HomeMy WebLinkAboutRequest for COCTRANSMITTAL
DATE: 12/02/2020
FROM: Ansley Druckenbrod
Town of Yarmouth
Conservation Commission
Method of Delivery: Delivered
Re: 15-013 Jackson
4 Jessie's Lane, South
Yarmouth
Enclosed is a Certificate of Compliance Request, containing:
• Yarmouth Checklist
• Letter from Engineer
• Letter from Landscape Architect
• WPA Form 8A
• As -Built Plot Plan, dated 04-18-2017
• As -Built Site Plan, dated 11-26-2020
• Overlay Plan
• Landscape Plan, dated 10-06-2016
• Photographs
• $75 filing fee
Cc: File
Please call/email should you have any questions
DOWN CAPE ENGINEERING, INC.
939 MAIN ST, SUITE C
YARMOUTHPORT, MA 02675
PHONE: 508-362-4541 X100
FAX: 508-362-9880
E-MAIL: ansley@downcape.com
DEPARTMENT
OF
CONSERVATION
MAT TA M CSE
ft, IMoa&nns� C J�
r r r r
All filings must be made on Town of Yarmouth forms.
All applications must be submitted two weeks prior to the next scheduled Conservation
Commission meeting. Refer to Meeting Schedule
Failure to follow the Administrative Checklist guidelines shall result in an Administrative
Incomplete Application and will not be advertised for a Public Hearing.
Contact the office if you need assistance. We will be happy to help guide you through the process.
S ars CLppfication
1 original application with original signatures
V 1 pdf of application, plan/sketch, and other supporting information emailed
to karantgyarmouth.ma.us
V Statement from Engineer or stamped As -Built plan, refer to 310 CMR 10.05(9)(d)
V Local filing fee — Refer to fee schedule, Check payable to "Town of Yarmouth"
�15-.ov
Yarmouth Conservation Commission • 1146 Route 28 • South Yarmouth, MA 02664-4492
Tel. (508)-398-2231 Ext. 1288 • Fax (508)-398-0836 • TTD# (508) 398-2231
939 main street rt 6a
yarmouth port
mass 02675
land court
surveys
structural design
site planning
sewage system
designs
inspections
permits
down cape engineering, inc
civil engineers & land surveyors
0
November 26, 2020
Yarmouth Conservation Commission
1146 Route 28
South Yarmouth, MA 02664
Re: Request for Certificate of Compliance
SE 83-2015 (Jackson, South Yarmouth)
Dear Commission Members:
tel. (508) 362-4541
fax(508)362-9880
Daniel A. Ojala, P.E., P.L.S.
Arne H. Ojala, P.E., P.L.S.
Daniel E. Gonsalves, P.E., S.E
Craig J. Ferrari, E.I.T., S.E.
On 8/24/2016, the Commission issued an Order of Conditions for
proposed work at the above -referenced site.
A site visit was made; an as -built plan and photos are enclosed
for review. The mitigation plantings have been completed and the
area calculated. Andrew Garulay, the Landscape Architect involved
with the mitigation plantings and plan, has supplied his
certification for this portion of the project.
To the best of my knowledge and belief, we hereby certify that the
work has been completed in substantial compliance with the
j'approved plan and Order of Conditions. We hereby request the
issuance of a Certificate of Compliance at this time.
Thank you for your consideration.
Very truly yours,
Daniel A. Ojala, PE, LS
Down Cape Engineering, Inc.
cc: William and Mary Lou Jackson
encl.
12/2/2020
Yarmouth Conservation Commission
1146 Route 28
South Yarmouth, MA 02664
RE: SE83-2015 - #4 Jessie's Lane
Dear Commissioners,
Frig iqa4UkUt, P-84
Yarmouthport Design Group
LANDSCAPE ARCHITECTURE
85 Starbuck Lane - Yarmouth Part, MA - 02675-2420
508-362-8174
The site was inspected by Andrew Garulay, RLA on December 2, 2020 for compliance regarding
the Buffer Restoration Plan dated 8/1/2016 and the Landscape Plan dated 10/6/2016.
