the total fee in half and add $12.50. noifeetf.doc • Wetland Fee Transmittal Form • rev. 10/11Page 1of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands NOI Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Fees (continued) Step 1/Type of Activity Step 2/Number Step Step 4/Subtotal Activity of Activities 3/Individual Fee Activity Fee Category 2 a.) construction of 1 $500.00 x $750.00 single-family dwelling1.5 RA Category 1 a.) pool1 $110.00 x $165.00 1.5 RA Yarmouth Bylaw Fee: $200.00+ $100 Step 5/Total Project Fee: $915.00 Step 6/Fee Payments: $915.00 Total Project Fee: a. Total Fee from Step 5 $445.00 State share of filing Fee: b. 1/2 Total Fee less $12.50 $470.00 City/Town share of filling Fee: c. 1/2 Total Fee plus $12.50 C. Submittal Requirements a.) Complete pages 1 and 2 and send with a check or money order for the state share of the fee, payable to the Commonwealth of Massachusetts. Department of Environmental Protection Box 4062 Boston, MA 02211 b.) To the Conservation Commission: Send the Notice of Intent or Abbreviated Notice of Intent; a copy of this form; and the city/town fee payment. To MassDEP Regional Office (see Instructions): Send a copy of the Notice of Intent or Abbreviated Notice of Intent; a copy of this form; and a copy of the state fee payment. (E-filers of Notices of Intent may submit these electronically.) noifeetf.doc • Wetland Fee Transmittal Form • rev. 10/11Page 2of 2 Project Description Notice of Intent 15 Park Avenue West Yarmouth, MA PROJECT DESCRIPTION 1.0 INTRODUCTION The proposed project at 8 Grove Street, in West Yarmouth (the Site) consists of the raze and replacement of a single-family dwelling with associated deck and pervious driveway, as well as the construction of an inground pool with a surrounding patio (the Project). This application is being submitted in accordance with the Massachusetts Wetlands Protection Act (WPA) and the Town of Yarmouth Wetlands Protection Bylaw (the Yarmouth Bylaw). 2.0SITE DESCRIPTION The property located at 8 Grove Street, in West Yarmouth, is bordered by single-family homes to the north and east, by an unnamed perennial stream to the west, and by Lewis Bay to the south. The wetland resource areas and areas of conservation jurisdiction on or adjacent to the Site, that are protected under the Wetlands Protection Act and the Town of Yarmouth Wetland Protection Bylaw include: Riverfront Area to Unnamed Perennial Stream (RFA) Coastal Dune Salt Marsh Coastal Bank Land Subject to Coastal Storm Flowage (LSCSF), FEMA Flood Zone AE (elevation 11) and VE (elevation 13) 3.0 PROPOSED ACTIVITIES The purpose of this application is to authorize the following proposed activities: Raze and Replace Existing Single-family Dwelling with Deck and Pervious Driveway: The proposed project involves the raze and replacement of an existing single-family dwelling with associated deck and pervious driveway. The proposed single-family dwelling will be constructed on largely the same footprint as the foundation of the existing dwelling. Only a 53-square foot (sf) increase in building size is proposed and will occur within areas currently occupied by maintained lawn and landscaping. The proposed raised deck will be placed over potions of an existing deck and areas of maintained lawn. The pervious driveway will be located on the southern edge of the proposed dwelling and will have two shallow drywells installed to manage stormwater. The proposed work will result in no increased impacts to Resource Areas on site, with the exception of a portion of the 50-100-foot Buffer Zone to Coastal