Loading...
HomeMy WebLinkAboutEngineer Plans - 1998NQUS 1. LOCUS IS A.M. 26, PARCEL USE. 0 0.0 2. ELEVATIONS SHOWN ARE NGVD29 BASED UPON FEMA BM RM27=7.46. 3. ITS LOCUS SCALES IN FLOOD ZONE B ON FIRM DAM JULY 2, 1992. 4. ALL PIPES TO BE 4" SCH 40, AND PITCHED AT 1/4" PER FOOT. (UNLESS NOTED) . MUNICIPAL WATER IS AVAILABLE. LOTS WITHIN TOO` ARE ON TOWN WATER. e. COMPONENTS TO BE AASHTO H -W, UNLESS NOTED. 7. INLET TEE TO PROJECT DOWN 13", OUTLET FEE DOWN 141 B. IF TWO OR MORE LINES, WATER TEST D BOX FOR EQUAL ROW N� D -BOX EXIT PIPES TO BE LEVEL FOR EAST TWO FEET. E. DEPTH OF COMPONENTS NOT TO EXCEED 3` OR VENTING MUST BE PROVIDED. MGGLAY\NG BUILD UP COVERS TO WITHIN 1' OF GRADE. MORTON CHIMNEYS IN PLACE, eQ\\.� NOT TO SCALE Or BUG 0 • 11'04 1 I 3 I 1 3 1 At a ONE COVER OF TANK TO BE WIhUN 6 OF GRADEG -- 10. STONE TO BE DOUBLE WASHED 3/4 i0 l 1/2" WITH 2 MIN. 1/e TO 1/2" PEASTONE ON TOP. �y.\`+Z\N 11.D 11 1 I , M I LDGATIDN II 11, IF UNSUITABLE SOILS, OR SOILS DIFFERIIJG FROM THE 501L LOG ARE FOUND, 1 CONTACT THE BOARD OF HEALTH, OR R.J,CADILLAC. � 12302 12, IF AN OVERDID IS CALLED FOR BELOW FILL MATERIAL FOR 5' AROUND AND UNDER LEACHING " • 10J I IS TO BE CLEAN GRANDULAR SAND MEETING SPECIFICATIONS OF 310CVR 15.250, 1,1 PUMP AND FILL ANY EXISTING CESSPOOLS. REMOVE ANY CLOGGED SOIL, BLOCK, AND STONE IN �e- LEACH AREA, AND DISPOSE OF AS DIRECTED BY HEALTH AGENT GTYI . b' 1 14, ALL CONSTRUCTION TO MEET TITLE 5 AND LOCAL REGULATIONS. 1,5 y SD" . 10T9 1 /- l 7 1 TEST HOLE '1 �6�\ -h z 1 DEPTH gnaree) BLEV(Set) 5 r `� d 1OT4 I hyml 1 is Fn as FS. n_ 10 -'� 1b.e ISI 1 a __ _ \ e , f 1 G.5 - J 1 I /E 10 tON 4/1 BUNCH MAFN--TGF 6" 0'\ 1fj \ "QS f i / Igil 9.5 1 ig" Iooto .ana SPIRE SEi=i1J9 NGVD28 Jp!\S qq��0/ 1 I IoW 10N 6 �1Q '(D 00Fm5 \V �..� 10.6' tU:9 �LJP / I 3T IccmYecnASBUILT � 9.5 APPROXIMATEER&ATIONBA ED N,1 \A IS p652� 1 5 it 010.7 1// �1 1 BENCH MPRH --TOP 6" SPIKE 16. .1c I I SET 9J3 NGVD29 C Ivyer 25Y 6/6 UPON INFORMATION. CARD ARADO I-\ 10.6 I 5A mmlum acne ASSES TIES IN SOME CASES TIES PRODUCED 11'9. 11.9 "'fl,5 1\1.0 1 �'.. do TWO POSSIBLE LOCATIONS. 11 7z \ 10.5) I MOST LIKELY SHOWN. / \\ �`Z< \ n1\ - / I TEST HOLE DATE: June 18 1998 <eeL.vss •ate, ea f 10.9 pFq? r 1 PERFORMED BY: Ron Cadillac,sol Evaluator BS" - - 1.9-.,7 x I 1 WITNESSED BY: Amy L Von HI RS 0 E /NI� / ✓// 1.6 1tSN 11.0 8 T I 1 PERC RATE <2 00 finch (C layer) CY 28 /VIN/ E, % / _ I I SOIL SURVEY(1993) : Crown a a � ane X60 .11.9 ,(Y/ 11.0 10R 103 / 1 GEOLOGIC MAF(1986): Harwich outw°sn plain deposits Til Q, N.A;j� 11.8 !/// N 5 re 0 11.4// /i 11.1 -9 " 06 1 I TEST HOLE 2 1.4 y2 F� T 1 k 114 a/1 10 03 1 DEFTA Onvnes) EFv.h"O) We Aloammaa/z -fl J? / ,,, 1 ml 11 / / FAA 10.9 �•' .4 I a" r wna 5/2 11.6 goP?