HomeMy WebLinkAbout10-0610-Signage-Schedule-_Rev_1Sign ID Message Description Details Qty
A12-1A-001 Message
Exit Exit ID 1
A9-1A-002 Message
Water/Fire Service
Room Number
A103
Room ID 1
A8a-1A-003 Message
Music
Room Number
A102
Classroom ID, ADA Panel 1
A12-1A-004 Message
Exit Exit ID 1
V1-1A-005 Recycle/Trash Decal 1
R3-1A-006 Occupancy Info 1
A9-1A-007 Message
Stage
Room Number
A109F
Room ID 1
A9-1A-008 Message
IDF Room
Room Number
A107
Room ID 1
A8a-1A-009 Message
Music
Room Number
A104
Classroom ID, ADA Panel 1
A8a-1A-010 Message
Music
Room Number
A104
Classroom ID, ADA Panel 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 1 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A9-1A-011 Message
Ensemble 2
Room Number
A106A
Room ID 1
A9-1A-012 Message
Ensemble 1
Room Number
A104A
Room ID 1
R3-1A-013 Occupancy Info 1
V1-1A-014 Recycle/Trash Decal 1
A9-1A-015 Message
Auditorium
Room Number
A109
Room ID 1
G2-1A-016 Graphic, Corridor 1
A8a-1A-017 Message
Music
Room Number
A106
Classroom ID, ADA Panel 1
A9-1A-018 Message
Ensemble
Room Number
A106A
Room ID 1
V1-1A-019 Recycle/Trash Decal 1
A2a-1A-020 Message
Auditorium Area ID, Dimensional Letters 1
R3-1A-021 Occupancy Info 1
A12-1A-022 Message
Exit Exit ID 1
R3-1A-023 Occupancy Info 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 2 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A12-1A-024 Message
Exit Exit ID 1
A12-1A-025 Message
Exit Exit ID 1
R3-1A-026 Occupancy Info 1
A1b-1A-027 Message
Dennis Yarmouth Intermediate
Middle School
School ID, Medium 1
A9-1A-028 Message
Electrical Room
Room Number
A125
Room ID 1
A5a-1A-029 Symbol
[Men Symbol][Accessible Symbol]
Message
Men
Room Number
A111
Restroom ID, ADA Panel 1
A5c-1A-030 Restroom ID, Dimensional
Symbol
1
A11-1A-031 Room Number
A124 Utility Room ID 1
G4-1A-032 Graphic, Nook 1
G1-1A-33 Graphic, Mural/Wall 1
G3-1A-033 Graphic, Vinyl on Glass 1
A5c-1A-034 Restroom ID, Dimensional
Symbol
1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 3 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A5a-1A-035 Symbol
[Women Symbol][Accessible
Symbol]
Message
Women
Room Number
A112
Restroom ID, ADA Panel 1
A5a-1A-036 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
A121
Restroom ID, ADA Panel 1
A2a-1A-037 Message
Auditorium Area ID, Dimensional Letters 1
A9-1A-038 Message
IDF Room
Room Number
A109G
Room ID 1
A9-1A-039 Message
Cafeteria Storage
Room Number
A115
Room ID 1
A2a-1A-040 Message
Cafetorium Area ID, Dimensional Letters 1
V1-1A-041 Recycle/Trash Decal 1
R3-1A-042 Occupancy Info 1
A9-1A-043 Message
Staff Work Room
Room Number
A117
Room ID 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 4 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A9-1A-044 Message
Kitchen
Room Number
A119
Room ID 1
A5a-1A-045 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
TBD
Restroom ID, ADA Panel 1
V1-1A-046 Recycle/Trash Decal 1
A9-1A-047 Message
Electrical Room
Room Number
A118
Room ID 1
A12-1A-048 Message
Exit Exit ID 1
A5a-1A-049 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
(TBD)
Restroom ID, ADA Panel 1
A11-1A-050 Room Number
A118a Utility Room ID 1
A12-1A-051 Message
Exit Exit ID 1
A10a-1A-052 Title
(Name TBD) (Title TBD)
Room Number
A119B
Office ID (Single Insert)1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 5 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A12-1A-053 Message
Exit Exit ID 1
A9-1A-054 Message
Dry Storage
Room Number
A119C
Room ID 1
A12-1A-055 Message
Exit Exit ID 1
A9-1A-056 Message
Freezer
Room Number
A119D
Room ID 1
A9-1A-057 Message
Kitchen Storage
Room Number
A119E
Room ID 1
A9-1A-058 Message
Kitchen Storage
Room Number
A119F
Room ID 1
V1-1A-059 Recycle/Trash Decal 1
A9-1A-060 Message
Staff Lounge
Room Number
A120
Room ID 1