Dune. This will be accomplished through the reclamation of roughly 2,512 sf of areas within Coastal Bank, the 0-50- foot Buffer Zone to Coastal Bank, Salt Marsh, and Coastal Dune, as well as the 0-100 section of the RFA and LSCSF on Site, as well as the removal of an existing garage building. Therefore, no new impacts or significant impacts to Coastal Bank, the 100-foot Buffer Zone to Coastal Bank, Salt, Marsh, and Coastal Dune, RFA, or LSCSF are anticipated as a result of the proposed work. Pool and Associated Patio: The proposed 12-foot by 14-foot inground pool and surrounding patio will be located off the southwestern edge of existing and proposed single-family dwelling. These features will be located outside of the 50-foot Buffer Zone to Coastal Dune and Salt Marsh, and will be located greater than 50-feet from the bank of the unnamed perennial stream. Both the pool and the associated patio will be constructed over existing lawn areas and will not require the development of previously undisturbed areas on the Site. Notice of Intent 8 Grove Street West Yarmouth, MA 4.0ALTERNATIVES ANALYSIS No Build Scenario: In this scenario, the single-family dwelling with deck, pervious driveway, and pool with associated patio would not be constructed as proposed. This scenario would not only be unfavorable for the applicant, but would also not provide the proposed benefits to the Coastal Bank, 100-foot Buffer Zone to Salt Marsh, Coastal Bank, and Coastal Dune as well as RFA and LSCSF, through the planting native species within the mitigation planting area and the reduction of structures/disturbed areas within the aforementioned Resource Areas. The proposed project will serve to reduce impacts to all aforementioned Resource Areas, with the exclusion of 94 sf of impact within the 50-100-foot Buffer Zone to Coastal Dune and will not require construction within previously undisturbed areas on the Site. Therefore, this scenario would not be beneficial to the interests of the applicant or of the WPA and the Yarmouth Bylaw. Increased Impact Scenario: In this scenario, the total size of the proposed single-family dwelling would expand beyond the current foundation. The size of the proposed pool and associated patio could also be expanded and shifted further from the existing single-family dwelling. In addition, the exiting garage building located 35-feet from the Top of Coastal Bank could also remain in place and the proposed driveway could be paved rather than be composed of pervious materials. This alternative would result in an increased impact to the surrounding Resource Areas and their associated Buffer Zones. These alterations to the proposed project would not be beneficial to the interests of the WPA and the Yarmouth Bylaw, therefore this alternative is not recommended. Proposed Scenario: In the proposed scenario, detailed under Section 3.0, the proposed single- family dwelling would be built largely over the current foundation of the single-family dwelling, and would result in only a 53-sf increase in total structure. This configuration of the proposed dwelling would reduce ground disturbance and would avoid a significant increase in structures within the 100-foot Buffer Zones to Salt Marsh, Coastal Dune, and Coastal Bank, as well as RFA and LSCSF. Further, the construction of the pervious driveway over existing lawn would not result in the addition of impervious impacts to the aforementioned resource areas. The removal of the existing garage and the establishment of 2,512 sf of proposed mitigation planting areas will serve as a significant betterment to the Resource Areas and their associated Buffers Zones. All components of the proposed work, including the proposed pool and patio have been positioned as far as practicable from the aforementioned resource areas and will not impact currently undisturbed areas on site. Therefore, this scenario would be the most beneficial to the interests of the WPA and the Yarmouth Bylaw. 