��. 109 9 D I a" m 11 - _ _ I B 1 , 1DY. s/e o.o 6 r �12.OtA / � / 11. 20 1 11 �� IGT A1.4 11,a 11 1 - ' 1 - 7 { 1 N u. mY ewS 79 B Y,�> j 1 v mN 2% # IF N\1 00 � 2� TF 113 Imo, L J 1 �A�r O TM fj I rarer 2,y a/5 Ipg-P/"� C 1T6 �i.s " AQUA CIRCUS 4A Mason, and R { 9.4 11.4 11.2 I �./ .17.6 11. b\ NY i 1 I�; I IN<P nTON <.HED P __ 12. \ 1500 \ v 1 / 11.3 I ALL SYSTEMS TO BE INSPECTED BY n 115 I _ / - _ ch 1 R.J. CADILLAC, IN ADDITION TO ea" s.0 120 \\� ,UNIT \ 11.5 / 'cqy:. TYP PROP I HEALTH DEPARTMENT INSPECTIONS: BUMPERS 1 +3 .moi Y9 \ 1/ e s 1 .I. I 1. CALL FOR HOLE INSPECTION Z \Z \ w c '•\x f' I AFTER REMOVAL AND PRIOR TO ur 0 pd \ 11.5 `11.3 X l 1 2 rrn& I PLACING SAND. a 1 �,, v� " 9. HAND BORING 3 g•'s. X11.6 I UNIT �6 �* 1 2. CALL FOR FINAL INSPECTION. 1 11.5 1 .22 1 8--•� T, N /v it 'i'Q�'= 9J I Draw (inches) ELEV(r,et)I oil VQ i+ 0.2 I PRGNDE ADEQUATE NONCE FOR N- 0 1m ^ HTS _ �jE 1� tV�•,N ST ^ g A 9.2 SPECiIONB. CALL BEFORE 8 AM IF \ 1 \'" I A IDT YOU NEED INSPECTION THAT DAY. V 11.4 1 11.0 1 V A S 1 5 HII 1-fi1.3_--.1 13 10 1 T T a _ i A\ V 1 3 T Clean out uO ces....a "FAR 4.4 " 11.3 11.6 A O 11.0 X UNIT 24 / x ( 9.3 72' n 1 A,1 N7P�0 m .......18118 A11p 109 d- I cosIOr5/4 11,0 \ \ At ' I and 6 I I®11.3 // � 10.171 IIENCH MAUK--TDP PK NAIL $ET 1,S6 3 1 I IN PAVEMENT = 11.27 rvGw2s 1 A, C4 `{i x.110.6 ' 11 i�H`.oA LEACH ADJUSTED {.A' 1 I TO FIT PAVE - TEST HOLE 4 \ \` 11 '1 MENTI CUT - 11 1A DEPTH (inches) ELEv.(leet) G 0 2 FO I v A oom myr 4/z 10.4 j\ V ti 1 6 Y wna T1 4 AVENN J 10 ] O SAm � A "U / G4 13 0 - I H {oWhylOso5/8 d f 11,2 \tD4 1(pg > 10, 25' I s s_ ss i 25' as pp } 110 �' 9.8 8 \ O I C lore, 25y 8/4 I j1 1 St " G 6 s' I CAUTION: 96<' m m sone 1 _ 2 PAVEMENT 6 m ;8 / (j SHORING, AND OR SUPPORT MAY BE NEEDED - - - -F _ _ c TO KEEP BUILDINGS FROM SETTLING WHERE _ BENCH M RK 1`W FK NAIL SEi •'A 1 /_ '-'� 3 5 'TAF / � - 1`710 TANNODAPE PROPOSED SNOR CLOSER 09 47 IN PAVEMENT laza NO D29 M I 1'� s i DRflIM4 a' TO BUILDINGS. ea J4 / ORMS.3 zo e,G a 1 HB 3/ 1 v q 7 1, m /(q N ( n'q o 9 - 4 9.0 MAXIMUM 1 m n. 12 10.0 1 � T BNR 4 -.... _...,� � a n Do �I 2 F04 10.� 2 aDRMS 5 1 VARY Y4 LEACH AREA 10 PROPERTY LINE BYSYSTEM 1- : N 9, o 3p i 11 \ - i \ / SYSTEM 50 CMR 1 I' Nr. z `Y - 04 ---A 9.8 _ \ 9.4 y 9,2 2 VARY SEPARATION 5.211 )TO HIGH GROUNDWATER BY 1' (4' PROVIDED). s< a ___ _ 1 ct 1-. ` 9.$ 310CMR 15.212, VSH REALTY CORP • 11.8W �- - r -a 6 \ 3. NO RESERVE AREA SHOWN FOR SYSTEMS 3, 4, 5, & 7. 31OCMR 15.248, 10 1216 W 10.3SSE ` '� 1 ? N/F 4. VARY SEPTIC TANK TO CRAWL SPACE BY: �"- •/ "-. _< m \ ( I YANNATOS SYSTEM 1- T 1 1 pNAt 3 p 6 SYSTEM 4- 2' 12.1 I 5T 1 TOBXAM q J j 9.3 SYSTEM 5- 2' 10.0 0 1 BORMS - 9.JL- C,'.. 