HomeMy WebLinkAbout02-4113-Utility-Line-Removal_Rev_1Dennis Yarmouth Intermediate Middle School January 19, 2021
Dennis Yarmouth Regional School District 100% Construction Documents
Perkins Eastman DPC, project #71011
02 4113 Utility Line Removal
1 of 2
02 4113 Utility Line Removal
PART 1 - GENERAL
1.1 GENERAL PROVISIONS
A. Thework under this Section shall consist of existing underground drainage pipes and utility lines,
including associated items of work, as shown on the Plans and as specified herein
1.2 Related Work: The following items are not included in this Section and will be performed under the
designated Sections:
A. Section 31 0000 - EARTH MOVING
B. Provision of Waste Management: Section 01 7419, Construction Waste Management Plan.
C. Provision of general LEED requirements and forms: Section 01 8113 Sustainable Design
Requirements.
1.2 SUBMITTALS (Not Used)
1.3 QUALITY ASSURANCE
A. The Contractor shall perform Work in accordance with The Commonwealth of Massachusetts and
the Town of Yarmouth rules, regulations, laws and ordinances, and any other authorities having
jurisdiction.
1.4 PERMITS, CODES AND SAFETY REQUIREMENTS
A. Work shall conform to the Contract Drawings and Specifications and shall comply with applicable
codes and regulations. Present in writing to the Architect, all conflicts between the Contract
Drawings, Specifications, and applicable codes and regulations, for resolution before commencing
the Work.
B. Comply with all rules, regulations, laws and ordinances of the Town of Yarmouth and the
Commonwealth of Massachusetts, and of all other authorities having jurisdiction. All labor,
materials, equipment and services necessary to make the work comply with such requirements,
shall be provided without additional cost to the Owner.
C. The Contractor shall not close any street, sidewalk or passageway except as indicated on the
Contract Drawings. The Contractor shall so conduct his operations as to interfere as little as
possible with the use ordinarily made of roads, driveways, sidewalks or other facilities near enough
to the work to be affected thereby.
Dennis Yarmouth Intermediate Middle School January 19, 2021
Dennis Yarmouth Regional School District 100% Construction Documents
Perkins Eastman DPC, project #71011
02 4113 Utility Line Removal
2 of 2
D. The Contractor shall procure and pay for all permits and licenses required for the complete work
specified herein and shown on the Contract Drawings at no additional cost to the Owner. Arrange
and pay for legal off-site disposal of all excess excavated materials, obtain proper disposal receipts
from the applicable disposal facility for verification.
E. Notify "Dig Safe" and the Owner before starting work; comply fully with utility company
requirements.
PART 2 – PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 DEMOLITION
A. The known existing drainage and utility pipelines are shown on the drawings in their approximate
locations. Drainage and utility pipelines include but are not limited to reinforced concrete pipe
(RCP), PVC, HDPE, ductile iron, cast iron, CMP, clay, etc.
B. Locate drainage pipes and utility lines to be removed.
C. Field verify, if required, the depth of the drainage pipes and utility lines to be removed.
D. Any active pipeline lines encountered by the Contractor during the construction activities shall be
isolated by a method approved by the Engineer.
E. Excavate and remove the drainage pipes and utility lines at the locations shown on the plans or as
directed by the Engineer. Sawcut the pipe and lateral connections, prior to removal, if the pipe is
not removed at the joint.
F. Cap all pipe openings in accordance with the Town of Yarmouth standards.
G. All excavated materials shall be removed and disposed of off Town of Yarmouth property unless
otherwise noted on the plans.
3.2 BACKFILL
A. Backfill is not included in this section and shall be performed as required by the plans and
requirements of Section 31 00 00 – EARTH MOVING.
END SECTION