Loading...
HomeMy WebLinkAboutZELCH-9of9HIGH RAFTER TIES; 1 " x 8" RAFTER TIE TIGHT TO UNDERSIDE OF RIDGE OR SIMPSON LSTA18 STRAP TIE OVER RIDGE - EACH RAFTER SET SHORT GABLE RAFTERS; 2" x 10" KD SPF ® 16" O.C. RIM JOIST; CONT. 1.75" x 11.875" BCI VERSA -LAM LVLs RUN THE FULL FACE OF THE 2ND. FLOOR BOX ONLY PITCH 15 : 12 ASPHALT SHINGLES/ 5/8" PLYWOOD SHEATHING CEILING JOISTS; 2" x 8" KID SPF 16" O.C. 3/4" T & G ADVANTECH SUB FLOOR (N & G) PITCH 4 : 12 2" x 6" x 7'-9" KID SPF 16" O.C. PROVIDE SINGLE SHOE AND DOUBLE TOP PLATES. HEADERS IN -WALL TO BE 2/ 2" x 10" W/ I" CDX FLITCH PLATES @ HEIGHTS SPECIFIED SECOND FL. JOISTS; 11 J" TJI FLOOR JOISTS 12" O.C. SEE FOUNDATION PLAN 24'-2" ALL CONSTRUCTION TO BE PERFORMED IN STRICT COMPLIANCE WITH THE MASSACHUSETTS STATE BUILDING CODE, NINTH EDITION AND WOOD FRAME CONSTRUCTION MANUAL FOR ONE- AND TWO-FAMILY DWELLINGS FOR EXPOSURE C WIND LOADS - 110 MPH ARC Designs , LLC ANY STRUCTURAL ENGINEERING REVIEW, IF NECESSARY, ALAN R. CABRAL IS AT THE DISCRETION OF THE BUILDING COMMISSIONER 508.737.8281 AND WILL BE THE RESPONSIBILITY OF THE OWNER INSULATION: 6" FIBERGLASS INSUL. = R20 (WALLS) 9" FIBERGLASS INSUL. = R30 (FLOORS) COMBINATION OF 7 4" CLOSED CELL SPRAY FOAM INSUL. & 14" FIBERGLASS INSUL. = R51 (CEILING) CONTINUOUS RIDGE BOARD; 1.75" x 11.875" LVL (NON -BEARING) PROVIDE SOLID BLOCKING AT PANEL EDGES PERPENDICULAR TO FRAMING MEMBERS IN THE FIRST TWO JOIST BAYS 4'-0" O.0 (FLOORS & ROOF) SHORT GABLE RAFTERS; 2" x 10" KID SPF ® 16" O.C. 1 /2" PLYWOOD - EXT. SHEATHING Cn "ol (RUN CONTINUOUS TO ENGAGE TOP PLATE J °' TO TOP PLATE) j PROVIDE SOLID BLOCKING z O FOR FULL PERIMETER PLYWOOD NAILING z g O ADD (3) 2" x 4" ~ TOP PLATES TO w EXISTING STUD WALL = C) z w J -i I 0 EXISTING STUD WALL - FRAMING J SECTION "N" ( 1/4" = 1' ) * VERIFY ALL DETAILS WITH BUILDER ADJUST AS REQUIRED 2" x 10" PT SPF DECK JOISTS ® 16" O.C." x 6" AZEK DECKING SOLID f BLOCKING MID -SPAN OPENING HEADERS & TRIMMERS; 2/ 2" x 10" PT SYP S1 14'-0" (JOIST SPAN) Roof Deck Scale: 1/4"=1' AREA = 196 ± SF. 42" HAND RAIL - 4" x 4" PT SYP POSTS - POST CAPS - J" x 6" TOP RAIL 2" x 4" TOP & BOTTOM RAIL 1 J" x 1 J" "CAPTURED" BALLUSTERS @ 5" O.C. 4" x 4" PT SYP THRU-DECK POSTS (3 EACH SIDE). LET THRU DECKING TIGHT TO LVL RIDGE AND VALLEY BEAMS ATTACHED W/ PAIRS OF SIMPSON LSTA18 STRAP TIES FLUSH DOUBLE PT BOX JOISTS. THRU POSTS W/ PAIRS OF a" GALV. CARRIAGE BOLTS (TO INCLUDE DEPTH OF BACK BLOCKING) — DOUBLE HANGERS; SIMPSON LUS28-2 ZMAX OR GALVANIZED PP,,, � � I M I N A P-, Y PROPOSED RENOVATION AND ADDITIONS slim No . . 51 PARK AVENUE J ESSICA ZELCH —FRAMING SECTION "M" —ROOF DECK FRAMING PLAN OCTOBER , 2020 WEST YARMOUTH 9 OF 9