42 1 SYSTEM 6- 4' 1 n 2-•a-""- 1 310 CMR 16.211 (1). 5. ALLOW LEACHING TO BE OFF CRAWL SPACE BY: �' SIP TY/�� PO cn \ 1 SYSTEM 2 SYSTEM 1- 9 FENCED IN ARE / I P HUMP PRO\ \ 1 SYSTEM 4- 8 - \ \ 9.7 , 9.6 SYSTEM 5 1 3 k1>H POOL A 1 9 pN1t 2 -e \ SYSTEM 6 10' T 1 .111 5\I 104 ` 1 �7-0 A SYSTEM 7 10' 1 9DRM5 \ \ 1 310 CMR 15.211 (1). J 9$ �- \ 2/ : TH\i �4 1 G. VARY PUMP TO CRAWL SPACE BY: 3 / _ n 701] \ \171\\ ;' 9.6 1\ SYSTEM 1- 6,51 .8 \ \ \ \� SYSTEM 7- 5' I A T +0 9, y19.A3 1 310 CMR 15.211 (1). t x \ l -. - - a, �, 1 7. USE 8" COVER OVER ALL LEACH AREAS. 310CMR 15.240 (9). 5 I !g - i V A M 4 9.3 8. USE e" COVER OVER MOST SEPTIC TANKS. 3'I0CMR 15228 (1). 9 10.1 3 ' I t\\ \` 1\ SNC>1pq T 99 1 1 9. VARY REMOVAL BY 3' FOR SYSTEMS i & 4 OR ANY OTHER 10.4 / UB 991 Af \ \4 ` g0µM5 1 1 ` 9.5 1 REMOVAL SHOWN IF MOVING BERRIED UTILITY LINE CAN BE + 10.3 99�Tq\I ( 11 AVOIDED. 310CMR 15.255 (S) PAVEMENT i§ 1 \1 �* \ .6 \\m 1010.1 94 w g.6 1D NO D -BOX USED SYSTEM 5. 31OCMR 15.232 (1)69.51. . N 696 AS 2405 /oL- 1 0 �/ F�^11. \\1"j*" 110 11 9.6 l 9.5 ` �-�31 RUNNING THROUGH PROPOSED LEACHINGNOTE: GAS, WATER AND OTHER S 8 70• 7 9_ ,5 - f9.4 \ AREA MUST BE MOVED. 9 4 i HENCH MARK TOF PK NAIL SET L�149.OpIN PAVEMENT = 955 NI Ro L--.10 - -\ p j - 'I0.1 8 RERO 61` f1` UTE ANY WATER LINES WITHIN _ 10' OF PROPOSED LEACHING (STATE HIG Hw USE DIG SAFEI NOT ALL UTILITIES ARE SHOWN! I ip 1H i TEST HOLE LOCATION, NUMBER W- WATER LINE MARKINGS (NOT ALL SHOWN) -0- GAS LINE MARKINGS (IF SHOWN) -SIE- UNDERGROUND ELECTRIC WIRES (NOT ALL SHOWN) " 9.5 x11.0 EXISTING Q PROPOSED ELEVATIONS ('X' MARKS POINT) 111111 ,-6-1, EXISTING CONTOUR -81 PROPOSED CONTOUR 2. UTILITY POLE (IF SHOWN) 0 EXISTNG SEPTIC COVER 28 naryNc� �mar.y O D �6, :RRNA L4M coon A ? 4°0 Oa °nxneea+ Px°°uxve+o AGENT APPROVAL DATE RECEIVED SITE PLAN MAR221001 PCP HA BEACHWOOD CONDOMINIUMS 638 ROUTE 28, WEST YARMOUTH, MA SEPTEMBER 4, 1998 SCALE: 1"=20' RONALD J. CADILLAC, PLS, RS PROFESSIONAL LAND SURVEYOR & REGISTERED SANITARIAN P.O. Box 258 WEST YARMOUTH, MA 02673 (508) 775-9700 PAGE 1 OF 3 SYSTEM 10 UMt 3 S1L1n10 4 SWD� O 4 NO BARRIER n M I I �� 11 FJ 11 NO NO BARRIER HERE SYSTEM 3� BALANCE 20' SECTION OF PIPE WHERE IT CROSSES WATER SYSTEM 0 VN.1 4 10 010.4 4 k ,StU,, p�5 Rp00�? ry try to JJ \ z io DIRECT SEWERS TO SEPTIC TANK. SYSTEM Q4 JMB SEWER TO EXIT WITH ERS BELOW SILL I OLLOWS: IT 9- 16 1/2" IT 7- 16 1/2" SYSTEM FOG BOTrOM SILL SYSTEM 10 GRADE WILL RISE OVER LEACH AREA. Pros"vP5 oEPTIG IA i% _ IIm Pro Felt PUMP CHAMBER "'°"'" 1500 GAL. H-10 Insert 765 1500 GAL.H-10 lived g.64 16' X 36' LEACH FIELD MAKE