Loading...
HomeMy WebLinkAboutUntitled °4Y1a, TOWN OF YARMOUTH 5 µ 1146 ROUTE 28, SOUTH YARMOUTH, MA 02664-4451 �t.,,,,* , Telephone(508)398-2231 Ext. 1292—Fax(508)398-0836 RECADLD KING'S HIGHWAY HISTORIC DISTRICT COMMITTEE OCT 2 9 2019 APPLICATION FOR CERTIFICATE OF APPROPRIATENESS Tf\.nf'\I ^i FRK Application is hereby made for issuance of a Certificate of Appropriateness under Section 6 of Chapter 470, Acts of 1973 as amended,for proposed work as described below&on plans, drawings, photographs, &other supplemental info accompanying this application. PLEASE SUBMIT 4 copies OF SPEC SHEET(S), ELEVATIONS, PHOTOS, &SUPPLEMENTAL INFORMATION. Check All Categories That Apply: Indicate type of Building: Commercial V Residential 1) Exte for Building Construction: New Building Addition Alterations Reroof Garage Shed Solar Panels Other: 2) Exterior Painting: Ti:-eY Siding Vim`(Shutters RA Doors Trim((/hif: .Other: (D0015 -(--__ShiL1T-e/ w/(J X ti ii()U.5' 3) Signs/Billboards: ki Il- New Sign Change to Existing Sign 4) Miscellaneous Structures: Qu}- Fence Wall Flagpole Pool Other: Please type or print legibly: Address of proposed work: l D 7 1/44'0:-I1 Z vt T 4 ',...k.,...k. 2 Map/Lot# I J b/ I D Owner(s): U T 11 (-7 .'11 Phone#: 5 G `-''' S.fl Z All applications must be submitted by owner or accompanied by letter from owner approving submittal of application. /- c�G79" Mailing address: 00 b'( E(5 il 107 11?.n,C h 14 �'c rot OL'i- WT. Year built: C 6r C Email: (7C3/1 j L(() (- twi C ,--,7 _ n4 r Preferred notification method: / Phone Email Agent/contractor: lig,/ Phone#: Mailing Address: A/1---e__ Email: Preferred notification method: Phone Email Description of Proposed Work: ad i a eXl570'I,ApiiiRbcit -6 tv Comv Tru // '' z OCT 29 2919 Signed(Owner or agent): YARMOUTH Date: %D'r I ( f " OLD KING'S HIGHWAY Owner/contractor/agent is aware that a permit is required from the Building Department. (Check other departments,also.) If application is approved,approval is subject to a 10-day appeal period required by the Act. > This certificate is good for one year from approval date or upon date of expiration of Building Permit,whichever date shall be later. > All new construction will be subject to inspection by OKH.OKH-approved plans MUST be available on-site for framing&final inspections. For Committee use only: /Approved Approved with Modifications Denied Rcvd Date: /O—/ '/ 9 , Reason for Denial: . Amount Cash K /a r 062,1;)_ www �_ Rcvd by: 111201rr a .. . ., 45 Days: hi--45---/9 2o / '• Date Signed: /12.q2-0/? 111Prir 1 APPLICATION#: Ifto TOWN OF YARMOUTH ° G? OLD KING'S HIGHWAY HISTORIC DISTRICT COMMITTEE 1146 ROUTE 28, SOUTH YARMOUTH,MASSACHUSETTS 02664-4451 RECEIVED Telephone(508) 398-2231 Ext.1292 Fax(508)398-0836 OCT.2 9 2019 STATEMENT OF UNDERSTANDING CHANGES TO AN OLD KING'S HIGHWAY APPROVED PLAN TOWN CLERK SOUTH YARMOUTH, MA As property owner/contractor/agent for construction at /0 ? , - - - .4- Map/Lot /3(p. /Ols C/A# A 0 P - Approval Date: /O9 -/ 9 I certify that I understand the following requirements regarding any changes that may be required for this project: In accordance with paragraph 2(a) of section 1.03(General Procedures) of the OKH 972 CMR Rules and Regulations: Only minor changes may be approved by the Committee without the filing of a new application and a new hearing. Minor changes include alterations that can be done without a detrimental impact on the overall appearance of the project such as altering a single window or door change or a minor change of colors. All minor changes by amendment will require the local Committee's or its designee's approval. All changes to previously OKH approved plans require notification to and approval from the local OKH Committee. Change requests must be submitted to the Committee in writing on the appropriate request form, which may be obtained from the OKH office. All change approvals must be obtained before incorporating the change into the project. If the change has been implemented prior to receipt of OKH approval, a Minor Change approval or Certificate of Appropriateness application for the revised plans is still required and will result in a doubled filing fee for the appropriate category of work. Failure to comply with the above statements will result in the Building Department issuing a stop-work order or delaying issuance of an Occupancy Permit or final inspection approval. I have read and understand the above statements. ie 2 S Zo/q Signed: Date: / =--- l (Owner/ infractor/Agent) Ij Signed: ,,>( (Chairman, OId'King's Highway Committee) H:\OKH COMMITTEE\Application Forms\Statement of Understanding 2015.docx Updated 12/2015