Mop 54
Parcel 25
Perwrit valid for REPA R OF SEPTIC STEM
ONLY, di to Stale Id Local septic van ll
Board of Health review nd approsihl is required fol
may full additio /renovalionaalterations to
srrvage facilities and/or structures/d"elling.
Yarmouth Ieallh Department
AP ROVED
lFrt/1� G �
Name n Mme
w/ Lot 8
M 18,688± Sq. Ft.
Map 54 i
Parcel 27
S 58293Sry
F
/ 24
/
//r°ti° House #1
\ 3 Bedroom
\ TOF EL = 24.5
z5> \ I
/ Garage 24� 1
\ Slab = 23.3 c.0.
�wOta
X 24 \ � i6,
R
C/(pub�J: 2s�0
lic 2?
QC/
GRAPHIC SCALE \`
( IN FEET )
1 inch = 20 ft.
1.)
Assessor's Map
54 Parcel 26
2.)
Bk.
31005 Pg.
196
la pve
3.)
Plan
Book 264
Page 94
Me
4.)
This
property is
in the Zone II
Water Protection
District
s
t'-��/Hawes
5.)
This
property is
in Flood Zone X
al
Run Rd
Firm
Map 25001CO567J 7/16/14
jVjLTH
South Hawes Run Rd DEPT. WEST YARMOUTH, MA
691 SITE LOCUS
NOT TO SCALE
/ NOTE:
LOCATION OF UTILITIES IS APPROXIMATE AND ALL
UNDERGROUND AND OVERHEAD UTILITIES MUST BE
DETERMINED IN THE FIELD PRIOR TO COMMENCEMENT
OF ANY WORK, THIS INCLUDES, BUT NOT LIMITED TO,
REQUESTS TO DIGSAFE, ANY PRIVATE UTILITY COMPANIES
ADB Vent c AND THE LOCAL WATER DEPARTMENT,
O **
SAs�ay tK /
-)ST * ** *� Note #19 ,,q/
/
\j .* . , a
l * f Ci
� / 1
9 /
See
°leo
Note #19 / ����
elegy \ O/�
of ot/
// ��
\ .mac,
/ Proposed
22 --- --- � � /
ryo may/ i Havvkz:ti Run
h / Prepared for:
( \ p / Top Basin
rpso Q /10TBM EL = 20.0 James Van Ness
L = 37.10' / 33 Mayflower Lane
80 / Rochester, MA
J R = ).c; n' ( /
7F
WORE
No. 393398
&P(
Site and Septic Plan
Road West Yarmouth, MA
Prepared by:
All Cape Septic and Survey
618 Route 28
West Yarmouth, MA 02673
(508) 771-4200
allcopeseptic@gmail.com
—]April 22, 2021 Sheet 1 of 2 By: MA Check: SM Dwg. #334
CONSTRUCTION NOTES
1.) ALL WORK SHALL CONFORM TO THE STATE ENVIRONMENTAL CODE, TITLE 5 (310 CMR 15.000):
STANDARD REQUIREMENTS FOR THE SITING, CONSTRUCTION, INSPECTION, UPGRADE, AND
EXPANSION OF ON-SITE SEWAGE TREATMENT AND DISPOSAL SYSTEMS AND FOR THE TRANSPORT
AND DISPOSAL OF SEPTAGE, AND THE LOCAL BOARD OF HEALTH REGULATIONS
2.) ANY SEPTIC SYSTEM COMPONENT INSTALLED IN A LOCATION WHERE THERE IS POTENTIAL FOR
VEHICLES OR HEAVY EQUIPMENT TO PASSOVERIT SHALL BE DESIGNED TO WITHSTAND AN H-20
LOADING. IF UNDER AN IMPERVIOUS SURFACE; SYSTEM SHALL BE VENTED TO THE ATMOSPHERE.
EL=24.5± Clem
[-1 Out
3.) TO MINIMIZE UNEVEN SETTLING, SEPTIC TANKS AND D -BOX SHALL BE INSTALLED ON A STABLE
MECHANICALLY -COMPACTED -BASE ON SIX INCHES OF CRUSHED STONE.
