Loading...
HomeMy WebLinkAboutSummary of Plan changes Grant, Kelly From:Mark Burgess <shorefrontconsulting@gmail.com> Sent:Thursday, February 11, 2021 5:41 PM To:Grant, Kelly Subject:summary of changes for the Steel Project Attachments:8' STAMPED BULKHEAD DETAILS.pdf Attention! This email originates outside of the organization. Do not open attachments or click links unless you are sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure. Otherwise delete this email. Hi Kelly; I am printing this email out and putting it with the plans, so all the changes are in one place. The following changes were made to the Steel Plan; The revetment was deleted and the existing timber bulkhead is shown to be replaced, constructing it directly behind the existing wall. The details were added to the plan for the bulkhead and the revetment details were removed. I also included the 8' wall design, stamped plan that is referenced on the plan. I rotated the dock slightly to line up better to the property; the end of the dock remains exactly where it was; I pivoted the dock around the end of it. I added a note for the mechanical stops so that the boat can't operate in less than 3 feet of water. I re-labled the vegetated buffer to reflect 5' wide. I added a suggested planting schedule. I made some minor drafting corrections. That should do it, I believe. Dropping them off now. -- Mark Burgess Shorefront Consulting B.S. Ocean Engineering "If You Want A Dock, We Have To Talk" "Engineers get to work when they say it can’t be done….." 290 Center Street, Dennis Port, MA 02639 Phone: 508-280-8046 1 Email: shorefrontconsulting@gmail.com Web: www.shorefrontconsulting.com Facebook: Shorefront Consulting I build my business on referrals. If you know anyone who can benefit from my services, please let me know. 2