Buffer Restoration Plan dated 8/1/2016:
The American Beach Grass is doing well and conforms to the plan. The layer of Sweet Fern is
doing very well and is becoming a contiguous stand. There were some Pasture/Carolina Roses
and Creeping Juniper that needed to be replaced along the way. Some of the Creeping Juniper
that were struggling were replaced with Blue Pacific Juniper (unintentional mistake by
contractor) a few years ago, but more recent replacements are native Creeping Juniper species
and this stand is on its way toward infilling fairly well. The Pasture/Carolina Roses will take a bit
longer to infill to a contiguous stand, but are heading in that direction. The Potentilla, Viburnum,
Inkberry, and Eastern Red Cedars are doing very well. The mitigation areas exceed what was
shown on the approved plan.
Landscape Plan dated 10/6/2016:
The Landscape Plan was done to add a small patio next to the house (Approved 10/19/20 —
Administratively?) and shows a 10' mitigation area. That area is planted with a successful stand
of Pasture/Carolina Roses consistent with the approved plan.
I believe that the project complies with the Order of Conditions.
Sincerely,
Andrew R. Garulay, RLA
Page 1 of 1
12/2/2020
Important:
When filling out
forms on the
computer, use
only the tab
key to move
your cursor -
do not use the
return key.
roe
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 8A — Request for Certificate of Compliance SE83-2015
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
Town of Yarmouth Wetland By-law, Chapter 143
A. Project Information
This request is being made by:
Willliam and Mary Lou Jackson
Name
4 Jessie's Lane
Mailing Address
South Yarmouth
City/Town
Phone Number
MA
State
2. This request is in reference to work regulated by a final Order of Conditions issued to:
Upon completion
of the work 3•
authorized in
an Order of
Conditions, the
property owner
must request a
Certificate of 4
Compliance
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed.
William and Mary Lou Jackson
Applicant
8/24/16 SE83-2015
Dated DEP File Number
The project site is located at:
4 Jessie's Lane
Street Address
51
Assessors Map/Plat Number
South Yarmouth
City/Town
102.3
Parcel/Lot Number
The final Order of Conditions was recorded at the Registry of Deeds for:
02664
Zip Code
Property Owner (if different)
Barnstable 29887 100
County Book Page
Certificate (if registered land)
5. This request is for certification that (check one):
® the work regulated by the above -referenced Order of Conditions has been satisfactorily completed.
❑ the following portions of the work regulated by the above -referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaform8a.doe -- rev. 5/29/14 Page 1 of 2
L1Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands
1 WPA Form 8A — Request for Certificate of Compliance SE83-2015
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
Town of Yarmouth Wetland By-law, Chapter 143
A. Project Information (cont.)
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
® Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
❑ No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http://www mass gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office-
for-your-city-or-town.html).
wpaform8a.doc -- rev. 5/29/14 Page 2 of 2
TO
JESSIES
LANE
ON
F
h� 9
�D OG2��c
MAP 51
�.� PARCEL plo 102
0.,
0.3'0.
� F
c
MAP 51
PARCEL 105
(COLEMAN)
1 �
O / BASS RIVER
C TIDAL
AS -BUILT PLOT PLAIT DCE #15-013
PREPARED EXCLUSIVELY FOR THE PURPOSE OF OBTAINING A BUILDING PERMIT, NOT FOR ANY OTHER USE
LOCATION #4 JESSIES LANE SOUTH YARMOUTH, MA
SCALE : 1" = 40' DATE : APRIL 18, 2017 PREPARED FOR:
REFERENCE : MAP 51 PARCEL 102.3 WILLIAM & MARY LOU
DB 28474 PG 184
JI HEREBY CERTIFY THAT THE STRUCTURE AC
SHOWN ON THIS PLAN IS LOCATED ON THEcy
GROUND AS SHOWN HEREON. �o� DAAA. GNB' J
I off 506-362-98454580 O
raX 506-362-OJALA
downeope.com a ,a No, X10980
down cape endineerkf, MC. n
Llcivil engineers \
land surveyors - SURE
939 Main Street ( Rte 6A)
------------ -------- -------
YARMOUTHPORT MA 02675 DATE REG. LAND SURVEYOR
mumpr