Loading...
HomeMy WebLinkAboutCorrespondence 6.15.2021 Grant, Kelly From:Mark Burgess <shorefrontconsulting@gmail.com> Sent:Tuesday, June 15, 2021 8:14 PM To:Grant, Kelly Subject:Re: 36 Mayflower Terrace - silt sock is in, grass has been planted Attachments:IMG_3096.jpg; IMG_3097.jpg; IMG_3098.jpg Attention! This email originates outside of the organization. Do not open attachments or click links unless you are sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure. Otherwise delete this email. Hi Kelly: I just went by there tonight. All is good for now; we just wait and see how the grass comes in. He just seeded the entire thing. I'll get a plan to you as time permits. Thanks for your help. Mark Burgess Shorefront Consulting B.S. Ocean Engineering "If You Want A Dock, We Have To Talk" "Engineers get to work when they say it can’t be done….." 290 Center Street, Dennis Port, MA 02639 Phone: 508-280-8046 Email: shorefrontconsulting@gmail.com Web: www.shorefrontconsulting.com Facebook: Shorefront Consulting I build my business on referrals. If you know anyone who can benefit from my services, please let me know. On 6/15/2021 12:04 PM, Mark Burgess wrote: Thanks, Kelly. I will have to swing over there to see what progress has been made, and I'll report back. I'll also revise the plan after I talk with Dan Ojala, and we'll get that to you as well. Mark Burgess Shorefront Consulting B.S. Ocean Engineering 1 "If You Want A Dock, We Have To Talk" "Engineers get to work when they say it can’t be done….." 290 Center Street, Dennis Port, MA 02639 Phone: 508-280-8046 Email: shorefrontconsulting@gmail.com Web: www.shorefrontconsulting.com Facebook: Shorefront Consulting I build my business on referrals. If you know anyone who can benefit from my services, please let me know. On 6/15/2021 8:54 AM, Grant, Kelly wrote: Hi Mark I have a couple of meetings this morning but wanted to get back to you on 36 Mayflower Terrace. You can provide an updated plan that corrects the ground elevations and include a cover letter that details the plan to reduce the dock height accordingly. As long as it shows the same clearance over the marsh we will be OK. With the vegetation cutting, has there been action to stabilize the top of bank area? I assume much of the cut vegetation will grow back in pretty quickly but the ground disturbance needs to be addressed. There is requirement for a monitoring report for the vegetation management and rain garden in the fall so this should be addressed in that report. Thanks Kelly Grant Conservation Administrator Town of Yarmouth 508-398-2231 Ext 1288 kgrant@yarmouth.ma.us 2