HomeMy WebLinkAbout01-3233-Photographic-Documentation_Rev_1Dennis Yarmouth Intermediate Middle School January 19, 2021
Dennis Yarmouth Regional School District 100% Construction Documents
Perkins Eastman DPC, project #71011
PHOTOGRAPHIC DOCUMENTATION
01 3233 - 1
SECTION 01 3233
PHOTOGRAPHIC DOCUMENTATION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements for the following:
1. Preconstruction photographs.
2. Periodic construction photographs.
3. Preconstruction video recordings.
4. Construction webcam.
B. Related Requirements:
1. Section 01 7700 "Closeout Procedures" for submitting photographic documentation as
Project Record Documents at Project closeout.
2. Section 01 7900 "Demonstration and Training" for submitting video recordings of
demonstration of equipment and training of Owner's personnel.
3. Section 02 4116 "Structure Demolition" for photographic documentation before building
demolition operations commence.
4. Section 31 1000 "Site Clearing" for photographic documentation before site clearing
operations commence.
1.3 INFORMATIONAL SUBMITTALS
A. Make Submittals in accordance with Section 01 3300 “Submittal Procedures.”
B. Key Plan: Submit key plan of Project site and building with notation of vantage points marked
for location and direction of each photograph and video recording. Indicate elevation or story of
construction. Include same information as corresponding photographic documentation.
C. Digital Photographs: Submit image files within three days of taking photographs.
1. Submit photos on CD-ROM or thumb-drive. Include copy of key plan indicating each
photograph's location and direction.
2. Identification: Provide the following information with each image description in file
metadata tag:
a. Name of Project.
b. Name and contact information for photographer.
c. Name of Architect.
d. Name of Contractor.
e. Date photograph was taken.
f. Description of location, vantage point, and direction.
g. Unique sequential identifier keyed to accompanying key plan.
Dennis Yarmouth Intermediate Middle School January 19, 2021
Dennis Yarmouth Regional School District 100% Construction Documents
Perkins Eastman DPC, project #71011
PHOTOGRAPHIC DOCUMENTATION
01 3233 - 2
D. Printed Photographs: Submit two sets of prints of each photographic view within seven days of
taking photographs.
1. Format: 8-by-10-inch smooth-surface matte prints on single-weight, paper; enclosed
back to back in clear plastic sleeves punched for three-ring binder. Include copy of key
plan indicating each photograph's location and direction. Provide one binder for each set
of prints.
2. Identification: On back of each print, label with the following information:
a. Name of Project.
b. Name and contact information for photographer.
c. Name of Architect.
d. Name of Contractor.
e. Date photograph was taken if not date stamped by camera.
f. Description of vantage point, indicating location, direction (by compass point), and
elevation or story of construction.
g. Unique sequential identifier keyed to accompanying key plan.
E. Video Recordings: Submit video recordings within seven days of recording.
1. Submit video recordings on CD-ROM or thumb drive. Include copy of key plan indicating
each video's location and direction.
2. Identification: With each submittal, provide the following information in file metadata tag:
a. Name of Project.
b. Name and address of photographer.
c. Name of Architect.
d. Name of Contractor.
e. Date video recording was recorded.
f. Description of vantage point, indicating location, direction (by compass point), and
elevation or story of construction.
3. Transcript: Prepared on 8-1/2-by-11-inch paper, punched and bound in three-ring
binders. Provide label on front and spine. Include a cover sheet with label information.
Include name of Project and date of video recording on each page.
1.4 QUALITY ASSURANCE
A. Photographer Qualifications: An individual who has been regularly engaged as a professional
photographer of construction projects for not less than three years.
B. Construction Webcam Service Provider: A firm specializing in providing photographic
equipment, web-based software, and related services for construction projects, with a record of
providing satisfactory services similar to those required for Project.
1.5 FORMATS AND MEDIA
A. Digital Photographs: Provide color images in JPG format, produced by a digital camera with
minimum sensor size of 12 megapixels, and at an image resolution of not less than 3200 by
2400 pixels, and with vibration-reduction technology. Use flash in low light levels or backlit
conditions.
B. Digital Video Recordings: Provide high-resolution, digital video in MPEG format, produced by a
digital camera with minimum sensor resolution of 12 megapixels and capable of recording in full
high-definition mode with vibration-reduction technology. Provide supplemental lighting in low
light levels or backlit conditions.
Dennis Yarmouth Intermediate Middle School January 19, 2021
Dennis Yarmouth Regional School District 100% Construction Documents
Perkins Eastman DPC, project #71011
PHOTOGRAPHIC DOCUMENTATION
01 3233 - 3
C. Digital Images: Submit digital media as originally recorded in the digital camera, without
alteration, manipulation, editing, or modifications using image-editing software.
D. Metadata: Record accurate date and time and GPS location data from camera.
E. File Names: Name media files with date and sequential numbering suffix.
1.6 CONSTRUCTION PHOTOGRAPHS
A. Photographer: Engage a qualified photographer to take construction photographs.
B. General: Take photographs with maximum depth of field and in focus.
1. Maintain key plan with each set of construction photographs that identifies each
photographic location.