FACTORY WATER over Use Cm Baffle Propased Pipes pitched sit/16'/11. provide 6" cover MAKE FACTORY WATERT HUG 10.0 5=1/4/ff. pRKL 3/8' rvEEP/vEla xOLc TOP PEP STONE S=1/4/ft 5=1/2/fl. 1500 Gal. p^ Line proof de 1 covert 7'0 14 S=1/4/ft Protide 6" cover �,/B/ft. 1500 Gal. 1 Use 6" Stone under Proposed 4 5 7--T- 1 � REPLUMB ALL DRAINS INTO Insert 969 BEDROOMS: 3 PROPOSED SEWER LINE SYSTEM �3 REQUIRED CAPACITY: 330 GPD RAISE EXISTING LINE 1500 CAL BOTTOM LEACHING AREA: 422.6 5F WHERE IT EXITS FOUNDATION. vert it 1065 SIDE LEACHING AREA: 49.4 SF [95.8' PERIMETER X Ob' DEEP)] DESIGN CAPACITY: 349 GPD 13.3 i6' X 38' LEACH FIELD PE INTO EXISTING End tort Ircr• Um Gas Battle "*H-10 Tank may be used if bumpers/barricades erreclted 7 TOP FoorvD. to keep vehicles off. 6" 0 Invert 10.96 9.9 Pipen pitched A t/i6^/ft. propmai insert 1046 6 L & i D FLOWDIFFt1SORS Invert 9.62 H-2 /Use oce Baffle Invert 10.04 0* provide t7" wwr MAKE FACiORT o S=1/4/ft, provide 6"*cover Pr poses 104 OF COVERTES n ARM n P P rv° PUMP CHAMBER STORAGE CAPACITY: Use fi" Stone under Proposetl proposed TOP PEA STONE 5=1/8/fL 1500 Gal. S-1/8"/ft. n Rlu Arno' WEEivold lip¢ S=1/8/ft- provide 8" cover too rcP pEA s CINE TO BE PLUMBED 1500 Gal. 1 TOTAL= 10.61 TON + 5.30 TON = 15.9 TUN 2- ELECTRICAL WORK TG BE INSPECTED BY WEIGHT OF WATER --HIGH GROUNDWATER 1 m.ert 10.71 F Proposed Invert 10.21 Invert 9.66 4 O. 8.9 q" Line WEIGHT WATER= 4.74 TON Use 6" Stone under rlropoxd Proposed 1 Bottom IT FEARS _..,.,�1.._Lwxrlall_. _ 25'-I 15. 5-i _ -. -CH€CK VALVE _. _ _ VENT .., `. „_-DESIGN DATA__. 1-.12 f- 16' ALARM 2]' 8 10 y Ad1xNow t TTX OF IN �` A Hon MA H29-JNne 96 3.46 DESIGN DATA Zone Zane B GBSERVLn WATER=4.7 BEDROOMS: 6 1 l 5ti_ GARBAGE GRINDER: No . BEDROOMS: REQUIRED CAPACITY: 660 GPD LEACH AREA SEPTIC TANK: 1500 GAL. ProP^sedq• BOTTOM LEACHING AREA: 788 SF USE 7 FLOWOIFFUSORS, AS SHOWN GARBAGE GRINDER: No [AR X 12')+(24' x 12')] WITH 4' OF STONE ALL AROUND, FOR B tom 3.11 SIDE LEACHING AREA: FADS) OF A 40 BY 12' AND 24' BY 12' LEACH [152' perimeter X 0.96' deep)] AREA. DESIGN CAPACITY: 676 GPD A 5' ALL AROUND AND UNDER REMOVAL [(768 SF + 145.9 SF) X .74 GPO/SE] IS CALLED FOR DOWN 6' TO COARSE SAND. SYSTEM 9-11,7 7- 118 _ 8070M s1u GRADE WILL RISE OVER SEPTIC TANK. Mr 9 10.15 InveM1 7 1035 Invert 9.62 proposed Doe Coe Anne Invert 9.40 5 CONTACTOR 100'5 JMB SEWER TO EXIT WITH ERS BELOW SILL I OLLOWS: IT 9- 16 1/2" IT 7- 16 1/2" SYSTEM FOG BOTrOM SILL SYSTEM 10 GRADE WILL RISE OVER LEACH AREA. Pros"vP5 oEPTIG IA i% _ IIm Pro Felt PUMP CHAMBER "'°"'" 1500 GAL. H-10 Insert 765 1500 GAL.H-10 lived g.64 16' X 36' LEACH FIELD MAKE FACTORY WATER over Use Cm Baffle Propased