Loading...
HomeMy WebLinkAbout02-4113-Utility-Line-Removal_Rev_1Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 02 4113 Utility Line Removal 1 of 2 02 4113 Utility Line Removal PART 1 - GENERAL 1.1 GENERAL PROVISIONS A. Thework under this Section shall consist of existing underground drainage pipes and utility lines, including associated items of work, as shown on the Plans and as specified herein 1.2 Related Work: The following items are not included in this Section and will be performed under the designated Sections: A. Section 31 0000 - EARTH MOVING B. Provision of Waste Management: Section 01 7419, Construction Waste Management Plan. C. Provision of general LEED requirements and forms: Section 01 8113 Sustainable Design Requirements. 1.2 SUBMITTALS (Not Used) 1.3 QUALITY ASSURANCE A. The Contractor shall perform Work in accordance with The Commonwealth of Massachusetts and the Town of Yarmouth rules, regulations, laws and ordinances, and any other authorities having jurisdiction. 1.4 PERMITS, CODES AND SAFETY REQUIREMENTS A. Work shall conform to the Contract Drawings and Specifications and shall comply with applicable codes and regulations. Present in writing to the Architect, all conflicts between the Contract Drawings, Specifications, and applicable codes and regulations, for resolution before commencing the Work. B. Comply with all rules, regulations, laws and ordinances of the Town of Yarmouth and the Commonwealth of Massachusetts, and of all other authorities having jurisdiction. All labor, materials, equipment and services necessary to make the work comply with such requirements, shall be provided without additional cost to the Owner. C. The Contractor shall not close any street, sidewalk or passageway except as indicated on the Contract Drawings. The Contractor shall so conduct his operations as to interfere as little as possible with the use ordinarily made of roads, driveways, sidewalks or other facilities near enough to the work to be affected thereby. Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 02 4113 Utility Line Removal 2 of 2 D. The Contractor shall procure and pay for all permits and licenses required for the complete work specified herein and shown on the Contract Drawings at no additional cost to the Owner. Arrange and pay for legal off-site disposal of all excess excavated materials, obtain proper disposal receipts from the applicable disposal facility for verification. E. Notify "Dig Safe" and the Owner before starting work; comply fully with utility company requirements. PART 2 – PRODUCTS (Not Used) PART 3 - EXECUTION 3.1 DEMOLITION A. The known existing drainage and utility pipelines are shown on the drawings in their approximate locations. Drainage and utility pipelines include but are not limited to reinforced concrete pipe (RCP), PVC, HDPE, ductile iron, cast iron, CMP, clay, etc. B. Locate drainage pipes and utility lines to be removed. C. Field verify, if required, the depth of the drainage pipes and utility lines to be removed. D. Any active pipeline lines encountered by the Contractor during the construction activities shall be isolated by a method approved by the Engineer. E. Excavate and remove the drainage pipes and utility lines at the locations shown on the plans or as directed by the Engineer. Sawcut the pipe and lateral connections, prior to removal, if the pipe is not removed at the joint. F. Cap all pipe openings in accordance with the Town of Yarmouth standards. G. All excavated materials shall be removed and disposed of off Town of Yarmouth property unless otherwise noted on the plans. 3.2 BACKFILL A. Backfill is not included in this section and shall be performed as required by the plans and requirements of Section 31 00 00 – EARTH MOVING. END SECTION