Design Criteria
Code 2015 International Building Code (ASCE 7-10)
Risk category II Wind Load (component and Cladding)
Roof Dead Load Dr 10 psf V 141 mph
PV Dead Load DPV 3 psf Exposure B
Roof Live Load Lr 20 psf
Ground Snow S 30 psf
If you have any questions on the above, please do not hesitate to call.
Sincerely,
Vincent Mwumvaneza, P.E.
EV Engineering, LLC
projects@evengineersnet.com
http://www.evengineersnet.com
This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of the
PV system to existing roof framing. From the field observation report, the roof is made of Composition shingle
roofing over roof plywood supported by 2X10 Rafters at 16 inches. The slope of the roof was approximated to
be 43 degrees and having an allowable maximum beam span of 10 feet between supports.
After review of the field observation data and based on our structural capacity calculation, the existing roof
framing has been determined to be adequate to support the imposed loads without structural upgrades.
Capacity calculations were done in accordance with applicable building codes.
1/1
projects@evengineersnet.com
http://www.evengineersnet.com
276-220-0064
Structural Letter for PV Installation
12/10/2020
Job Address:53 Barnboard Ln
West Yarmouth, MA 02673
Job Name:Conroy, Julie
Job Number:201210CJ
Scope of Work
Table of Content
Sheet 1 Cover2Attachment checks3Snow and Roof Framing Check
4 Seismic Check and Scope of work
Engineering Calculations Summary
Code 2015 International Building Code (ASCE 7-10)
Risk category II
Roof Dead Load Dr 10 psf
PV Dead Load DPV 3 psf
Roof Live Load Lr 20 psf
Ground Snow S 30 psf
Wind Load (component and Cladding)
V 141 mph
Exposure B
References
1 International Residential Code, 2015
2 NDS for Wood Construction
Sincerely,
Vincent Mwumvaneza, P.E.
EV Engineering, LLC
projects@evengineersnet.com
http://www.evengineersnet.com
This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of the
PV system to existing roof framing. All PV mounting equipment shall be designed and installed per
manufacturer's approved installation specifications.
1/1
projects@evengineersnet.com
http://www.evengineersnet.com
276-220-0064
Wind Load Cont.
ASCE 7-10 Table 1.5-1
141 mph ASCE 7-10 Figure 26.5-1A
ASCE 7-10 Sec 26.7.2
ASCE 7-10 Sec 26.7.3
ASCE 7-10 Sec 26.8.2
23.0 ft
18.0 ft
22.0 ft
43.0 Degrees
ASCE 7-10 Figure 30.5-1
40.0 ft
60.0 ft
4.00 ft ASCE 7-10 Figure 30.5-1
Uplift (0.6W)Zone 1 (psf) Zone 2 (psf) Zone 3 (psf)
Pnet30= -29.7 -35.8 -35.8 Figure 30.5-1
Pnet = 0.6 x λ x KZT x Pnet30)= 17.84 21.49 21.49 Equation 30.5-1
Downpressure (0.6W)Zone 1 (psf) Zone 2 (psf) Zone 3 (psf)
Pnet30= 32.5 32.5 32.5 Figure 30.5-1
Pnet = 0.6 x λ x KZT x Pnet30)= 19.52 19.52 19.52 Equation 30.5-1
Rafter Attachments: 0.6D+0.6W (CD=1.6)
Lag Screw Connection
Attachement max. spcaing=4 ft
5/16" Lag Screw Withdrawl Value=266 lb/in Table 12.2A - NDS
Lag Screw Penetration=2.5 in DFL assumed
Prying Coefficient 1.4
Allowable Capacity with CD= 760 lb
0.6D+0.6W Dpv+0.6W
Zone Trib Width Area (ft) Uplift (lbs) Down (lbs)
1 4 11.0 176.5 247.7
2 4 11.0 216.6 247.7
3 3 8.3 162.5 185.8
Max=216.6 <760
CONNECTION IS OK
1. Pv seismic dead weight is negligible to result in significant seismic uplif, therefore the wind uplift
governs
2. Embedment is measured from the top of the framing member to the tapered tip of a lag screw.
Embedment in sheading or other material does not count.