Pipes pitched sit/16'/11. provide 6" cover MAKE FACTORY WATERT HUG 10.0 5=1/4/ff. pRKL 3/8' rvEEP/vEla xOLc TOP PEP STONE S=1/4/ft 5=1/2/fl. 1500 Gal. p^ Line proof de 1 covert 7'0 14 S=1/4/ft Protide 6" cover �,/B/ft. 1500 Gal. 1 Use 6" Stone under Proposed 9-14' 1 5 7--T- 1 � DESIGN DATA Insert 969 BEDROOMS: 3 GARBAGE GRINDER: No REQUIRED CAPACITY: 330 GPD SEPTIC TANK: 1500 CAL BOTTOM LEACHING AREA: 422.6 5F [(35.17' X 1'I')+ 3.25 X 11'] vert it 1065 SIDE LEACHING AREA: 49.4 SF [95.8' PERIMETER X Ob' DEEP)] DESIGN CAPACITY: 349 GPD [(422B SF + 49.4 5F) X .74 GPD/SF] i6' X 38' LEACH FIELD cove11 n 98 USE 5 CULTEC CONTACTOR 100'S WITH 4' OF STONE ON SIDES AND 33" STONE ON D -BOX END AND 15" STONE ON VENT END IN SHAPE SHOWN. A 2' REMOVAL IS CALLED FOR DOWN 25"3 TO MEDIUM SAND. S=1/8/ft. IFFEIPLUMID Y.E6 SYSTEM O LINES TO EXIT WITH nproposed SEE PLAN VIEW CENTERS BELOW SILL Insert 969 AS FOLLOWS TOP�T. SILL 608 SF UNIT 13- 8 1/2" PUMP seed overt 13 10.29 GRADE WILL RISE OVER SEPTIC TANK AND LEACH AREA. vert it 1065 24' A 5' REMOVAL IS CALLED FOR Invert 10 10.07 rt 964 overt 9.83 i6' X 38' LEACH FIELD PE INTO EXISTING End tort Ircr• Um Gas Battle 7 CONTACTOR 75'SI S=1/4/11. provide 6" 0 449 DEC 9.9 Pipen pitched A t/i6^/ft. S=1/8/ft. IFFEIPLUMID Y.E6 ON CENTER AND 32 FROM EDGE. LINES TO EXIT WITH nproposed SEPTIC TANK: CENTERS BELOW SILL Insert 969 AS FOLLOWS Proposed/ 608 SF UNIT 13- 8 1/2" PUMP seed UNIT 11- 8" s206" Stone under Prof UNIT 10- 10" 13 24' ver Invert 7.01 CHECK VALVE ----- 6" min. Proposed ALARM 27 1/2 3.30 ON 24" Bottum CFF 19• 434_ Inver) 959 4 0' 6.9 Use 6" Stone under Bottom 2m Propos d , 1 Bottom r- 3 l F- 27 r12=r 1 e 6" STONE UNDER 5 02' 8 A 10 - Adjustment Using MASH28-Jane 98' DESIGN DATA ZOSE B EEACH AREA OBSERVED WATER=4A BEDROOMS: 4 USE A 16' X 38' STONE LEACH AREA B - GARBAGE GRINDER: No WITH 6" EFFECTIVE DEPTH. RUN WEIGHT OF EMPTY CHAMBER AND 20" OF COVER REQUIRED CAPACITY: 440 GPD 3 PIPES DOWN CENTER 64" APART, CHAMBER= 4.12 TON (PER SHOREY) SEPTIC TANK: lips GAL ON CENTER AND 32" FROM EDGE, 20" COVER= i.a'Y X 483' X 8.5' X 0.055 TOIJ FT. B070M LEACHING AREA: 608 SF PITCH AT 1/16"/FT. CAP ENDS. 20" COVER=3.77 TON (36' x 15')] A 2' REMOVAL IS CALLED FOR TOTAL- 4.12 TON + 3.77 TON = 7.89: TON WEIGHT OF WATER --HIGH GROUNDWATER DOWN SIDE LEACHING AREA: o OF DOWN 37" TO MEDIUM SAND. (57 -2.51) X 483' X &5' x 0.0312 TPM/CU. FT. NONE WEIGHT WATER- 4.09 TON DESIGN CAPACITY: 449 GPO BUOYANCY CALCULATIONS 1500 GAL. H-10 TANK AND 20" COVER ARE HEAVER BY 3.8 TON. [SOX SF) X .74 CPD/5F] WEIGHT OF EMPTY SEPTIC TANK AND 6" OF COVER EARN & EU ME CHAMBER STORAGE CAPACITY: 440 GAL, TANK= 5.74 TON (PER