HomeMy WebLinkAbout00-4322-Unit-Prices-Form_Rev_3Dennis Yarmouth Intermediate Middle School
Dennis Yarmouth Regional School District
Perkins Eastman DPC, Project No. 71011
January 19, 2021
100% Construction Document
Addendum #4, February 22, 2021
Addendum #5, February 23, 2021
UNIT PRICES FORM
00 4322 - 1
1.1
DOCUMENT 00 4322
UNIT PRICES FORM
BID INFORMATION
A. Bidder: .
B. Project Name: Dennis-Yarmouth Intermediate Middle School.
C. Project Location: 286 Station Avenue, South Yarmouth, MA.
D. Owner: Dennis-Yarmouth Regional School District; 296 Station Avenue, South Yarmouth, MA.
E. Architect: Perkins Eastman, Inc., 20 Ashburton Place, Floor 8, Boston, MA 02108.
F. Architect Project Number: 71011.
1.2
BID FORM SUPPLEMENT
A. This form is required to be attached to the Bid Form.
B. The undersigned Bidder proposes the amounts below be added to or deducted from the
Contract Sum on performance and measurement of the individual items of Work.
C. If the unit price does not affect the Work of this Contract, the Bidder shall indicate "NOT
APPLICABLE."
1.3
UNIT PRICES
A. Unit-Price No. 1: Rock excavation and replacement with satisfactory soil material.
1. A: Dollars
($ ) per cu. yd. 200 CY for a total cost of ($ )
B. Unit-Price No. 2: Removal of unsatisfactory soil and replacement with satisfactory soil material.
1. Dollars
($ ) per cu. yd. 5,000 CY for a total cost of ($ )
Dennis Yarmouth Intermediate Middle School
Dennis Yarmouth Regional School District
Perkins Eastman DPC, Project No. 71011
January 19, 2021
100% Construction Document
Addendum #4, February 22, 2021
Addendum #5, February 23, 2021
UNIT PRICES FORM
00 4322 - 2
C. Unit-Price No. 3: Moisture vapor emission control without cementitious underlayment.
1. Dollars ($ ) per sq. ft.
20,000 SF for a total cost of ($ )
D. Unit-Price No. 4: Moisture vapor emission control including cementitious underlayment.
1. Dollars ($ ) per sq. ft.
10,000 SF for a total cost of ($ )
1.4 SUBMISSION OF BID SUPPLEMENT
A. Respectfully submitted this day of , 2021.
B. Submitted By: (Insert name of bidding firm or
corporation).
C. Authorized Signature: (Handwritten signature).
D. Signed By: (Type or print name).
E. Title: (Owner/Partner/President/Vice President).
END OF DOCUMENT
Dennis Yarmouth Intermediate Middle School January 19, 2021
Dennis Yarmouth Regional School District 100% Construction Documents
Perkins Eastman DPC, project #71011
UNIT PRICES FORM
00 4322 - 1
DOCUMENT 00 4322
UNIT PRICES FORM
1.1 BID INFORMATION
A. Bidder: ____________________________________________________.
B. Project Name: Dennis-Yarmouth Intermediate / Middle School.
C. Project Location: 286 Station Avenue, South Yarmouth, MA.
D. Owner: Dennis-Yarmouth Regional School District; 296 Station Avenue, South Yarmouth, MA.
E. Architect: Perkins Eastman, Inc., 20 Ashburton Place, Floor 8, Boston, MA 02108.
F. Architect Project Number: 71011.
1.2 BID FORM SUPPLEMENT
A. This form is required to be attached to the Bid Form.
B. The undersigned Bidder proposes the amounts below be added to or deducted from the
Contract Sum on performance and measurement of the individual items of Work.
C. If the unit price does not affect the Work of this Contract, the Bidder shall indicate "NOT
APPLICABLE."
1.3 UNIT PRICES
A. Unit-Price No. 1: Rock excavation and replacement with satisfactory soil material.
1. ADD (to Quantity Allowance): ________________________________________ Dollars
($_____________) per cu. yd. 200 CY for a total cost of ($_______________________)
2. SUBTRACT (from Quantity Allowance): _________________________________ Dollars
($_____________) per cu. yd. 200 CY for a total cost of ($_______________________)
B. Unit-Price No. 2: Removal of unsatisfactory soil and replacement with satisfactory soil material.
1. ADD (to Quantity Allowance): ________________________________________ Dollars
($_____________) per cu. yd. 5,000 CY for a total cost of ($______________________)
2. SUBTRACT (from Quantity Allowance): _________________________________ Dollars
($_____________) per cu. yd. 5,000 CY for a total cost of ($______________________)
Dennis Yarmouth Intermediate Middle School January 19, 2021
Dennis Yarmouth Regional School District 100% Construction Documents
Perkins Eastman DPC, project #71011
UNIT PRICES FORM
00 4322 - 2
C. Unit-Price No. 3: Moisture vapor emission control without cementitious underlayment.
1. _______________________________________ Dollars ($_____________) per sq. ft.
10,000 SF for a total cost of ($________________________)
D. Unit-Price No. 4: Moisture vapor emission control including cementitious underlayment.
1. _______________________________________ Dollars ($_____________) per sq. ft.
10,000 SF for a total cost of ($________________________)
1.4 SUBMISSION OF BID SUPPLEMENT
A. Respectfully submitted this ____ day of ____________, 2021.
B. Submitted By:___________________________________(Insert name of bidding firm or
corporation).
C. Authorized Signature:___________________________________(Handwritten signature).
D. Signed By:______________________________________________(Type or print name).
E. Title:___________________________________(Owner/Partner/President/Vice President).
END OF DOCUMENT