Loading...
HomeMy WebLinkAboutSteel-NOI Plan REV 1 low res_ 1-26-211 KI LLL TOP OF PATIO LLLL LLLLL 04 ElEN. — 9.15'lNAVOHB LLLLLLL s JK \ -Too-0, MLW = -I. I, 3 60' OFFSET FROM MHW / -3 MLW = -4.1' P PROPOSED 2'x8' STORAGE BENCH 4'x97' 0 DOCK PLAN VIEW 5 2.5 0 5 10 20 I "=10' PROPOSED BOAT LIFT i AVOID',, _ MSTING STEPS TO BE �LpNSTRUCTED 1 aftI I � / JAI (2) 3" X 8" P.T. CAP; /W/ Y2" GALV. BOLTS 0 3 O.C. (TYP) Y2* GALV. LAG BOLTS • 3' O.C. (TYP) (ALTERNATE WITH CAP THRU-BOLTS (TYP) (2) Y X 6" P.T. CAP SUPPORTS; W/ )¢ GALV. BOLTS 0 3' O.C. (TYP) SHOREGUARD CL 9900 SHEETING (TYP) CAP DETAIL Al SCALE 1`5' L LEGEND w 1 / LLL LLLL 3 !=' LLLLL MHW If $op&srop4 LLLLLLL MEAN HIGH WATER qF / �„V'.v+i'F_��ott3ye IweCun4]i LLLLLLL eexil : e ��:,p R. �nv 'y�'fxinMln . -... !Gng eros. me•sexlace P 4 es"^'f C.eIPs I- "�LLLLLLL = —MLW MEAN LOW WATERmM.,n�Fam•- 5 Lartwhee� /2 ELEVATION CONTOUR `°"tleNa`° Sfe3� — --- m, PROPERTY LINE :.:, �� w� I,- LIMIT OF WORK/ACCESSLl lk ' s"k SHELLFISH SURVEY GRID A,.�i - rt; �n �"'rec lar � Bruch N Nexerene Q / :.«!Ileo g nE bE a' +'i¢'ii L'•�.•e SHELLFISH FOUND IN GRID " eL - r W.diva 1 t�Ape � a-�• f �.► �. � � / � � r YA R M IO U TH � M A � SURVEY NOTES: KEY MAP �. RECORD OWNER: PAUL M, AND JHDY L NO SCALE STEEL 230 ❑PEL CIRCLE, FRANKLIN, MA 02038 / ASSESSORS MAP 91, PARCEL 177 III L.C. CERTIFICATE 216466 L,C, PLAN 17002-3 BACKRLL TO WITHIN 6" OF T.O.W. 20' MINIMUM EMBEDMENT SHALL DEVELOP 18K MIN. PROPOSED CONT. P.T. 2" X 6" BACK WALE EXISTING GRADE TOP OF WALL SHALL BE NO MORE THAN 8' ABOVE EXISTING GRADE PROPOSED CAP; SEE DETAIL PROPOSED CONT. ZGREENHEART 8"x8" ANCHOR WALE 2' t DOCK WASHERS EXCAVATE TO �1"0 THREADED FACILITATE ROD ADAPTER INSTALLATION OF TIE BACK NEW 1 1/2"0 CHANCE HELICAL SCREW ANCHOR TYPE SS5 1Y2" X 5' WITH 8" & 10" FLIGHTS EXISTING GRADE ® 7'-0" O.C. MINIMUM ANCHOR PENETRATION SHALL BE 20', PROPOSED SHOREGUARD AND DEVELOP 18 KIPS MINIMUM CL 9900 VINYL SHEETING, ANCHOR FORCE PER ANCHOR 16 FEET LONG BULKHEAD DETAIL ELEVA TION VIEW 0 NOT TO SCALE �. 