SHOREY`r"R' ,•P xntc< DOSES PER DAY: > 4 8" COVER=.5' X 5.67' X 10.5' X 0.055 TONS/CU.FT. L ALARM ro BE WRED BY MUSCIF JAN ON 8" CWER=1.63 TON SEPARATE CIRCIVT RAW PUMP, TOTAL= 5.74 TON + 1,63 TON = 7.37 TON 2 ELECTRICAL WCRtt TO BE INSPELTED BY ASKED OF WATER --HIGH GROUNDWATER DOWN WIRING INSPECRSR. (5.7 -3.30) X S6P X 10.5' X 0.0312 TON/CU. FT. 3' ALARM TO BE LOCATED IN House WEIGHT WATER= 4.46 TON 4. PUMP TO BE CAPABLE OF PASSING TANK AND 6" COVER ARE HEAVIER BY 2.9 TON. 1-1/C muss AND M NUFA D IN SPLIT CONF°RNANCE NIM NANUFACNRER'S PECIWEVER NS 5, USE MEYEx MW`A, 1/2 HP PLUMP. CR LG4 SYSTEM ® EQUIVALENT. TDP BLOCK GRADE WILL RISE OVER LEACH AREA. -_ ne ",R 4--9.00 install 3 metal Covers to grade (as shown) I Am 980 �1I-3Q-F ( 10-9 DESIGN DATA BEDROOMS: 3 GARBAGE GRINDER; No 4.0' cover 6' mm. REQUIRED CAPACITY: 330 GPD LEACH AREA SEPTIC TANK: 1500 GAL. BOTTOM LEACHING AREA: 397 SF USE 7 CULLED CONTACTOR 75'S [(a2' X 48.42')] WITH 3' OF STONE ON SIDES AND S1DE LEACHING AREA: 56.6 SF 2' STONE ON ENDS FOR A 48'-5" L2GL2'+ 4&42') X 0.5' DEEP)] BY 8'2" BY 6" LEACH AREA. DESIGN CAPACITY: 335 GPD A 5' REMOVAL IS CALLED FOR [(397 SF + 56.6 SE) X .74 GPD/SF] DOWN 25' TO MEDIUM SAND, SYSTEM Proposed Invert 9.64 Use Gas & S=1/4/ft. provide 6" cover =1/8/ft 1500 Gal. R UNITS 3 Inv. unR 3--a.n ON CENTER AND 32 FROM EDGE. nproposed SEPTIC TANK: � PITCH AT 1/16"/FT CAP ENDS. 20° COVER= V X 5.25 X 9' X 0:055 TON/CU. FT. & 4, AS SHOWN. Proposed 4, AS 608 SF invert 798 PUMP CHAMBEk [16' x 36') I TOTAL= 7.25 TON + 2AO TON = 9.65 TON A 5' REMOVAL IS CALLED FOR 1000 GAL.H-20 overt 9.83 i6' X 38' LEACH FIELD PE INTO EXISTING Invert 9.69 /v/ NONE Use Gas BaiOe DESIGN CAPACITY: 449 DEC Proposed Pipen pitched A t/i6^/ft. MAY NOT NEED i'roposed Invert 9.62 Invert 9 L S=1n 4"/ft, provide t7" wwr MAKE FACiORT WATER TGHi OF COVERTES n ARM n P P rv° PUMP CHAMBER STORAGE CAPACITY: Use fi" Stone under Proposetl proposed 1500 Gal. S-1/8"/ft. n Rlu Arno' WEEivold lip¢ 5 1� B/tt too rcP pEA s CINE TO BE PLUMBED 22'-� 2' II -5' TOTAL= 10.61 TON + 5.30 TON = 15.9 TUN 2- ELECTRICAL WORK TG BE INSPECTED BY WEIGHT OF WATER --HIGH GROUNDWATER DOWN F MAKE FFUCTUNY 1 ALARM TO BE LWATED IN HOUSE. q" Line WEIGHT WATER= 4.74 TON [ uv de 8" f - PROVIDE THIS PLAN IS A VALID COPY ONLY IF IT FEARS _..,.,�1.._Lwxrlall_. _ _. kH4i31G Invert$E6. _ _ -. -CH€CK VALVE _. _ _ VENT .., `. „_-DESIGN DATA__. - Provaled ALARM 2]' min �: _ TTX OF IN �` I 3.46 ON e I Bottom Use G' Stone under OFF 1 l 5ti_ Invest 9.59 6'6' BEDROOMS: 2 ProP^sedq• 4.0' Softam GARBAGE GRINDER: No I B tom 3.11 4 CONTACTOR 1005 DO TOO' PEA STONE provide §" cover 6" min. A-38 I I I REQUIRED CAPACITY: 220 