Topographic Factor, KZT = 1.00
Ridge Height =
Eave Height =
Mean Roof Height, h =
Pitch =
Adjustment Factor, λ =1
Buidling Width =
Building Length =
a =
Where a: 10% of least horizontal dimension or 0.4h, whichever is smaller, but not less than 4% of least
horizontal dimension or 3ft (0.9m)
Exposure =B
II
B
1/1
projects@evengineersnet.com
http://www.evengineersnet.com
276-220-0064
Vertical Load Resisting System Design
Roof Framing Rafters
30 psf ASCE 7-10 , Section 7.2 pf = 21 psf
0.9 ASCE 7-10 , Table 7-2 pfmin. = 25.0 psf
Ct =1.1 ASCE 7-10 , Table 7-3 ps = 25 psf 33.3 plf
Is =1.0 ASCE 7-10 , Table 1.5-1 Consevatively (Cs=1)
Max Length, L =10 ft (Beam maximum Allowable Horizontal Span)
Tributary Width, WT =16 in
Dr =10 psf 13.33 plf
PvDL =3 psf 4 plf
Load Case: DL+0.6W (CD=1.6)
Pnet+ Ppvcos(θ)+PDL=43.4 plf
Max Moment, Mu =542 lb-ft Conservatively
Pv max Shear 247.7 lbs
Max Shear, Vu=wL/2+Pv Point Load =334 lbs
Load Case: DL+0.75(0.6W+S) (CD=1.6)
0.75(Pnet+Ps)+ Ppvcos(θ)+PDL=61 plf
Mdown=760 lb-ft
Mallowable = Sx x Fb' (wind)=3247 lb-ft >760 lb-ft OK
Load Case: DL+S (CD=1.15)
Ps+ Ppvcos(θ)+PDL=50 plf
Mdown=620 lb-ft
Mallowable = Sx x Fb' (wind)=2334 lb-ft >620 lb-ft OK
Max Shear, Vu=wL/2+Pv Point Load =334 lbs
Member Capacity
DF-L No.2
2X10 CL CF Ci Cr KF φ λ
Fb =900 psi 1.0 1.1 1.0 1.15 2.54 0.85 0.8 1139 psi
Fv =180 psi N/A N/A 1.0 N/A 2.88 0.75 0.8 180 psi
E =1600000 psi N/A N/A 1.0 N/A N/A N/A N/A 1600000 psi
Emin =580000 psi N/A N/A 1.0 N/A 1.76 0.85 N/A 580000 psi
Depth, d =9.25 in
Width, b =1.5 in
Cross-Sectonal Area, A = 13.875 in2
Moment of Inertia, Ixx =98.9316 in4
Section Modulus, Sxx =21.3906 in3
Allowable Moment, Mall = Fb'Sxx =2029.4 lb-ft DCR=Mu/Mall =0.26 < 1 Satisfactory
Allowable Shear, Vall = 2/3Fv'A =1665.0 lb DCR=Vu/Vall =0.20 < 1 Satisfactory
Design Value Adjusted Value
1/1
projects@evengineersnet.com
http://www.evengineersnet.com
276-220-0064
Siesmic Loads Check
Roof Dead Load 10 psf
% or Roof with Pv 28%
Dpv and Racking 3 psf
Averarage Total Dead Load 10.8 psf
Increase in Dead Load 3.4%OK
Limits of Scope of Work and Liability
The increase in seismic Dead weight as a result of the solar system is less than 10% of the existing structure and
therefore no further seismic analysis is required.
We have based our structural capacity determination on information in pictures and a drawing set titled PV plans -
Conroy, Julie. The analysis was according to applicable building codes, professional engineering and design
experience, opinions and judgments. The calculations produced for this dwelling's assessment are only for the
proposed solar panel installation referenced in the stamped plan set and were made according to generally
recognized structural analysis standards and procedures.