HomeMy WebLinkAbout2021-5-10_DYIMS_Traverse_Field_ReportTraverse Landscape Architects
150 Chestnut Street 4th Floor
Providence RI, 02903
Landscape Architects Field Observation Report
DYIMS
296 Station Avenue
South Yarmouth, MA 02664 (US)
Report number: K1008-3
Date: May 10, 2021 04:13 PM
Attendees and Distribution
Role and company name Name Contact information Present
Principal LA
[Traverse]
Kris Bradner 401-585-4316
kbradner@traversela.com
✔
Discussions on Site
Observations
Observation Description
General
✔ Misc 3.1 These two trees were left after the clearing and grubbing. Traverse recommends these two trees also be removed if within
the property limits. This recommendation is due to the fact that the Pine left alone could be a wind hazard. The other smaller
deciduous tree is growing into the power lines and has already been cut back or topped.
May 10, 2021 04:36 PM
✔ Misc 3.2 Oak Tree along the right of way along Haywood neighbors property will be looked at once an as-built survey of the actual tree
location is shown along with the proposed underground utilities to determine if it is worth saving the tree.
May 10, 2021 04:40 PM
Contractor shall refer to the photos and observations above.
Contractor shall comply with all requirements instructed by the Landscape Architect on all previous field reports until such requirements are fulfilled. The
Landscape Architect shall not be responsible for any items not addressed in previous field reports which may result in cost or damage. All work shall comply
with that which is shown in the Contract Documents.
General conditions
Report created by Kris Bradner
1 / 2
150 Chestnut Street, 4th Floor • Providence, RI 02903 • 401.383.4950 • www.traversela.com
Site visits performed by the Landscape Architect under this contract have been conducted under the limited conditions as described by site observations in the
General Conditions of the Contract for Construction, as referenced in the Owner-Architect Agreement.
Information contained in this Field Observation Report by Traverse Landscape Architects has been prepared to the best of our knowledge according to
observable conditions at the site. This information will be approved record unless written notice to the contrary is received within seven (7) calendar days of the
issue date of this document. Written corrections shall be reported to observer at Traverse Landscape Architects. Oral rebuttals will not be accepted.
Report created by Kris Bradner
2 / 2
150 Chestnut Street, 4th Floor • Providence, RI 02903 • 401.383.4950 • www.traversela.com