GPD LEACH AREA F- B-�D , -t 0' -i -t �' F-1. SEPTIC TANK: 1500 GAL. 4 0.2' 8 or 10 YU Adjustment B' STO E UNDER Using MASH29-June 98 BOTTOM LEACHING AREA: 319 5F USE 4 DUCTED CONTACTOR 1005 LEACH AREA zone B [(29' x H')] WITH 4' OF STONE ON SIDES AND DESIGN DATA OBSERVED WATER -47 SIDE LEACHING AREA: 40 SF 1' STONE ON ENDS FOR A 29' BY USE A 16' X 38' STONE LEACH AREA BUOYANCY_PUMP CHAMBER [2(fl'+ 29') x 0.9' DEEP)] it' BY 6" LEACH AREA. BEDROOMSR(UNIT9 3 is 4) 4 WITH 6" EFFECTIVE DEPTH. RUN UJ CAPACITY: 265 GPD A 5' REMOVAL 15 CALLED FOR GARBAGE GRINDER: No 3 PIPES DOWN CENTER 64" APART, WEIGHT OF EMPTY CHAMBER AND 20" OF COVER [(319 SF + 40 SF) X .74 GPD/SF] DOWN 25" TO MEDIUM SAND. REQUIRED CAPACITY' 440 GPO - 7 TON PER SHORE Y) ON CENTER AND 32 FROM EDGE. CHAMBER- .25 SEPTIC TANK: 1500 GAL. PITCH AT 1/16"/FT CAP ENDS. 20° COVER= V X 5.25 X 9' X 0:055 TON/CU. FT. B070M LEACHING AREA: 608 SF 20" COVER=2.60 TON [16' x 36') TOTAL= 7.25 TON + 2AO TON = 9.65 TON A 5' REMOVAL IS CALLED FOR WEIGHT OF WATER --HIGH GROUNDWATER DOWN SIDE LEACHING AREA: 0 SF DOWN TO MEDIUM SANE),(GUS -3.11) x 5.25' x AD' X 0.0312 TON/CU. FT. NONE WEIGHT WATER= TON DESIGN CAPACITY: 449 DEC BUOYANCY CALCULATONS 500 GAL H-20 TANK AND 20' COVER ARE HEAVIER BY 6 TON.' [ECS SF) X GPD/SF] .74 WEIGHT OF EMPTY SEPTIC TANK AND 17" OF COVERTES n ARM n P P rv° PUMP CHAMBER STORAGE CAPACITY: 440 GAL. TANK= 10.61 TON (PER SHORE'd DOSES PER DAY: > 4 17" COVER=1.42' x 6.17' X 11' X 0.055 TONS/CLLFT. L ALARM TO BE WRED BY ELECTRIGAN ON 17" COVER=5.30 TON SEPARATE ORGUT ROM PUMP. TOTAL= 10.61 TON + 5.30 TON = 15.9 TUN 2- ELECTRICAL WORK TG BE INSPECTED BY WEIGHT OF WATER --HIGH GROUNDWATER DOWN WIRING INSPECTOR (5.7 -3.40 X 6.17' x 11' X 0.0312 TON/CU. FT. 1 ALARM TO BE LWATED IN HOUSE. WEIGHT WATER= 4.74 TON 4. PUMP TO BE CAPABLE DP PISSING THIS PLAN IS A VALID COPY ONLY IF IT FEARS 1- /4- SCUDS AND INSTALLED IN snelm AN ORIGINAL RED STAMP AND SIGNATURE. TANK AND 17' COVER ARE HEAVIER BY it TON. CONFORMANCE Yom MANUFACTURER'S SPECIFICATIONS. 5. USE MEYER MW50, 1/4 XP PUMP OR TTX OF IN �` I A" ... HEALTH AGENT APPROVAL DATE SITE PLAN FOR BEACHWOOD CONDOMINIUMS 638 ROUTE 28, WEST YARMOUTH, MA SEPTEMBER 4, 1998 SCALE: 1"=20' RONALD J. CADILLAC, PLS, RS PROFESSIONAL LAND SURVEYOR & REGISTERED SANITARIAN P.O. BOX 258 `ASST YARMOUTH, MA 02673 (508) 775-9700 PAGE 2 OF 3 Sill A 10.4 Sill B +015 A O *R SYSTEM J O I L.IVI S"ENTERING ARE ALTO TOP LINES CHAMBER LOCK AND SO THEYGROUTS KNOCKOUT. TOP BlOeK GRADE WILL RISE OVER LEACH AREA. THIS PROVIDES 220 GAL STORAGE ABOVE ALARM. Invert A 100 AM REPLUMB UNITS B I"v:rt B els ROUND ** I^vert 10.1 Proposed AND 5 AS NEEDED. p