HomeMy WebLinkAbout34-262-263_14-
I R;
Awl
BVWlA
so,
PATIO
POOL
4SHED
EXISTING 5,
DWELLING
TOF = 9.2
FFLR=10.4
all
41.2'
EXISTING
GARAGE PAVED
DRIVE
4_
Foundation on Approved
AS -BUILT SITE PLAN DCE #18-327
LOCATION #159 & 165 SOUTH STREET SOUTH YARMOUTH, MA
SCALE : 1 30' DATE : OCTOBER 26, 2020 PREPARED FOR:
REFERENCE MAP 34 PARCEL 262 & 263 STEPHUN' PALMA
off 608-362-4641
f.. 506-362-9880
dcwnccpsxcm 0
-1 wo cope e#j*,reri#,f, me.
civil engineers
land surve>vrs
939 Maln Street ( Rte 6A)
YARMOUMPORr MA 02675 DATE REG. LAND SURVEYOR
Ln
rn
4_
Foundation on Approved
AS -BUILT SITE PLAN DCE #18-327
LOCATION #159 & 165 SOUTH STREET SOUTH YARMOUTH, MA
SCALE : 1 30' DATE : OCTOBER 26, 2020 PREPARED FOR:
REFERENCE MAP 34 PARCEL 262 & 263 STEPHUN' PALMA
off 608-362-4641
f.. 506-362-9880
dcwnccpsxcm 0
-1 wo cope e#j*,reri#,f, me.
civil engineers
land surve>vrs
939 Maln Street ( Rte 6A)
YARMOUMPORr MA 02675 DATE REG. LAND SURVEYOR