21.5±
4.) COVERS OVER THE INLET AND OUTLET TEES OF THE SEPTIC TANK, THE DISTRIBUTION BOX, AND Existing
THE SOIL ABSORPTION SYSTEM SHALL BE RAISED TO WITHIN 6" OF FINAL GRADE. LEACHING
FIELDS. TRENCHES. AND OTHER SOIL ABSORPTION SYSTEMS NTTHOUT ACCESS MANHOLES SHALL
HAVE AT LEAST ONE (1) INSPECTION PORT CONSISTING OF PERFORATED 4" PVC PIPE PLACED
VERTICALLY TO THE BOTTOM OF THE SOIL ABSORPTION SYSTEM WITH A CAP, TIED WITH MAGNETIC
MARKING TAPE, ACCESSIBLE TO WITHIN 3" OF FINAL GRADE.
5.) PIPING SHALL CONSIST OF 4' SCHEDULE 40 PVC OR EQUIVALENT. PIPE SHALL BE WD ON A
MINIMUM CONTINUOUS GRADE OF NOT LESS THAN 2% FROM THE BUILDING TO THE SEPTIC TANK,
AND NOT LESS THAN 1% OTHERWISE.
6.) DISTRIBUTION LINES FOR THE SOIL ABSORPTION SYSTEM SHALL BE 4" DIAMETER SCHEDULE 40
PVC (OREQUIVALENT)WD AT 0.005 FT/FT. UNLESS OTHERWISE NOTED. LINES SHALL BE CAPPED
AT END OR AS NOTED.
7.) LINES FROM THE DISTRIBUTION BOX TO BE LEVEL FOR THE FIRST TWO (2) FEET BEFORE
PITCHING TO THE SOIL ABSORPTION SYSTEM, DISTRIBUTION BOX SHALL BE WATER TESTED TO
ASSURE EVEN DISTRIBUTION.
8.) GROUT TO BE USED AT ALL POINTS WHERE PIPES ENTER OR LEAVE ALL CONCRETE STRUCTURES
IN ORDER TO PROVIDE A WATERTIGHT SEAL
9.) HEAVY EQUIPMENT SHALL NOT BEALLOWEDTO OPERATE OVER THE LIMITS OF THE SEWAGE
DISPOSAL FIELD DURING THE COURSE OF CONSTRUCTION OF THE SYSTEM.
10.) IN ACCORDANCE WITH 310 CMR 1&221, ALL SYSTEM COMPONENTS SHALL BE MARKED WITH
MAGNETIC MARKING TAPE.
11.) THERE ARE NO KNOWN WELLS OR WETLANDS WITHIN 150' OF THE PROPOSED SOIL ABSORPTION SYSTEM.
12.) FROM THE DATE OF THE INSTALLATION OF THE SOIL ABSORPTION SYSTEM UNTIL RECEIPT OF
THE CERTIFICATE OF COMPLIANCE, THE PERIMETER SHALL BE STAKED AND FLAGGED TO PREVENT
USE OF THE AREA THAT MAY CAUSE DAMAGE TO THE SYSTEM.
13.) THE DESIGNER WILL NOT BE RESPONSIBLE FOR THE SYSTEM AS DESIGNED UNLESS
CONSTRUCTED AS SHOWN ON PLAN. ANY CHANCES SHALL BE APPROVED IN WRITING BY THE ENGINEER.
14.) THE BOARD OF HEALTH REQUIRES INSPECTION OF ALL CONSTRUCTION BY AN AGENT OF THE
BOARD OF HEALTH AND THE DESIGNER. THE DESIGNER SHALL CERTIFY IN WRITING THAT THE
SEWAGE DISPOSAL SYSTEM WAS INSTALLED IN ACCORDANCE WITH THE TERMS OF THE PERMIT
AND THE APPROVED PLANS 48 HOURS ADVANCE NOTICE IS REQUESTED,
1S) LOCATION OF UTIUTIES IS APPROXIMATE AND CONTRACTOR SHALL BE RESPONSIBLE FOR
DETERMINING THE LOCATION OF ALL UNDERGROUND AND OVERHEAD UTILITIES PRIOR TO
COMMENCEMENT OF ANY WORK. THIS INCLUDES, BUT IS NOT LIMITED TO, REQUESTS TO DIGSAFE,
ANY PRIVATE UTILITY COMPANIES, AND THE LOCAL WATER DEPARTMENT.