invert PUMP CHAMBER Proposed SHOREY--H-20 Invert 9.94 2 FLOWDIFFUSORS a Bodies Uee Goo Proposed - /1L WATER MAI HT MAKE min, TII. RULFAC3/eY U DU DRILL ]/e' NEEP/VENT HP£ 5=1/4"/fl +0'4 S=1/8/ft. 1000 Gal. TOP PEA STONE - L1ne provide B" cover P Invert ] ]c KE F C MAKE FACTORY 2^ WATER ncnT Invert 7.44 CHECK VALVE - - - - - Propo:.e ALARM Ie" 0,96' - 129. ON +* Bottom Use 3'8B- 6" Stone under OFF I1 9.86 B.9 Bottom.. 94 z. 4C' Proposed Bottom A-58" II 4" B� �5'� B'—� 0.2 B ofIV An Atljurtment 8" STONE UNDER UNDER Using MASH2J-June 98 DESIGN DATA LEACH AREA =one B OBSERVED WATER -a.) USE 2 FLOWDIFFUSORS, AS SHOWN 3EDROOMS:(UNIT5 5 nd e) 2 WITH 4' STONE ON ENDS AND 3' OF DygNcr CALCS-H-TED PUMP CHAMBER GARBAGE GRINDER: W. STONE ON SIDES, FOR A 10' WIDE WEIGHT OF EMPTY CHAMBER AND 23" OF COVER Out REQUIRED CAPACITY: - 22V GPD LEACH AREA, AS SHOWN. CHAMBER= 3.04 TON (PER SHOREY) SEPTIC TANK: 1"40 GAL. 23" COVER= 1.92' X 4- X 114 x 0.055 TON/CU. FT. A2 OF A 5' REMOVAL IS CALLED FOR 23" COVER -1,32 TON BOTTOM LEACHING AREA: DOWN 3'3 TO MEDIUM SAND. TOTAL- 3.04 TON + 1.32 TON = 4.36 TON [10' x (+o.z5'+ w )/2] + 5' REMOVAL MAY BE REDUCED WEIGHT OF WATER --HIGH GROUNDWATER DOWN li 16 z 710' x (11,25'+ )/ ] TO 2' TO AVOID GAS OR ELECT. (5.7 -2.94) x 4' X 3.14' X 0.0312 TON/CU. FT. SIDE LEACHING AREA: ) OF WEIGHT WATER- 1.08 TON [16 + 16 + 10.25 + 19.251 X .96 BUOYANCY ImLCULATI0N3 3920 f.A1 H-10 TANK AND 23' COVER ARE HEAVIER BY 3.2 TON. DESIGN CAPACITY: 1C GPD WEIGHT OF EMPTY SEPTIC TANK AND 18" OF COVER • •°u n oHUP NOTED [(262 SF + 50 SF)] X .74 GPD/SN] TANK- 4.12 TON (PER SNOBBY) PUMP CHAMBER STORAGE CAPACITY: 221 GAL, 18" COVER=1.5' X 4.83' X AS' X OD55 TONS/CUST 1, ALARM TO BE WOOD BY ELECTRICIAN M 13Y COVER -3,38 TON SEPARATE CIRCIUT FROM PUMP. DOSES PER DAY: A 5 TOTAL- 412 TON + 3.38 TON - 7.5 TON 2. CHEMICAL WORK TO VE INSPECTEU By WEIGHT OF WATER --HIGH GROUNDWATER DOWN WRING INSPECTOR. (5J -3.29) X 4.83' X 8.5' X 0.0312 TON/CU. FT 3' ALARM TO RE LOCATED IN HOOL WEIGHT WATER- 3.09 TON a. PUMP TO BE CAPABLE Of PASSING 1-1/4 SWus AND I+bTAUEO IN STRICT TANK AND 18" COVER ARE HEAVIER BY 4.4 TON, CONFORMANCE MIH MANUFAC UBGS SPECIFICATIONS. 5. U4£ MEYER MABO. +/2 HP PUMP, OR - ANY WATER LINES WITFIN FIR OF PROPOSED LEACHING 10 THIS PLAN IS A VALID COPY ONLY IF IT EARS AN ORIGINAL RED STAMP AND SIGNATJRE. OM• 4 �xoSlpq� ONA �n leo � 1 RON LIJ � JA AM o E� � o 4 HEALTH AGENT APPROVAL SITE PLAN FOR BEACHWOOD CONDOMINIUMS 638 ROUTE 28, WEST YARMOUTH, MA SEPTEMBER 4, 1998 SCALE: 1"=20' RONALD J. CADILLAC, PLS, RS PROFESSIONAL LAND SURVEYOR & REGISTERED SANITARIAN DATE P.O. BOX 258 WEST YARMOUTH, MA 02873 (508) 775-9700 PAGE 3 OF 3