83' FROM MHW (ALONG SECTION LINE; (60' FROM MHW FROM PLAN VIEW OFFSET) 33.5'± TO GET -3 MLW 36'± COASTAL BEACH A 6" X 8' II ANCHOR WALE 2" X 6" 11 BACK WALE PROPOSED SHOREGUARD CL 9900 VINYL SHEETING, 16' LONG MINIMUM PROPOSED N" THRU-BOLTS; 2' O.C. (TYP) PROPOSED CHANCE HELICAL ANCHORS; 7' SPACING, (TYP) ri BULKHEAD PLAN VIEWO SCALE 1"=5' PILES, 20 FEET LONG (1 / TOTAL) C CV DCE ## LVINU lL I V IFIL) AT END) 5 2.5 0 b 10 20 cy SECTION A— A ELEVATION DETAIL op I"=10 IBJ 44 2"x6" RAILING CAP 4"x4" POST BOLTED THROUGH YOKES AND 2"x4" RAILINGS (TYP) JOISTS (TYP) 2"x12" STRINGERS (6 TOTAL, TYP) 'RECESSED DECKING OR (3) 4'x10" W/ 3/4" SPACING PROPERTY LIES WITHIN RESIDENTIAL ZONE R40. / PROPERTY LINES DEPICTED HEREON ARE BASED ON A FIELD SURVEY BY DOWN CAPE ENGINEERING IN JULY, 2019 AND COMPILED FROM PLANS ON RECORD RECORDED IN THE BARNSTABLE COUNTY REGISTRY OF DEEDS. PARCEL APPEARS TO LIE WITHIN FLOOD ZONE AE (EL. 11' NAVD 88) PER FIRM PANEL #591 OF 875, COMMUNITY MAP i NUMBER 25001CO591J EFFECTIVE DATE JULY 16, 2014 AS SHOWN ON THE FEMA ON-LINE DATA BASE. WETLAND RESOURCES SHOWN WERE FIELD IDENTIFIED BY BRAD HAL 3 DATUM FOR ALL ELEVATIONS = NAVD 88 MEAN HIGH WATER = 1.8' NAVD 88 MEAN LOW WATER = -1.1 NAVD 88 L THE PROJECT IS NOT WITHIN AN NHESP BOUNDARY AND IS THEREFORE NOT SUBJET TO MESA REVIEW PROPOSED Vx9r CONSTRUCTION NOTES: MONOPILE PIER 1. ELEVATIONS REFER TO NAVD 88. CONTACT DOWN CAPE ENGINEERING FOR ADDITIONAL ELEVATION INFORMATION AS NEEDED. 5 2, CONSTRUCTION ACCESS SHALL BE VIA THE ACCESS ROUTE SHOWN ON THE PLAN AND DIRECTLY OVER THE APPLICANT'S PROPERTY. 3, THE WORK ACTIVITY SHALL OCCUPY A MINIMUM AREA TO ACCOMPLISH THE INSTALLATION OF THE PROPOSED WORK. EQUIPMENT AND MATERIALS HANDLING SHALL BE IN ACCORDANCE WITH THE WORK PROTOCOL PROPOSED 2'x8' SUBMITTED WITH THE NOTICE OF INTENT, THE RESULTING ORDER OF CONDITIONS AND AS DIRECTED BY STORAGE BENCH THE YARMOUTH CONSERVATION AUTHORITIES. 6 4, THE DOCK INSTALLATION SHALL BE ACCOMPLISHED FROM A WORKING BARGE AS MUCH AS PRACTICAL. THE REMAINDER OF WORK SHALL BE ACCOMPLISHED BY HAND. AT NO TIME SHALL THE WORKING BARGE COME IN CONTACT WITH THE MARSH. 5 MARSH WITH SHALL MINIMAL A CTIVITYED AND OCCURRINGNTAINED BAEYONNDTOINSURE THE WORKMLIMIT.LMATEIVITY RIALSIN THE THE TI AND EQUIPMENT SHALL BE STORED ON THE APPLICANT'S PROPERTY DURING TIMES OF HIGH TIDE AND WHEN NOT IN USE. WORKING BARGE TO BE ANCHORED TO AVOID BOTTOMING OUT DURING PERIODS OF LOW TIDE. _ 6. PILES SHALL BE DRIVEN TO THE DEPTHS SPECIFIED ON THE PLAN. IF DESIGN EMBEDMENT CAN NOT BE REACHED, SHOREFRONT CONSULTING SHALL BE CONTACTED BEFORE PROCEEDING. PILES SHALL BE