Loading...
HomeMy WebLinkAbout08-0800-Openings-Systems-Commissioning_Rev_1Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 08 0800 Openings Systems Commissioning 1 of 2 SECTION 080800 OPENINGS SYSTEMS COMMISSIONING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 RELATED SECTIONS A. Division 01 – General Requirements B. Section 019113 – General Commissioning Requirements C. Section 019119 - Facility Shell Commissioning D. Division 08 – Openings E. Section 084413 Glaze Aluminum Curtain Walls F. Section 085113 Aluminum Windows 1.3 REQUIRMENTS A. The Commissioning process requires the participation of Division 08, Openings Contractor, to ensure that all systems fulfill the requirements set forth in these construction documents. The general commissioning requirements and coordination are detailed in Section 019113 and 019119. Division 08, Openings, shall fulfill commissioning responsibilities assigned to division 08 in accordance with Section 019113 and 019119. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION 3.1 PRE-FUNCTIONAL CHECKLISTS A. Inspection reports/checklists assist in the process to document that the equipment and systems are installed properly. B. The contractor shall provide any associated checklist and inspection documentation associated with the respective section as indicated by the contract documents. 3.2 FUNCTIONAL PERFORMANCE TESTING A. Intent of functional performance testing is to prove thru functional test procedures proper system operation. Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 08 0800 Openings Systems Commissioning 2 of 2 3.3 FIELD QUALITY CONTROL A. Testing Agency: A qualified testing agency shall be engaged to perform tests and inspections. B. Refer to 084113 for requirements associated with: 1. Water Spray Tests – AAMA 501.2 2. Air Infiltration Tests – ASTM E783 3. Water Penetration Tests – ASTM E1105 C. Glazed aluminum curtain walls and windows will be considered defective if they do not pass tests and inspections. D. Prepare test and inspection reports. Issue reports to Construction manager and Commissioning Agent for review, record and distribution 3.4 INSPECTION CHECKLISTS AND FUNCTIONAL PREFORMANCE TESTING A. Inspection Checklists and testing procedures will be performed on the following system types. These inspection and testing requirements are in addition to and do not replace any testing required elsewhere in Division 08 or by applicable codes.) 1. Walls/Window/Door Systems End of Section Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 08 0800 Openings Systems Commissioning 3 of 2 Installation Checklist and Functional Testing Windows and Walls Please refer to the Master Deficiency and Resolution Log for numbers referenced in pa- rentheses, which will indicate deficiencies discovered and resolved. 1. Participants Discipline Name Company CxA Consulting Engineering Services Window Wall Systems Date Returned to CxA 2. Prerequisite Checklist Check Description ☐ Fenestration installation is complete and ready for inspection and testing ☐ Air and Water Infiltration tests have been performed by 3rd Party Testing Agency ☐ Schedules and setpoints implemented  This checklist does not take the place of the manufacturer’s recommended checkout and startup procedures.  Items that do not apply shall be noted with the reasons on this form (N/A = not applicable, BO = by others).  Contractor’s assigned responsibility for sections of the checklist shall be re- sponsible to see that checklist items by their subcontractors are completed and checked off. Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 08 0800 Openings Systems Commissioning 4 of 2 3. Installation Checks Check if Okay. Enter comment or note number if deficient. Check Equip Tag Walls/Windows COMMENT General Conditions No physical damage observed ☐ No structural issues observed ☐ Exterior Wall Surfaces ☐ Deformed finish not observed ☐ No surface deterioration observed ☐ No staining observed ☐ Interior Wall Surfaces No cracks observed ☐ No water staining observed ☐ No water leaks observed ☐ No deformed finishes observed ☐ Window Conditions No water leaking observed ☐ No air leaking observed ☐ Window units are plumb, level and true to line, without warp or rack of frames or sash ☐ Masonry surfaces are dry and free of excess mortar, sand or other debris ☐ Metal surfaces are dry and clean ☐ Sill members and other members have been set in a bed of sealant or with joint fillers or gaskets to provide weather tight construction ☐ Weeps are installed per construction documents ☐ Weep holes are open and free of debris/blockages ☐ Joint Sealants Backing material has been installed in accordance with sealant mfg require- ments ☐ Surfaces are clean and dry prior to sealant application ☐ Joints are completely filled ☐ Sealant has cured according to mfg recommendations and is ready for test- ing ☐ Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 08 0800 Openings Systems Commissioning 5 of 2 4. Testing performed by 3rd Party Testing Agency Window and Curtainwall Testing ☐ Air Infiltration ☐ Water Infiltration ☐ Respective Testing Agency has provided passing testing reports for review and record. The checklist items all successfully completed for given trade ☐YES ☐NO (THIS PAGE IS BLANK)