Loading...
HomeMy WebLinkAboutRequest for Certificate of ComplianceCAPE COD ENGINEERING, INC. Robert M. Perry, P.E. P.O. Box 1517 East Dennis, MA 02641 Tel./Fax 508-385-1445 / Fax 508-385-1446 bobperry(a cayecod.net January 25, 2021 Town of Yarmouth Conservation Commission 1146 Route 28 South Yarmouth, MA 02664 RE: SE 83-1663 Certificate of Compliance — Sailing Village Way, South Yarmouth Map 51 Parcel 81— Sheathing Repair To the Conservation Commission, Attached please find Form 8A for the Request for Certificate of Compliance for SE 83- 1663 and a check in the amount of $75. The project to install vinyl sheathing along the lower segment of the entire bulkhead was completed. The work was necessary because of the unfortunate poor quality of treated lumber available in the early 1990's used in the marina rehabilitation. The vinyl sheet work was completed shortly after the Order was issued. Recent inspections showed it is in good condition and installed consistently with the plan. I hereby certify that the project component was installed according to the plan and the Order of Conditions and the completed project warrants issuance of a Certificate of Compliance. Please contact me directly should you have any questions. Sincerely, Cape Cod Engineeriq, Inc. Robert M. Pe Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. _ I� Int Upon completion of the work authorized in an Order of Conditions, the property owner must request a Certificate of Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: VVPA Form 8A — Request for Certificate of Compliance SE 83-1663 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP Town of Yarmouth Wetland By-law, Chapter 143 A. Project Information This request is being made by: Cape Cod Engineering, Inc. Name PO Box 1517 Mailing Address East Dennis 508-385-1445 Phone Number MA State 2. This request is in reference to work regulated by a final Order of Conditions issued to: Ship Shops, Inc. Applicant 5/04/2004 SE 83-1663 Dated DEP File Number 3. The project site is located at Sailing Village Way Street Address 51 Assessors Map/Plat Number South Yarmouth City/Town 81 Parcel/Lot Number 4. The final Order of Conditions was recorded at the Registry of Deeds for: Alyson Taubert Property Owner (if different) Barnstable Certificate (if registered land) 5. This request is for certification that (check one): 02641 Zip Code 18769 176 Book Page ® the work regulated by the above -referenced Order of Conditions has been satisfactorily completed. ❑ the following portions of the work regulated by the above -referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). ❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaform8a.doc -- rev. 5/29/114 Page 1 of 2 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands L11 WPA Form 8A — Request for Certificate of Compliance SE 83-1663 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP Town of Yarmouth Wetland By-law, Chapter 143 A. Project Information (cont.) 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? ® Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see htti)://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office- for-your-city_or-town.html). wpaformSa.doc -- rev. 5/29/14 Page 2 of 2