MECHANICALLY DRIVEN FROM THE WORKING BARGE. EACH BENT BEYOND MHW SHALL BE ANCHORED TO THE BOTTOM WITH A HELICAL OR MANTA STYLE ANCHOR FOR PROTECTION OF ICE UPLIFT. A 7, ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE RETURNED TO THEIR PRE -CONSTRUCTION CONDITION. ALL WORK SHALL BE INSPECTED BY SHOREFRONT CONSULTING AND RECEIVE APPROVAL BEFORE REMOVING EQUIPMENT FROM THE SITE. 8. THE ACCESS ROUTE AND WORK SITE SHALL BE CLEANED AND RESTORED TO RESEMBLE THE DOCK PLAN VIEW DETAIL PRE -CONSTRUCTION CONTOURS AND CONDITIONS. 5 2.5 0 5 10 20 9. THE CONTRACTOR SHALL OBTAIN A COPY OF THE ORDER OF CONDITIONS ISSUED FOR THE PROJECT BY THE YARMOUTH CONSERVATION COMMISSION PRIOR TO THE START OF ANY WORK. "=10' 10. ALL HARDWARE SHALL BE GALVANIZED OR STAINLESS STEEL, UNLESS OTHERWISE APPROVED BY OWNER OR SHOREFRONT CONSULTING. 11, THE EXISTING OUTFALL PIPE SHALL REMAIN UNCHANGED. TIMBER WALL RECONSTRUCTION AND NEW REVETMENT CONSTRUCTION SHALL WORK AROUND THIS STRUCTURE. 15, VINYL SHEETING SHALL BE SHOREGUARD CL -9900, OR EQUAL, WITH A MINIMUM SECTION MODULUS OF 20. ZLSHEETING SHALL BE 20 -FOOT LONG SHEETS, AND SHALL BE DRIVEN TO THE FULL DEPTH WITH MINIMUM CUTOFF. IF DESIGN EMBEDMENT CAN NOT BE REACHED, SHOREFRONT CONSULTING SHALL BE CONTACTED / BEFORE PROCEEDING. 16. REFER TO STRUCTURAL DRAWING ENTITLED "PLAN SHOWING 8' ENGINEERED VINYL BULKHEAD", BY /000 SHOREFRONT CONSULTING, AND STAMPED BY MARK MCKENZIE, P.E., DATED 12/12/12 FOR BULKHEAD DETAILS. THE CL9900 SHEETING SHALL BE UTILIZED TO REPLACE THE CL9000 MATERIAL WHICH IS NO LONGER AVAILABLE. THE CL9900 HAS A SECTION MODULUS OF 20 WHERE THE CL9000 HAD A SECTION MODULUS OF 16.4; THEREFORE, THE CL9900 IS A SUITABLE REPLACEMENT AND SHALL BE USED. 3/4" THROUGH—BOLTS (TYP) 3"x10" YOKE; (2) TYP. 12 8 3"x8" CROSS BRACING, (TYP) 4 ° 3/4" THROUGH BOLT WITH DOCK WASHERS (TYP) 0 8-10" GREENHEART PILE (INSTALL BUTT END DOWN, TYP) OR -4 ° "PEARSON" FIBERGLASS PILES INSTALL SCREW ANCHOR AT EACH BENT BEYOND MHW TO PREVENT ICE UPLIFT DOCK SECTION B—B ELEVATION DETAIL 1 .5 0 1 2 4 11=21 17. THE EXISTING TIMBER BULKHEAD CAN BE USED AS THE FALSEWORK FOR THE NEW BULKHEAD; THEREFORE, THE RECONSTRUCTED BULKHEAD WILL END UP 3" LANDWARD OF ITS CURRENT LOCATION. THE EXISTING TIMBER BULKHEAD SHALL BE COMPLETELY REMOVED AFTER THE NEW BULKHEAD IS STABLE. NO PART OF THIS DRAWING