5.0 MITIGATION Before work begins on the site, a line of erosion controls will be installed at the limit of work and will be maintained and remain in place until the site is stabilized. Access for this project will be gained from the upland portion of the site and/or the existing paved driveway/road. The existing single-family dwelling will be demolished, with all removed structural components and debris placed in a roll-off container stationed in outside of resource areas. Any debris getting into the resource areas will be removed as soon as possible. No permanent impacts to resource areas are anticipated as a result of this work. Once the project is completed all disturbed areas of lawn will be loamed and seeded. A mitigation planting area, totaling roughly 2,512 sf, will also be planted within the portions of the property which contain areas of Coastal Bank and within 35-feet from the Top of Coastal Bank. See the attached Landscaping Plan for more information of the mitigation planting area. USGS Site Locus Map Document Path: \\\\bscbos\\yar\\Projects-YAR\\5024500\\Environmental\\GIS\\Output\\Maps\\MXD\\ReportMaps\\8GroveSt\\8GroveSt_LOCUS_Map.mxd Date Saved: 11/12/2020 1:06:59 PM 70°17'0"W70°16'0"W H Site Locus Copyright:© 2013 National Geographic Society, i-cubed 70°17'0"W70°16'0"W Scale: Source: 2013 8 GROVE STREET National Geographic 1 inch = 1,667 feet Society, i-cubed WEST YARMOUTH, MA 08501,700 Feet USGS Site Locus Map (page size: 8.5 X 11) THIS DOCUMENT IS INTENDED FOR GENERAL PLANNING & INFORMATION PURPOSES ONLY. ALL MEASUREMENTS & LOCATIONS ARE APPROXIMATE NHESP Priority & Estimated Habitat Map Document Path: \\\\bscbos\\yar\\Projects-YAR\\5024500\\Environmental\\GIS\\Output\\Maps\\MXD\\ReportMaps\\8GroveSt\\8GroveSt_NHESP_Map.mxd Date Saved: 11/12/2020 5:55:47 PM 70°16'0"W Site Locus ± Legend NHESP Priority Habitats of Rare Species NHESP Estimated Habitats of Rare Wildlife Certified Vernal Pools kj Potential Vernal Pools kj Scale:Source: USGS 2008-2009 1:3,000 NHESP 2017 8 GROVE STREET ESRI World Imagery 1 inch = 250 feet ESRI World Topo WEST YARMOUTH 0130260 NHESP Map Feet THIS DOCUMENT IS INTENDED FOR GENERAL PLANNING & INFORMATION PURPOSES ONLY. ALL MEASUREMENTS & LOCATIONS ARE APPROXIMATE FEMA Map Photo Page Photo 1: View of existing family dwelling and lawn area where pool and associated patio are proposed. Looking North. Photo 2: View of unnamed perennial stream, salt marsh, and existing wall . Looking North Site Photographs Page 1 October 2018 8 Grove Street West Yarmouth, MA Photo 3: View of coastal dune and salt marsh located just north of the confluence of the unnamed perennial stream and Lewis Bay. Looking West. Site Photographs Page 2 October 2018 8 Grove Street West Yarmouth, MA Abutter Information !!!!!310!!!!!!!680!!!!!!!!!0!!!!!!!!!0!!!!!!310!!!!!!!470!!!!!!!!!0!!!!!!!!!0! UPXO!PG!ZBSNPVUI!HSBWFMJOF!BOESFB!US 2257!SPVUF!39!!!!!!!!!!!!!!!!!!HSPWF!TUSFFU!OPN!USVTU TPVUI!ZBSNPVUI!-!NB!13775.5574QP!CPY!4:9! IPQLJOUPO!-!NB!12859 !!!!!310!!!!!!!510!!!!!!!!!0!!!!!!!!!0!!!!!!390!!!69/2/20!!!!!!!!!0!!!!!!!!!0! MFBIZ!NBSUIB!B!USTDBQF!DPE!IPTQJUBM MFBIZ!GBNJMZ!USVTU36!DPNNVOJDBUJPO!XBZ! 6!UBGU!TU!IZBOOJT!-!NB!13712 OBTIVB!