Loading...
HomeMy WebLinkAboutRequest for COCDATE: 12/10/2020 FROM: Ansley Druckenbrod Town of Yarmouth Conservation Commission Method of Delivery: Deliver Re: 18-327 DiPalma 159 & 165 South St, South Yarmouth Enclosed is the Certificate of Compliance Request for 159 & 165 South St, including: • Yarmouth Checklist • Letter from Engineer • WPA From 8 • As -Built Site Plan, dated 12-10-2020 • Photographs • $75 Filing fee Cc: File Please call/email should you have any questions DOWN CAPE ENGINEERING, INC. 939 MAIN ST, SUITE C YARMOUTHPORT, MA 02675 PHONE: 508-362-4541 X100 FAX: 508-362-9880 E-MAIL: ansley@downcape.com t G O. - -H n- MATTh -J xWIC�AtLE`�4 G� r r r e_.(t4e.4cfi& DEPARTMENT OF CONSERVATION 99994--d hhimg&�L: All filings must be made on Town of Yarmouth forms. All applications must be submitted two weeks prior to the next scheduled Conservation Commission meeting. Refer to Meeting Schedule Failure to follow the Administrative Checklist guidelines shall result in an Administrative Incomplete Application and will not be advertised for a Public Hearing. Contact the office if you need assistance. We will be happy to help guide you through the process. V 1 original application with original signatures V 1 pdf of application, plan/sketch, and other supporting information emailed to kgrantAyarmouth.ma.us V_ Statement from Engineer or stamped As -Built plan, refer to 310 CMR 10.05(9)(d) J — fee schedule Check payable to "Town of Yarmouth" Local filing fee Refer to f p y Yarmouth Conservation Commission • 1146 Route 28 • South Yarmouth, MA 02664-4492 Tel. (508)-398-2231 Ext. 1288 • Fax (508)-398-0836 • TTD# (508) 398-2231 939 main street rt 6a yarmouth port mass 02675 land court surveys structural design site planning sewage system designs inspections permits down cape engineering, inc civil engineers & land surveyors December 10, 2020 Yarmouth Conservation Commission 1146 Route 28 South Yarmouth, MA 02664 Re: Request for Certificate of Compliance SE83-2208 (#159 & 165 South Street, South Yarmouth) Dear Commission Members, tel. (508) 362-4541 fax (508) 362-9880 Daniel A. Ojala, P.E., P.L.S. Arne H. Ojala, P.E., P.L.S. Daniel E. Gonsalves, P.E., S.E Craig J. Ferrari, E.I.T., S.E. In September 2019, the Commission issued an Order of Conditions for the above -referenced site, for the construction of a garage, pool, and addition to the existing dwelling. A site visit was made on December 2, 2020 for the purpose of closing out the Order of Conditions. An as -built site plan is enclosed depicting existing site conditions. All structures, including the pool have been constructed in conformance with the approved plans. Trench drains were installed per the plans in the driveway and pool patio areas to infiltrate runoff from these impermeable surfaces. All downspouts on the new garage are directed into drywells; a majority of the dwelling downspouts are also directed into drywells. The remaining 4 downspouts discharge to either gravel areas or areas that are then drained by the aforementioned trench drains. The proposed pool fence was extended past the retaining wall, and now mostly follows the 50' buffer line. All other site features appear to match the design plans. This is to certify, to the best of my knowledge and belief, that the work was performed in substantial compliance with the approved plan and Order of Conditions. We hereby request the issuance of a Certificate of Compliance at this time. Thank you for your consideration. Very truly yours, Daniel A. Ojala, PE, PLS Down Cape Engineering, Inc. Page 1 of 1 Massachusetts Department of Environmental Protection ILIBureau of Resource Protection - Wetlands WPA Form 8A — Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. A. Project Information 1. This request is being made by: Stephen Dipalma Name 12 Deer Path Mailing Address Natick City/Town 508-654-3572 Phone Number AN State 2. This request is in reference to work regulated by a final Order of Conditions issued to: Upon completion of the work 3• authorized in an Order of Conditions, the property owner must request a Certificate of 4 Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. Stephen Dipalma Applicant 9/25/2019 The project site is located at: 159&165 South St Street Address 34 Assessors Map/Plat Number SE83-2208 DEP File Number South Yarmouth City/Town 262 & 263 Parcel/Lot Number The final Order of Conditions was recorded at the Registry of Deeds for: Property Owner (if different) Barnstable County Certificate (if 5. This request is for certification that (check one): 32358 Book DEP File Number: Rq-,)9nR riuviUcu uy ver n17Fn _P _- 102TIN LIL:a:,M ® the work regulated by the above -referenced Order of Conditions has been satisfactorily completed. ❑ the following portions of the work regulated by the above -referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). ❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaform8a.doc -- rev. 5/29/14 Page 1 of 2 ILIMassachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 8A — Request for Certificate of Compliance 83-2208 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. Project Information (cont.) 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? ® Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. ❑ No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office- for-you r -city -or -town. html). wpaform8a.doc -- rev. 5/29/14 Page 2 of 2 / S82 05' 01"'N — — — 34B.00' N O 4- o/. i �_ EXISTING 3/ I DWELLING z TOF = 9.2 -ILh� ; I� / FFLR=10.4 X ate/ 9 / x% / x BVW1 .�� DOW—II PATIO II i 6 4.4' II II °I f POOL �, I 12 SHED X BMA I o IX X X c� � I J I I 100.0' 50.0'—� 05' 10 W S82 BI/w� 350.00 EXISTING GARAGE X 40.5' �X\_ 41.2 PAVED DRIVE cn IT - 1 I I I AS -BUILT SITE PLAN DCE #18-327 LOCATION #159 & 165 SOUTH STREET SOUTH YARMOUTH, MA SCALE : 1" = 30' DATE : DECEMBER 10, 2020 PREPARED FOR: REFERENCE : MAP 34 PARCEL 262 &263 STEPHE ,_ 0 'q' ]PALMA DANIEL off508-362-4541 fax 508-382-9880 downcape.com m own u►pe ffikMOM17.6, INC. civil engineers land surveyors 939 Maln Street ( Rte 6A) YARMOUTHPORT MA 02675 DATE A. OJALA 40 80 I�r FES \0 SUR�Ey l,i ^� REG. LAND SURVEYOR tib f �'� _ { ~�(._ ��� -- _ _. _ f ... ��. �A� Asa .W-, ;am