Loading...
HomeMy WebLinkAbout00-4322-Unit-Prices-Form_Rev_3Dennis Yarmouth Intermediate Middle School Dennis Yarmouth Regional School District Perkins Eastman DPC, Project No. 71011 January 19, 2021 100% Construction Document Addendum #4, February 22, 2021 Addendum #5, February 23, 2021 UNIT PRICES FORM 00 4322 - 1 1.1 DOCUMENT 00 4322 UNIT PRICES FORM BID INFORMATION A. Bidder: . B. Project Name: Dennis-Yarmouth Intermediate Middle School. C. Project Location: 286 Station Avenue, South Yarmouth, MA. D. Owner: Dennis-Yarmouth Regional School District; 296 Station Avenue, South Yarmouth, MA. E. Architect: Perkins Eastman, Inc., 20 Ashburton Place, Floor 8, Boston, MA 02108. F. Architect Project Number: 71011. 1.2 BID FORM SUPPLEMENT A. This form is required to be attached to the Bid Form. B. The undersigned Bidder proposes the amounts below be added to or deducted from the Contract Sum on performance and measurement of the individual items of Work. C. If the unit price does not affect the Work of this Contract, the Bidder shall indicate "NOT APPLICABLE." 1.3 UNIT PRICES A. Unit-Price No. 1: Rock excavation and replacement with satisfactory soil material. 1. A: Dollars ($ ) per cu. yd. 200 CY for a total cost of ($ ) B. Unit-Price No. 2: Removal of unsatisfactory soil and replacement with satisfactory soil material. 1. Dollars ($ ) per cu. yd. 5,000 CY for a total cost of ($ ) Dennis Yarmouth Intermediate Middle School Dennis Yarmouth Regional School District Perkins Eastman DPC, Project No. 71011 January 19, 2021 100% Construction Document Addendum #4, February 22, 2021 Addendum #5, February 23, 2021 UNIT PRICES FORM 00 4322 - 2 C. Unit-Price No. 3: Moisture vapor emission control without cementitious underlayment. 1. Dollars ($ ) per sq. ft. 20,000 SF for a total cost of ($ ) D. Unit-Price No. 4: Moisture vapor emission control including cementitious underlayment. 1. Dollars ($ ) per sq. ft. 10,000 SF for a total cost of ($ ) 1.4 SUBMISSION OF BID SUPPLEMENT A. Respectfully submitted this day of , 2021. B. Submitted By: (Insert name of bidding firm or corporation). C. Authorized Signature: (Handwritten signature). D. Signed By: (Type or print name). E. Title: (Owner/Partner/President/Vice President). END OF DOCUMENT Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 UNIT PRICES FORM 00 4322 - 1 DOCUMENT 00 4322 UNIT PRICES FORM 1.1 BID INFORMATION A. Bidder: ____________________________________________________. B. Project Name: Dennis-Yarmouth Intermediate / Middle School. C. Project Location: 286 Station Avenue, South Yarmouth, MA. D. Owner: Dennis-Yarmouth Regional School District; 296 Station Avenue, South Yarmouth, MA. E. Architect: Perkins Eastman, Inc., 20 Ashburton Place, Floor 8, Boston, MA 02108. F. Architect Project Number: 71011. 1.2 BID FORM SUPPLEMENT A. This form is required to be attached to the Bid Form. B. The undersigned Bidder proposes the amounts below be added to or deducted from the Contract Sum on performance and measurement of the individual items of Work. C. If the unit price does not affect the Work of this Contract, the Bidder shall indicate "NOT APPLICABLE." 1.3 UNIT PRICES A. Unit-Price No. 1: Rock excavation and replacement with satisfactory soil material. 1. ADD (to Quantity Allowance): ________________________________________ Dollars ($_____________) per cu. yd. 200 CY for a total cost of ($_______________________) 2. SUBTRACT (from Quantity Allowance): _________________________________ Dollars ($_____________) per cu. yd. 200 CY for a total cost of ($_______________________) B. Unit-Price No. 2: Removal of unsatisfactory soil and replacement with satisfactory soil material. 1. ADD (to Quantity Allowance): ________________________________________ Dollars ($_____________) per cu. yd. 5,000 CY for a total cost of ($______________________) 2. SUBTRACT (from Quantity Allowance): _________________________________ Dollars ($_____________) per cu. yd. 5,000 CY for a total cost of ($______________________) Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 UNIT PRICES FORM 00 4322 - 2 C. Unit-Price No. 3: Moisture vapor emission control without cementitious underlayment. 1. _______________________________________ Dollars ($_____________) per sq. ft. 10,000 SF for a total cost of ($________________________) D. Unit-Price No. 4: Moisture vapor emission control including cementitious underlayment. 1. _______________________________________ Dollars ($_____________) per sq. ft. 10,000 SF for a total cost of ($________________________) 1.4 SUBMISSION OF BID SUPPLEMENT A. Respectfully submitted this ____ day of ____________, 2021. B. Submitted By:___________________________________(Insert name of bidding firm or corporation). C. Authorized Signature:___________________________________(Handwritten signature). D. Signed By:______________________________________________(Type or print name). E. Title:___________________________________(Owner/Partner/President/Vice President). END OF DOCUMENT