-!OI!14171 !!!!!310!!!!!!!480!!!!!!!!!0!!!!!!!!!0! CPMUPO!LBSFO!N 9!HSPWF!TU!SFBMUZ!USTU Qmfbtfvtfuijttjhobuvsfupdfsujgzuijtmjtupgqspqfsujft 99!OPSUIFSO!CMWE! bcvuujohxjuijo211(pguifqbsdfmmpdbufebu; OFXCVSZ!-!NB!12:62 9HspwfTu/-XftuZbsnpvui-NB13784 BttfttpstNbq31-Mpu48 !!!!!310!!!!!4:/20!!!!!!!!!0!!!!!!!!!0! MFO\[J!NJDIBFM!K!UST `````````````````````````````````````` MFO\[J!TBOESB!N!UST BoezNbdibep-EjsfdupspgBttfttjoh 8!CSJBOOB!XBZ! ESBDVU!-!NB!12937 !!!!!310!!!!!!!540!!!!!!!!!0!!!!!!!!!0! TIBI!IFMFO!T!US IFMFO!T!TIBI!SFWPDBCMF!MJWJOH!US 3!IJHIMBOE!TUSFFU! XFTU!ZBSNPVUI!-!NB!13784 !!!!!310!!!!!!!530!!!!!!!!!0!!!!!!!!!0! DPPQFS!BOOJDL!T QP!CPY!2379! IZBOOJT!-!NB!13712 !!!!!310!!!!!!!520!!!!!!!!!0!!!!!!!!!0! DPPQFS!BOOJDL!T QFBCPEZ!B!EPVHMBT Q!P!CPY!2379! IZBOOJT!-!NB!13712 !!!!!390!!!!!!2310!!!!!!!!!0!!!!!!!!!0! MFO\[J!NJDIBFM!K!TS!UST MFO\[J!TBOESB!N!UST 8!CSJBOOB!XBZ! ESBDVU!-!NB!12937.2487 !!!!!310!!!!!!!460!!!!!!!!!0!!!!!!!!!0! RVJOMBO!EPOBME!G!UST RVJOMBO!QBUSJDJB!UST 22!HSPWF!TU! XFTU!ZBSNPVUI!-!NB!13784 !!!!!310!!!!!!!690!!!!!!!!!0!!!!!!!!!0! MVUUB\[J!TIJFMB!P!US!)MJGF!FTUBUF TIJFMB!P!MVUUB\[J!MJWJOH!USVTU 29!QBSL!BWF! XFTU!ZBSNPVUI!-!NB!13784 NOTIFICATION TO ABUTTERS UNDER THE MASSACHUSETTS WETLANDS PROTECTION ACT & TOWN OF YARMOUTH WETLAND BY-LAW, CHAPTER 143 In accordance with the second paragraph of the Massachusetts General Laws Chapter 131, Section 40, you are hereby notified of the following: A. The name of the applicant is ____Michael Lenzi__________________________________ B. The applicant has filed a Notice of Intent with the Yarmouth Conservation Commission, seeking permission to remove, fill, dredge or alter an Area Subject to Protection under the Wetlands Protection Act (MGL c. 131 s. 40 & Town of Yarmouth Wetland By-Law, Chapter 143). C. The address of the lot where the activity is proposed is _8 Grove Street, West Yarmouth____ D. Proposed work is ___the raze and replacement of a single-family dwelling and a pool.___ E. Copies of the Notice of Intent may be examined at the Yarmouth Town Hall at the Conservation Commission office between the hours of 9:00 a.m. and 4:00 p.m. Monday thru Friday. For more information, call (508) 398-2231 ext. 1288. F. Copies of the Notice of Intent may be obtained from either the applicant or applicant’s representative. Applicant’s phone number _____________________________________ Or Applicant’s representatives phone number _508-778-8919_____________________ G. Information regarding the date, time and place of the public hearing may be obtained by calling the Yarmouth Conservation Commission office at (508) 398-2231 ext. 1288 H. Person sending this notification (applicant, representative or other) Name _ _____________________________ Address __349 Route 28 Unit D_______________________ Town _West Yarmouth________ State __MA_____ Zip _02673____ Telephone ___508-778-8919__________________ NOTES : Notice of the public hearing, including date, time and place will be published at least five (5) days in advance in a newspaper of general circulation. Notice of the public hearing, including date, time and place will be posted in the Town Hall not less than forty-eight hours in advance. You may also contact the Southeast Regional Office of the Department of Environmental Protection at (508) 946-2800 for more information about this application. Site Plan N 508 778 8919 . T S N IN O N R E V . T S E V O R SITE PLAN G NOVEMBER 3, 2020 (BARNSTABLE COUNTY) #8 GROVE STREET PLAN OF LAND MASSACHUSETTS WEST YARMOUTH LOCUS 349 Route 28, Unit DW. Yarmouth, Massachusetts02673 W 17.0' 21.0' 10.0'2.2' 15.9' 13.4' 2.2' 68.5' 130.5'