Loading...
HomeMy WebLinkAboutCover email revised plans 7.1.2021 Grant, Kelly From:Daniel A. Ojala, PE PLS <downcape@downcape.com> Sent:Thursday, July 1, 2021 1:35 PM To:Grant, Kelly Cc:Priscilla Leclerc; Ansley Druckenbrod Subject:SE83-2282 Felola #1 Malfa Road, West Attachments:96-150 Feola Site Plan revised 6-30-21.pdf; 96-150 FEOLA Berman Overlay 11x17 sketch 7-1-21.pdf Attention! This email originates outside of the organization. Do not open attachments or click links unless you are sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure. Otherwise delete this email. To Kelly Grant and Commission Members: Attached please find a revised plan responsive to the last meeting and the onsite meeting with the Coastal Process Specialist Greg Berman. The plan is dated revised 6-30-21, size 18”x24”, 9 sets. Also attached is an 11”x17” color overlay of the design onto Greg Bermans red line sketch with wall limit recommendation, indicating compliance with recommendation. Dated 7-1-21, nine copies. Changes to the original vertical wall plan dated 4-14-21 are as follows: 1. Shortened wall to East of garage and pulled back to the red line drawn by Greg Berman. 2. Updated the waterfront topography, MHW, and top of bank (steep scarp) with survey data from 6-29-21. 3. Indicated 1.5 horizontal to 1 vertical sloping rock wall is to be installed if/when erosion reaches the vertical wall per request of Berman. 4. Noted coir log work limit line at top of bank and sheet pile length of 16’, noted 3’ native planting strip on locus side of wall. I believe these changes cover all discussions to date, please do not hesitate to contact me with any questions. Daniel A. Ojala PE, PLS down cape engineering, inc. 939 Main St. Yarmouthport, MA 1-508-362-4541 x106 1-508-362-9880 fax downcape@downcape.com 1 2