C. Preconstruction Photographs: Before commencement of the Work, take photographs of Project
site and surrounding properties, including existing items to remain during construction, from
different vantage points, as directed by Architect.
1. Flag construction limits before taking construction photographs.
2. Take 20 photographs to show existing conditions adjacent to property before starting the
Work.
a. Show access to property abutters homes (list will be provided by Owner).
Photograph interiors and exteriors, provide file copy to abutting property owner and
obtain owner’s sign off of condition prior to the start of construction.
3. Take 20 photographs of existing buildings either on or adjoining property, to accurately
record physical conditions at start of construction.
4. Take additional photographs as required to record settlement or cracking of adjacent
structures, pavements, and improvements.
D. Periodic Construction Photographs: Take 50 photographs monthly, coinciding with the cutoff
date associated with each Application for Payment. Select vantage points to show status of
construction and progress since last photographs were taken.
1.7 CONSTRUCTION VIDEO RECORDINGS
A. Video Recording Photographer: Engage a qualified videographer to record construction video
recordings.
B. Narration: Describe scenes on video recording by audio narration by microphone while video
recording is recorded. Include description of items being viewed, recent events, and planned
activities. At each change in location, describe vantage point, location, direction (by compass
point), and elevation or story of construction.
1. Confirm date and time at beginning and end of recording.
2. Begin each video recording with name of Project, Contractor's name, videographer's
name, and Project location.
C. Preconstruction Video Recording: Before starting excavation and construction, record video
recording of Project site and surrounding properties from different vantage points, as directed by
Architect.
1. Flag excavation areas and construction limits before recording construction video
recordings.
2. Show existing conditions adjacent to Project site before starting the Work.
Dennis Yarmouth Intermediate Middle School January 19, 2021
Dennis Yarmouth Regional School District 100% Construction Documents
Perkins Eastman DPC, project #71011
PHOTOGRAPHIC DOCUMENTATION
01 3233 - 4
a. Show access to property abutters homes (list will be provided by Owner).
Photograph interiors and exteriors, provide file copy to abutting property owner and
obtain owner’s sign off of condition prior to the start of construction.
3. Show existing buildings either on or adjoining Project site to accurately record physical
conditions at the start of excavation and construction.
4. Show protection efforts by Contractor.
1.8 CONSTRUCTION WEBCAM
A. Webcam: Provide one fixed-location camera with weatherproof housing and two relocatable
solar powered, cellular enabled web cameras.
1. Provide construction monitoring and documentation services through a third party
construction web camera service provider (Multivista, OxBlue, Earthcam, or equal)
beginning the date of mobilization and concluding at the time of Substantial Completion.
2. Provide one trailer-mounted web camera (hard-wired power and data) complete with web
hosting, 24/7 live image stream, public URL for website viewing, minimum 1920x1080
resolution static images archived every 15 minutes during daylight hours with ability to
perform live and historical review and time lapse video.
3. Provide two solar powered, cellular enabled web cameras to be placed at remote
locations as directed by the Architect. Cameras are to be complete with web hosting,
public URL for website viewing, minimum 1920x1080 resolution static images archived
every 15 minutes during daylight hours with ability to perform historical review and time
lapse video.”
B. Web-Based Interface: Provide online interface to allow viewing of each high-definition digital
still image captured and stored during construction, from the Internet.
1. Access Control: Provide password-protected access for Project team administered by
Contractor, providing current image access and archival image access by date and time,
with images downloadable to viewer's device.
2. Software: Provide responsive software interface for use on computer, tablet, and mobile
screens with accompanying iPhone/iPad app and Android apps.
3. Storage: Maintain images on the website for reference during entire construction period,
and for not less than 30 days after Final Completion. Provide sufficient memory on
remote server to store all Project images.
4. Online Interface: Provide website interface with Project and client information and logos,
calendar-based navigation interface for selecting images, and pan and zoom capability
within high-definition images.
5. Forward and Reverse: Provide capability to browse through images, moving forward and
backward in time by individual image and by day.
6. Slideshow: Provide capability to automatically display current images from sites when
there are three or more cameras used.
7. Time-Lapse: Provide capability for online display of project time-lapse.
8. Dashboard: Provide capability to view thumbnails of all cameras on one screen.
9. Weather: Provide corresponding weather data for each image captured.
C. Maintain cameras and web-based access in good working order, according to web-based
construction photographic documentation service provider's written instructions until Final
Completion. Provide for service of cameras and related networking devices and software.
Dennis Yarmouth Intermediate Middle School January 19, 2021
Dennis Yarmouth Regional School District 100% Construction Documents
Perkins Eastman DPC, project #71011
PHOTOGRAPHIC DOCUMENTATION
01 3233 - 5
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION
(THIS PAGE IS BLANK)