16.) CONTRACTOR SHALL VERIFY THAT ALL WASTEUNES ARE CONNECTED BY WATER TESTING
WITHIN THE DWELUNG PRIOR TO INSTALLATION OF ANY SEPTIC COMPONENTS.
17.) CONTRACTOR SHALL VERIFY EXISTING INVERT ELEVATIONS PRIOR TO INSTALLATION OF ANY
SEPTIC SYSTEM COMPONENTS
18.) TEST HOLES COMPLETED PER STATE ENVIRONMENTAL CODE, TITLE 5. SOILS CAN BE
VARIABLE AND TEST HOLE DATA IS NO GUARANTEE OF SOIL CONDITIONS IN OTHER AREAS. IF
SOILS DIFFER FROM THOSE SHOWN M THE SOILS LOGS, DESIGN ENGINEER IS TO INSPECT THE
SOILS PRIOR TO PROCEEDING WITH INSTALLATION OF ANY SEPTIC COMPONENTS.
19.) EXISTING SEPTIC COMPONENTS TO BE LOCATED, PUMPED DRY. FILLED WITH CLEAN SAND AND
ABANDONED IN PLACE OR REMOVED AS REQUIRED. AREA TO BE COMPACTED TO MINIMIZE SETTLING.
(INCLUDING EXISTING SEPTIC TANK)
" 25'1
101
EL =
MIN: 20"
21-8 M GEOTEXTILE
20.3 FABRIC
� 20.4 J
o ( 20.2 20.0 3/4" to
1-i//2' STONK
GAS BAFFLE DB -3 H-20 (Double wash)
D -BOX TWO (2) 500 GALLON PRECAST
17.8 CONCRETE LEACH CHAMBERS WITH 4' OF
PROPOSED STONE ON ENDS AND 4" ON SIDES
1,500 GALLON 8't. -12'±-A
'
SEPTIC TANK LEACH CHAMBERS 5.1
END VIE
FLOW PROFILE
NOT TO SCALE EL=12.7 Bottom Test Hale
Test.Hole 1 (EL_22.7±) TEST HOLE LOG
Depth
Elev.
Layer
Soil Close
Soil Color
0"-4"
22.4
A
Sandy Loam
t0YR3/1
4"-21'
21.0
B
Loamy Sand
10YR4/4
21"-120'
127
C
Med-Coorse
1OYR5/3
Sana
DATE OF TESTING: 04/08/21
SOIL EVALUATOR: MARK POLSELLI
WITNESS: MALLORY LANGLER YARMOUTH HEALTH AGENT
PERCOLATION RATE HOLE #1: LESS THAN < 2 MIN/INCH
NO GROUNDWATER ENCOUNTERED
NO MOTTLING ENCOUNTERED
YSTEM DESIGN CALCULATIONS
SEWAGE DESIGN FLOW: THREE BEDROOM DWELLING 0 110 GPD/BEDROOM = 330 GPD
(MINIMUM DESIGN REQUIRED 330 GPD)
SEWAGE DESIGN FLOW PROVIDED: TWO (2) 500 GALLON CHAMBERS
WITH 4' STONE ON THE ENDS AND 4' STONE ON THE SIDES
Vt - ((25.0 x 12.83) + 2(25.0 + 12.83) (2) x .74 - 349 GPD PROVIDED
349 GPD PROVIDED > 330 GPD REWIRED
SEPTIC TANK CAPACITY REWIRED: 330 GPD X 200 = 660 (MINIMUM)
SEPTIC TANK CAPACITY PROVIDED: 1,500 GALLON SEPTIC TANK
A GARBAGE DISPOSAL IS NOT PERMITTED WITH THIS DESIGN FLOW
Proposed Site and Septic Plan
1 Hawes Run Road
West Yarmouth, MA
Prepared for:
James Van Ness
33 Mayflower Lane
Rochester, MA
Prepared by.
All Cape Septic and Survey
618 Route 28
West Yarmouth, MA 02673
(508) 771-4200
alicapesepticOgm ail, com
Date: 04/22/20 Sheet 2 of 2
Project No. AC -3341