MAY BE USED BY ANY PARTY WITHOUT THE EXPRESS WRITTEN CONSENT OF SHOREFRONT CONSULTING AND DOWN CAPE ENGINEERING, INC. 2"x6" RAILING B CAP TYP F 191 2"x4" RAILING 5/8" THROUGH 2"x6" DECKING W/ 3/4" BOLT TYP SPACING; OVERLAP 1" (TYP) 2"x12" STRINGERS (TYP) 3"x10" 3/4" THROUGH YOKE; BOLT WITH DOCK (2) TYP. WASHERS (TYP) ,,i3 x8 CROSS BRACING, (TYP) 8-10" GREENHEART OR FIBERGLASS PILES (TYP) B DOCK SECTION A—A ELEVATION DETAIL 1 .5 0 1 2 4 1 11=2' 12't SALT MARSH PROPOSED 4'x69'± MONOPILE PIER; EX TIMBER BULKHEAD; T.O.W. DECK HEIGHT = 7.8'± NAV.:: PROPOSED PROPOSED 2'x8' ISTORAGE 1 1/26/21 DELETE REVETMENT; KEEP BULKHEAD, CHANGE TO MONOPILE a 9'1 (TO BE RECONSTRUCI .5 BATE REVISION BOAT LIFT BENCH PROJECT W. SC -135 scALE AS SHOWN DA 12/22/20 AND MOVED 3"LANDWARD DRAWN BY MCB CHECKED BY DO DRAWING NO. DOWN CAPE ENGINEERING 939 MAIN STREET YARMOUTHPORT, MA 02675 (508) 362-4541 SHOREFRONT CONSULTING CENTER STREET DENNIS PORT, MA. 02639 (508) 280-8046 WWW.SHOREFRONTCONSULTING.COM C — 1290 OF 1 SHEETS __-_:..-.-:.--lilii�l�il� -., r�;■ �:1:� .I��I�I. �I��I� ■I�I�iI. 1:��:1: �:1: �I�I� :1::►.,.,11 ■1� �I� Ilam � - �� �� — �1 I� 1 !1 1��1� :.. • .. - IIIA If ���■■I""'1McmI 1 ' I�1� —I� ��— � �i nr■r�ii ii „ 111 �1� 1� 1 �1 ::__ _��■■1.� If■1 m al In I I I lex, 0— IG �1� 1� 1 ■1 1�■1 '1� 40 r. o ra 00 120 Emil Z PROPOSED PROR.PSED "PEARSON" 0"0 PRO- "PEhRiON" 12"0 PILES, 30 FEET PROPOSED "PEARSON" 10"0 PILES, 20 FEET LONG (1 / TOTAL) C CV DCE ## LVINU lL I V IFIL) AT END) 5 2.5 0 b 10 20 cy SECTION A— A ELEVATION DETAIL op I"=10 IBJ 44 2"x6" RAILING CAP 4"x4" POST BOLTED THROUGH YOKES AND 2"x4" RAILINGS (TYP) JOISTS (TYP) 2"x12" STRINGERS (6 TOTAL, TYP) 'RECESSED DECKING OR (3) 4'x10" W/ 3/4" SPACING PROPERTY LIES WITHIN RESIDENTIAL ZONE R40. / PROPERTY LINES DEPICTED HEREON ARE BASED ON A FIELD SURVEY BY DOWN CAPE ENGINEERING IN JULY, 2019 AND COMPILED FROM PLANS ON RECORD RECORDED IN THE BARNSTABLE COUNTY REGISTRY OF DEEDS. PARCEL APPEARS TO LIE WITHIN FLOOD ZONE AE (EL. 11' NAVD 88) PER FIRM PANEL #591 OF 875, COMMUNITY MAP i NUMBER 25001CO591J EFFECTIVE DATE JULY 16, 2014 AS SHOWN ON THE FEMA ON-LINE DATA BASE. WETLAND RESOURCES SHOWN WERE FIELD IDENTIFIED BY BRAD HAL 3 DATUM FOR ALL ELEVATIONS = NAVD 88 MEAN HIGH WATER = 1.8' NAVD 88 MEAN LOW WATER = -1.1 NAVD 88 L THE PROJECT IS NOT WITHIN AN NHESP BOUNDARY AND IS THEREFORE NOT SUBJET TO MESA REVIEW PROPOSED Vx9r CONSTRUCTION NOTES: MONOPILE PIER 1. ELEVATIONS REFER TO NAVD 88. CONTACT DOWN CAPE ENGINEERING FOR ADDITIONAL ELEVATION INFORMATION AS NEEDED. 