Loading...
HomeMy WebLinkAboutOOCMassachusetts Department of Environmental Provided by MassDEP: Protection MassDEP File #:083-2270 Bureau of Resource Protection - Wetlands eDEP Transaction #:1262491 WPA Form 5 - Order of Conditions City/Ibwn:YARMOUTH Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 ALLOWED IN A WETLAND OR WATERWAY. SC#12. WASHING OF EQUIPMENT/TOOLS SHALL BE DONE OFF -SITE OR HANDLED IN A MANNER APPROPRIATE BY THE CONSERVATION ADMINISTRATOR SC#13. NO EQUIPMENT SHALL BE REFUELED, NOR SHALL FUEL BE STORED WITHIN 100 FEET OF A RESOURCE AREA. SC# 14. ANY AREA THAT IS DISTURBED DURING CONSTRUCTION SHALL BE REVEGETATED IMMEDIATELY OR AS SOON AFTER AS THE GROWING SEASON COMMENCES, WITH APPROPRIATE NATIVE PLANTINGS. PERMANENT STABILIZATION SHALL BE CARRIED OUT IN ORDER TO MINIMIZE EROSION. SC#15. NATIVE VEGETATION SHALL BE PLANTED PER THE APPROVED PLAN AND REVISED NOTICE OF INTENT. THE NATIVE VEGETATION SHALL BE LEFT UNDISTURBED. THIS IS AN ON -GOING CONDITION, THAT DOES NOT EXPIRE WITH THE ISSUANCE OF A CERTIFICATE OF COMPLIANCE. THE APPLICANT MUST WAIT UNTIL THE 3RD, GROWING SEASON IS COMPLETE BEFORE THE REQUEST FOR A CERTIFICATE OF COMPLIANCE IS SUBMITTED. DURING THIS TIME PERIOD, THE COMMISSION/CONSERVATION ADMINISTRATOR MAY REQUIRE ADDITIONAL PLANTINGS IF IT IS DETERMINED THAT ANY SPECIMENS ARE DEAD OR DYING AND NEED REPLACEMENT. SC#16. AN ANNUAL MONITORING REPORT SHALL BE PROVIDED AT THE END OF THE GROWING SEASON TO CHECK FOR EROSION ISSUES AND PLANT GROWTH. SC#17. LANDSCAPE DEBRIS, INCLUDING LEAVES, GRASS CLIPPINGS, BRUSH, OR OTHER SHALL NOT BE ALLOWED WITHIN THE WETLAND RESOURCE AREA. THIS IS AN ON -GOING CONDITION THAT DOES NOT EXPIRE WITH THE ISSUANCE OF A CERTIFICATE OF COMPLIANCE. SC#18. A STAMPED "AS BUILT PLAN' SHALL BE CERTIFIED BY THE DESIGN ENGINEER (MASSACHUSETTS REGISTERED PROFESSIONAL ENGINEER OR LAND SURVEYOR) AND WILL CERTIFY THAT THIS PROJECT HAS BEEN COMPLETED IN ACCORDANCE WITH THE "ORDER OF CONDITIONS" BEFORE A CERTIFICATE OF COMPLIANCE WILL BE ISSUED. THE AS -BUILT PLAN SHALL INDICATE THE STRUCTURE LOCATION, GRADIENTS, DISTANCES TO THE RESOURCE AREAS, AND OTHER PERTINENT INFORMATION DESCRIBED IN THE APPLICATION AND APPROVED PLANS. ANY DEVIATION FROM THE APPROVED PLAN SHALL BE IDENTIFIED. SC#19. UPON COMPLETION OF THE PROJECT, A "REQUEST FOR A "CERTIFICATE OF COMPLIANCE" SHALL BE SUBMITTED BY THE APPLICANT TO THE CONSERVATION COMMISSION FOR REVIEW. THE "ORDER OF CONDITIONS" SHALL BE CONSIDERED INCOMPLETE UNTIL THE "CERTIFICATE OF COMPLIANCE" IS ISSUED BY THE CONSERVATION COMMISSION AND RECORDED AT THE REGISTRY OF DEEDS. Page 9 of 12 * ELECTRONIC COPY