HomeMy WebLinkAboutCOC request
April 22, 2021
Town of Yarmouth
Conservation Commission
1146 Route 28
South Yarmouth, MA 02664
Attn: Kelly Grant, Conservation Administrator
RE: Request for a Certificate of Compliance, 28 Bray Farm Road North,
Yarmouthport, Massachusetts; DEP File# SE83-1604
Dear Ms. Grant and Members of the Conservation Commission:
BSC Group, Inc. (BSC) is pleased to submit this Request for a Certificate of Compliance
(RCOC) on behalf of Craig Field (the Applicant) for the project authorized in the Order
of Conditions (DEP File #SE83-1604) for the property located at 28 Bray Farm Road
North, Yarmouthport, Massachusetts (the Site). The project consisted a pool with
associated fence and concrete patio, retaining wall, and work associated with the existing
driveway.
A site inspection was conducted by BSC on April 22, 2021 to assess the condition of
jurisdictional Resource Areas on Site and to confirm that the proposed work was
completed as within substantial compliance with the approved plans. All areas of work
including the pool, retaining wall, and driveway, apart from minor alterations to the
surface runoff control features, were determined to be completed within substantial
compliance of the Order of Conditions (OOC) issued on September 12, 2002. Alterations
associated with the proposed surface runoff/drainage features include the relocation of the
drywell (now catch basin) to the southwestern corner of the pool below the wall and
French drains/planting beds around the perimeter of the concrete pool patio (located
within the fence and raise pool patio area). These alterations serve as the betterment to the
proposed surface runoff drainage features through the expansion of areas to receive and
retain stormwater run-off and because the stormwater is now being directed in large part
away from the Bordering Vegetated Wetland (BVW) and its associated Buffer Zones.
BSC is now seeking the issuance of an RCOC, regarding the pool with associated fence
and concrete patio, retaining wall, and work associated with the existing driveway.
Enclosed please find the following information:
1. WPA Form 8A - Request for Certificate of Compliance Form
2. Copy of the Order of Conditions
3. Site Photographs
4. Original Stamped Plan approved under the OOC
Yarmouth Conservation Commission
April 22, 2021
Page 2
Please review this Request for a Certificate of Compliance documenting compliance with
the Order of Conditions and inform us if you have any questions or require additional
information at (508) 778 - 8919.
Regards,
BSC GROUP, INC.
Hannah Raddatz
Wetland Scientist
wpaform8a.doc •• rev. 5/29/14 Page 1 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A – Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By-law, Chapter 143
DEP File Number:
83-1604
Provided by DEP
A. Project Information
Important:
When filling out
forms on the
computer, use
only the tab
key to move
your cursor -
do not use the
return key.
1. This request is being made by:
Craig Field
Name
28 Bray Farm Road North
Mailing Address
Yarmouthport
City/Town
MA
State
02675
Zip Code
Phone Number
2. This request is in reference to work regulated by a final Order of Conditions issued to:
Craig A and Laura A Field
Applicant
9/12/2002
Dated
SE83-1604
DEP File Number
Upon completion
of the work
authorized in
an Order of
Conditions, the
property owner
must request a
Certificate of
Compliance
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed.
3. The project site is located at:
28 Bray Farm Road North
Street Address
Yarmouthport
City/Town
151
Assessors Map/Plat Number
34
Parcel/Lot Number
4. The final Order of Conditions was recorded at the Registry of Deeds for:
Property Owner (if different)
Barnstable
County
Book
Page
156277
Certificate (if registered land)
5. This request is for certification that (check one):
the work regulated by the above-referenced Order of Conditions has been satisfactorily completed.
the following portions of the work regulated by the above-referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaform8a.doc •• rev. 5/29/14 Page 2 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A – Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By-law, Chapter 143
DEP File Number:
83-1604
Provided by DEP
A. Project Information (cont.)
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office-
for-your-city-or-town.html).
Photo 1: View of pool with French drain/planting areas around the perimeter of the
concrete pool pad. Looking southeast.
Photo 2:View of pool with French drain/planting areas around the perimeter of the
concrete pool pad.Looking northwest.
Site Photographs
April 22, 2021
28 Bray Farm Road North
Yarmouth Port, MA
Page 1