5 2, CONSTRUCTION ACCESS SHALL BE VIA THE ACCESS ROUTE SHOWN ON THE PLAN AND DIRECTLY OVER THE APPLICANT'S PROPERTY. 3, THE WORK ACTIVITY SHALL OCCUPY A MINIMUM AREA TO ACCOMPLISH THE INSTALLATION OF THE PROPOSED WORK. EQUIPMENT AND MATERIALS HANDLING SHALL BE IN ACCORDANCE WITH THE WORK PROTOCOL PROPOSED 2'x8' SUBMITTED WITH THE NOTICE OF INTENT, THE RESULTING ORDER OF CONDITIONS AND AS DIRECTED BY STORAGE BENCH THE YARMOUTH CONSERVATION AUTHORITIES. 6 4, THE DOCK INSTALLATION SHALL BE ACCOMPLISHED FROM A WORKING BARGE AS MUCH AS PRACTICAL. THE REMAINDER OF WORK SHALL BE ACCOMPLISHED BY HAND. AT NO TIME SHALL THE WORKING BARGE COME IN CONTACT WITH THE MARSH. 5 MARSH WITH SHALL MINIMAL A CTIVITYED AND OCCURRINGNTAINED BAEYONNDTOINSURE THE WORKMLIMIT.LMATEIVITY RIALSIN THE THE TI AND EQUIPMENT SHALL BE STORED ON THE APPLICANT'S PROPERTY DURING TIMES OF HIGH TIDE AND WHEN NOT IN USE. WORKING BARGE TO BE ANCHORED TO AVOID BOTTOMING OUT DURING PERIODS OF LOW TIDE. _ 6. PILES SHALL BE DRIVEN TO THE DEPTHS SPECIFIED ON THE PLAN. IF DESIGN EMBEDMENT CAN NOT BE REACHED, SHOREFRONT CONSULTING SHALL BE CONTACTED BEFORE PROCEEDING. PILES SHALL BE MECHANICALLY DRIVEN FROM THE WORKING BARGE. EACH BENT BEYOND MHW SHALL BE ANCHORED TO THE BOTTOM WITH A HELICAL OR MANTA STYLE ANCHOR FOR PROTECTION OF ICE UPLIFT. A 7, ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE RETURNED TO THEIR PRE -CONSTRUCTION CONDITION. ALL WORK SHALL BE INSPECTED BY SHOREFRONT CONSULTING AND RECEIVE APPROVAL BEFORE REMOVING EQUIPMENT FROM THE SITE. 8. THE ACCESS ROUTE AND WORK SITE SHALL BE CLEANED AND RESTORED TO RESEMBLE THE DOCK PLAN VIEW DETAIL PRE -CONSTRUCTION CONTOURS AND CONDITIONS. 5 2.5 0 5 10 20 9. THE CONTRACTOR SHALL OBTAIN A COPY OF THE ORDER OF CONDITIONS ISSUED FOR THE PROJECT BY THE YARMOUTH CONSERVATION COMMISSION PRIOR TO THE START OF ANY WORK. "=10' 10. ALL HARDWARE SHALL BE GALVANIZED OR STAINLESS STEEL, UNLESS OTHERWISE APPROVED BY OWNER OR SHOREFRONT CONSULTING. 11, THE EXISTING OUTFALL PIPE SHALL REMAIN UNCHANGED. TIMBER WALL RECONSTRUCTION AND NEW REVETMENT CONSTRUCTION SHALL WORK AROUND THIS STRUCTURE. 