Loading...
HomeMy WebLinkAboutRequest for COCCAPE COD ENGINEERING, INC. Robert M. Perry, P.E. P.O. Box 1517 East Dennis, MA 02641 Tel./Fax 508-385-1445 / Fax 508-385-1446 bobperry(&-capecod.net January 25, 2021 Town of Yarmouth Conservation Commission 1146 Route 28 South Yarmouth, MA 02664 RE: SE 83-1418 Certificate of Compliance - 45 Crosby Street Ext, South Yarmouth Map 51 Parcel 73 - Patio To the Conservation Commission, Attached please find Form 8A for the Request for Certificate of Compliance for SE 83-1418 and a check in the amount of $75. The applicant is seeking a Certificate of Compliance at this time. With our recent familiarity and involvement with the site I have agreed to file for the Certificate of Compliance. A site review and review of the Order of Conditions shows the addition project appears to be completed with substantial compliance with the plan. I note two differences between the approved plan, the Order of Conditions and the current conditions of the site. The two items are the existing patio surface and the concept of required roof drain drywells as required in Special Condition 11. • The patio existing in 1997.had an arched edged and measured approx. 160 s.f sq. ft. The existing patio completed in connection with the project more than 22 years ago is rectangular and approximately 287 s.f.. The applicant indicated that there were no details of landscaping and the site disruption within the work limit was restored as it had been but with less lawn taken up by the longer length of patio against the house. • The condition for drywells may not be as necessary at this time with the upland site conditions being stable. Often undersized, drywells are most useful for controlling roof runoff on newly developed sites and with steeper terrain. In reviewing the roof drains with the applicant, we looked for signs of related trouble. The roof downspouts discharge to the garden beds and lawn near the house with no sign of erosion in the lawn or gardens. The coastal bank erosion does not appear to be affected by the roof volume and there is no significant pollution threat from roof runoff. Based on the applicants 22 years of history with the property the request is to forgo the use of roof drain drywells. With the above noted variations accounted for and considered, the project components outlined in the Order of Conditions were satisfactorily completed. Please contact me directly should you have any questions. Sincerely, Cape Cod ng, Inc. Robert M. P Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. r� Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands VNPA Form 8A — Request for Certificate of Compliance SE 83-1418 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP Town of Yarmouth Wetland By-law, Chapter 143 A. Project Information 1. This request is being made by: Cape Cod Engineering, Inc. Name PO Box 1517 Mailing Address East Dennis 508-385-1445 Phone Number MA 02641 State Zip Code 2. This request is in reference to work regulated by a final Order of Conditions issued to: Upon completion of the work 3 authorized in an Order of Conditions, the property owner must request a Certificate of 4 Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. Paul & Cynthia M Applicant 9/4/1997 Dated The project site is located at: 45 Crosby Street Ext Street Address 51 SE 83-1418 DEP File Number South Yarmouth Cityrrown 73 Assessors Map/Plat Number Parcel/Lot Number The final Order of Conditions was recorded at the Registry of Deeds for: Property Owner Barnstable County Certificate (if registered land) 5. This request is for certification that (check one): 10954 35 Book Page ❑ the work regulated by the above -referenced Order of Conditions has been satisfactorily completed. ® the following portions of the work regulated by the above -referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). Please see attached letter ❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaform8a.doc -- rev. 5/29/14 Page 1 of 2 Massachusetts Department of Environmental Protection DEP File Number- Bureau umberBureau of Resource Protection - Wetlands V%fPA Form 8A — Request for Certificate of Compliance SE 83-1418 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP Town of Yarmouth Wetland By-law, Chapter 143 A. Project Information (cont.) 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? ® Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. ❑ No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see http://www.mass.ciov/eea/agencies/massdeplabout/contacts/find-the-massdep-regional-office- for-your-city-or-town.html). wpaform8a.doc -- rev. 5/29/14 Page 2 of 2