Loading...
HomeMy WebLinkAbout2021-5-3_DYIMS_Traverse_Field_ReportTraverse Landscape Architects 150 Chestnut Street 4th Floor Providence RI, 02903 Landscape Architects Field Observation Report DYIMS 296 Station Avenue South Yarmouth, MA 02664 (US) Report number: K1008-2 Date: May 04, 2021 08:58 AM Attendees and Distribution Role and company name Name Contact information Present Associate [PMA Consultants ] Mitch Miller 781-794-1404 ext. 1842 mmiller@pmaconsultants.com ✔ Superintendent [Commodore Builders ] Ryan Dirico 617-614-3500 rdirico@commodorebuilders.com ✔ Assistant Facilities Manager [DY Regional School District ] Steve Faucher (508) 398-7670 fauchers@dy-regional.k12.ma.us ✔ Discussions on Site Observations Observation Description General Report created by John Luca 1 / 5 150 Chestnut Street, 4th Floor • Providence, RI 02903 • 401.383.4950 • www.traversela.com ✔ General Tree clearing 2.1 May 03, 2021 A site walk took place on April 3rd 2021 to review tree clearing as requested by the contractor. John Luca of Traverse walked the site with Ryan Dirico of Commodore, Mitch Miller of PMA, and Steve Faucher of DY Regional District. Site clearing was completed per Civil demolition plans. Traverse and Commodore confirmed that construction fencing will be installed after clearing is completed. Multiple questions/comments arose during the site walk and will be issued as RFI's by the contractor. Topics and observations are as follows: 1. Mr. Faucher recommended additional tree clearing of the north western property line adjacent to the High School JV baseball field and explained that the remaining trees in that area could be susceptible to wind exposure. The trees in question are outside of the contractual project site and will need additional approval. (Photos 1-2) 2. A single mature Oak tree remains adjacent to an abutter off of Haywood Ave. Mr. Dirico of Commodore will request additional as-built information on the trees location in relation to the property line. Traverse recommended that the tree and root system be properly protected/trimming during construction per specification 015639 Tree Protection and Trimming. All parties agreed. (Photos 3-4) 3. Proposed parking lot near the elementary school will be in the drip line of a young oak tree. Commodore has asked Traverse if the tree will survive post construction, or if its removal is necessary prior to construction. Traverse recommends that the proper steps are taken to improve the chances of the oak tree, refer to specification 015639 Tree Protection and Trimming. (Photo 5) 4. All trees between the admin building, and north towards the existing parking lot have been removed per the direction of Superintendent of Schools, Carol Woodbury. Mr. Dirico explained that stumps would be cleared opposite the parking lot from the Admin. building, but not directly adjacent to the building. Clearing around the Admin. building was outside of contract limits.(Photos 6-7) 5. Most of the tree line off Station Ave. adjacent to the proposed Station Ave athletic field have been cleared. Mr. Faucher inquired if additional proposed vegetation screening/fencing may be required. One mature Pine tree shall remain. (Photos 8- 9). 6. Mr.Dirico made known that the proposed sidewalk along Station Ave. may have to be adjusted per the existing surface utilities (Utility pole, man holes, ect.) Traverse to review. (Photo 10) 7. Mr.Dirico made known that a utility pole was not located accurately per the survey at the Station Ave. intersection near the Administration Building. Contractor to address with PMP. (Photo 11). 8. General clearing photos (Photos 12-14) May 04, 2021 09:51 AM 1. North West side property line trees 2. North West side Property line trees Report created by John Luca 2 / 5 150 Chestnut Street, 4th Floor • Providence, RI 02903 • 401.383.4950 • www.traversela.com 3. Tree at Haywood Ave. Residence 4. Tree at Haywood Ave. Residence 5. Tree near LOD 6. Tree clearing at Admin. Building 7. Tree clearing at Admin. Building 8. Station Ave. Report created by John Luca 3 / 5 150 Chestnut Street, 4th Floor • Providence, RI 02903 • 401.383.4950 • www.traversela.com 9. Station Ave. Pine to remain 10. Location of proposed walk on Station Ave. 11. Intersection 12. North Property line 13. Existing stormwater basin 14. View from southern property line looking north Contractor shall refer to the photos and observations above. Report created by John Luca 4 / 5 150 Chestnut Street, 4th Floor • Providence, RI 02903 • 401.383.4950 • www.traversela.com Contractor shall comply with all requirements instructed by the Landscape Architect on all previous field reports until such requirements are fulfilled. The Landscape Architect shall not be responsible for any items not addressed in previous field reports which may result in cost or damage. All work shall comply with that which is shown in the Contract Documents. General conditions Site visits performed by the Landscape Architect under this contract have been conducted under the limited conditions as described by site observations in the General Conditions of the Contract for Construction, as referenced in the Owner-Architect Agreement. Information contained in this Field Observation Report by Traverse Landscape Architects has been prepared to the best of our knowledge according to observable conditions at the site. This information will be approved record unless written notice to the contrary is received within seven (7) calendar days of the issue date of this document. Written corrections shall be reported to observer at Traverse Landscape Architects. Oral rebuttals will not be accepted. Report created by John Luca 5 / 5 150 Chestnut Street, 4th Floor • Providence, RI 02903 • 401.383.4950 • www.traversela.com