15, VINYL SHEETING SHALL BE SHOREGUARD CL -9900, OR EQUAL, WITH A MINIMUM SECTION MODULUS OF 20. ZLSHEETING SHALL BE 20 -FOOT LONG SHEETS, AND SHALL BE DRIVEN TO THE FULL DEPTH WITH MINIMUM CUTOFF. IF DESIGN EMBEDMENT CAN NOT BE REACHED, SHOREFRONT CONSULTING SHALL BE CONTACTED / BEFORE PROCEEDING. 16. REFER TO STRUCTURAL DRAWING ENTITLED "PLAN SHOWING 8' ENGINEERED VINYL BULKHEAD", BY /000 SHOREFRONT CONSULTING, AND STAMPED BY MARK MCKENZIE, P.E., DATED 12/12/12 FOR BULKHEAD DETAILS. THE CL9900 SHEETING SHALL BE UTILIZED TO REPLACE THE CL9000 MATERIAL WHICH IS NO LONGER AVAILABLE. THE CL9900 HAS A SECTION MODULUS OF 20 WHERE THE CL9000 HAD A SECTION MODULUS OF 16.4; THEREFORE, THE CL9900 IS A SUITABLE REPLACEMENT AND SHALL BE USED. 3/4" THROUGH—BOLTS (TYP) 3"x10" YOKE; (2) TYP. 12 8 3"x8" CROSS BRACING, (TYP) 4 ° 3/4" THROUGH BOLT WITH DOCK WASHERS (TYP) 0 8-10" GREENHEART PILE (INSTALL BUTT END DOWN, TYP) OR -4 ° "PEARSON" FIBERGLASS PILES INSTALL SCREW ANCHOR AT EACH BENT BEYOND MHW TO PREVENT ICE UPLIFT DOCK SECTION B—B ELEVATION DETAIL 1 .5 0 1 2 4 11=21 17. THE EXISTING TIMBER BULKHEAD CAN BE USED AS THE FALSEWORK FOR THE NEW BULKHEAD; THEREFORE, THE RECONSTRUCTED BULKHEAD WILL END UP 3" LANDWARD OF ITS CURRENT LOCATION. THE EXISTING TIMBER BULKHEAD SHALL BE COMPLETELY REMOVED AFTER THE NEW BULKHEAD IS STABLE. NO PART OF THIS DRAWING MAY BE USED BY ANY PARTY WITHOUT THE EXPRESS WRITTEN CONSENT OF SHOREFRONT CONSULTING AND DOWN CAPE ENGINEERING, INC. 2"x6" RAILING B CAP TYP F 191 2"x4" RAILING 5/8" THROUGH 2"x6" DECKING W/ 3/4" BOLT TYP SPACING; OVERLAP 1" (TYP) 2"x12" STRINGERS (TYP) 3"x10" 3/4" THROUGH YOKE; BOLT WITH DOCK (2) TYP. WASHERS (TYP) ,,i3 x8 CROSS BRACING, (TYP) 8-10" GREENHEART OR FIBERGLASS PILES (TYP) B DOCK SECTION A—A ELEVATION DETAIL 1 .5 0 1 2 4 1 11=2' ry i 1 1/26/21 DELETE REVETMENT; KEEP BULKHEAD, CHANGE TO MONOPILE MCB NO. BATE REVISION 6Y SHEEP TITLE PLAN SHOWING PROPOSED ROCK REVETMENT AND BOAT LIFT PROJECT W. SC -135 scALE AS SHOWN DA 12/22/20 PROJECT PAUL AND JOD Y STEEL A VIEW DRIVESOUTH YARMOUTH.STEEL.DWG DRAWN BY MCB CHECKED BY DO DRAWING NO. DOWN CAPE ENGINEERING 939 MAIN STREET YARMOUTHPORT, MA 02675 (508) 362-4541 SHOREFRONT CONSULTING CENTER STREET DENNIS PORT, MA. 02639 (508) 280-8046 WWW.SHOREFRONTCONSULTING.COM C — 1290 OF 1 SHEETS