January 25, 2021
Town of Yarmouth
Conservation Commission
1146 Route 28
South Yarmouth, MA 02664
RE: SE 83-1418 Certificate of Compliance - 45 Crosby Street Ext, South Yarmouth
Map 51 Parcel 73 - Patio
To the Conservation Commission,
Attached please find Form 8A for the Request for Certificate of Compliance for SE 83-1418 and a check in the
amount of $75. The applicant is seeking a Certificate of Compliance at this time.
With our recent familiarity and involvement with the site I have agreed to file for the Certificate of Compliance.
A site review and review of the Order of Conditions shows the addition project appears to be completed with
substantial compliance with the plan. I note two differences between the approved plan, the Order of
Conditions and the current conditions of the site. The two items are the existing patio surface and the concept
of required roof drain drywells as required in Special Condition 11.
• The patio existing in 1997.had an arched edged and measured approx. 160 s.f sq. ft. The existing patio
completed in connection with the project more than 22 years ago is rectangular and approximately 287
s.f.. The applicant indicated that there were no details of landscaping and the site disruption within the
work limit was restored as it had been but with less lawn taken up by the longer length of patio against
the house.
• The condition for drywells may not be as necessary at this time with the upland site conditions being
stable. Often undersized, drywells are most useful for controlling roof runoff on newly developed sites
and with steeper terrain. In reviewing the roof drains with the applicant, we looked for signs of related
trouble. The roof downspouts discharge to the garden beds and lawn near the house with no sign of
erosion in the lawn or gardens. The coastal bank erosion does not appear to be affected by the roof
volume and there is no significant pollution threat from roof runoff. Based on the applicants 22 years of
history with the property the request is to forgo the use of roof drain drywells.
With the above noted variations accounted for and considered, the project components outlined in the Order of
Conditions were satisfactorily completed.
Please contact me directly should you have any questions.
Sincerely,
Cape Cod ng, Inc.
Robert M. P
Important:
When filling out
forms on the
computer, use
only the tab
key to move
your cursor -
do not use the
return key.
r�
Massachusetts Department of Environmental Protection
DEP File Number:
Bureau of Resource Protection - Wetlands
VNPA Form 8A — Request for Certificate of Compliance SE 83-1418
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
Town of Yarmouth Wetland By-law, Chapter 143
A. Project Information
1. This request is being made by:
Cape Cod Engineering, Inc.
Name
PO Box 1517
Mailing Address
East Dennis
508-385-1445
Phone Number
MA 02641
State Zip Code
2. This request is in reference to work regulated by a final Order of Conditions issued to:
Upon completion
of the work 3
authorized in
an Order of
Conditions, the
property owner
must request a
Certificate of 4
Compliance
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed.
Paul & Cynthia M
Applicant
9/4/1997
Dated
The project site is located at:
45 Crosby Street Ext
Street Address
51
SE 83-1418
DEP File Number
South Yarmouth
Cityrrown
73
Assessors Map/Plat Number Parcel/Lot Number
The final Order of Conditions was recorded at the Registry of Deeds for:
Property Owner
Barnstable
County
Certificate (if registered land)
5. This request is for certification that (check one):
10954 35
Book Page
❑ the work regulated by the above -referenced Order of Conditions has been satisfactorily completed.
® the following portions of the work regulated by the above -referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
Please see attached letter
❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaform8a.doc -- rev. 5/29/14 Page 1 of 2
Massachusetts Department of Environmental Protection
DEP File Number-
Bureau
umberBureau of Resource Protection - Wetlands
V%fPA Form 8A — Request for Certificate of Compliance SE 83-1418
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
Town of Yarmouth Wetland By-law, Chapter 143
A. Project Information (cont.)
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
® Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
❑ No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http://www.mass.ciov/eea/agencies/massdeplabout/contacts/find-the-massdep-regional-office-
for-your-city-or-town.html).
wpaform8a.doc -- rev. 5/29/14 Page 2 of 2