V1-1A-061 Recycle/Trash Decal 1
A12-1A-062 Message
Exit Exit ID 1
G3-1A-063 Graphic, Vinyl on Glass 1
A12-1A-064 Message
Exit Exit ID 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 6 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A12-1A-065 Message
Exit Exit ID 1
S1-1A-066 Stair ID
Stair B1
Floor ID
1
Message
TBD
Stair Egress ID, Occupant Side 1
S2-1A-067 Stair ID
Stair B1
Floor ID
Floor 1
Message
TBD
Stair Egress ID, Stair Side 1
V1-1A-068 Recycle/Trash Decal 1
R3-1A-069 Occupancy Info 1
A9-1A-070 Message
School Store
Room Number
B101A
Room ID 1
Subtotal: 71
A12-1B-001 Message
Exit Exit ID 1
A2b-1B-002 Message
Courtyard Area ID, Vinyl Letters 1
A9-1B-003 Message
Mattacheese Courtyard
Room Number
CRT-1
Room ID 1
G2-1B-004 Graphic, Corridor 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 7 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A8a-1B-005 Message
Art
Room Number
B141
Classroom ID, ADA Panel 1
A8b-1B-006 Classroom ID, Graphic 1
A9-1B-007 Message
Art Workroom
Room Number
B140
Room ID 1
A9-1B-008 Message
Art Kiln
Room Number
B140A
Room ID 1
A8a-1B-009 Message
Art
Room Number
B139
Classroom ID, ADA Panel 1
A8b-1B-010 Classroom ID, Graphic 1
A9-1B-011 Message
Art Work Room
Room Number
B140
Room ID 1
A9-1B-012 Message
Special Education Occupational
Therapy
Room Number
B138
Room ID 1
A9-1B-013 Message
Occupational Therapy Storage
Room Number
B138A
Room ID 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 8 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
S4-1B-014 Level Numeral
1 [Star Symbol]
Elevator Bank Designation
B1
Elevator Jamb ID 1
S4-1B-015 Level Numeral
1 [Star Symbol]
Elevator Bank Designation
B1
Elevator Jamb ID 1
S3-1B-016 Elevator Bank Designation
B1
Map
TBD
Message
In Fire Emergency Use Stairs
Unless Otherwise Instructed
Elevator Egress Info 1
A5a-1B-017 Symbol
[Women Symbol][Accessible
Symbol]
Message
Girls
Room Number
B136
Restroom ID, ADA Panel 1
A5b-1B-018 Symbol
[Women Symbol]Restroom ID, Super Graphic 1
A11-1B-019 Room Number
B137 Utility Room ID 1
A5a-1B-020 Symbol
[Men Symbol][Accessible Symbol]
Message
Boys
Room Number
B135
Restroom ID, ADA Panel 1
A5b-1B-021 Symbol
[Men Symbol]Restroom ID, Super Graphic 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 9 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A9-1B-022 Message
Electrical Room
Room Number
B133
Room ID 1
A9-1B-023 Message
Mattacheese Courtyard
Room Number
CRT-1
Room ID 1
A2b-1B-024 Area ID, Vinyl Letters 1
A12-1B-025 Message
Exit Exit ID 1
A9-1B-026 Message
Gymnasium
Room Number
B123
Room ID 1
A2a-1B-027 Message
Gymnasium Area ID, Dimensional Letters 1
R3-1B-028 Occupancy Info 1
A5a-1B-029 Symbol
[All Gender Symbol][Shower
Symbol][Accessible Symbol]
Message
Staff Changing
Room Number
B132
Restroom ID, ADA Panel 1
A9-1B-030 Message
IDF
Room Number
B133A
Room ID 1
A9-1B-031 Message
Electrical Room
Room Number
B133B
Room ID 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 10 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A5a-1B-032 Symbol
[Men Symbol][Accessible Symbol]
Message
Boys
Room Number
B131A
Restroom ID, ADA Panel 1
A5b-1B-033 Symbol
[Men Symbol]Restroom ID, Super Graphic 1
A5a-1B-034 Symbol
[Men Symbol][Accessible Symbol]
Message
Boys
Room Number
B131A
Restroom ID, ADA Panel 1
A6-1B-035 Symbol
[Men Symbol][Shower Symbol]
Message
Boys Changing
Room Number
B131
Changing Room ID 1
A5a-1B-036 Symbol
[All Gender Symbol][Shower
Symbol][Accessible Symbol]
Message
All Gender Restroom
Room Number
B129A
Restroom ID, ADA Panel 1
A5a-1B-037 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
B130
Restroom ID, ADA Panel 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 11 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A6-1B-038 Symbol
[Locker Symbol]
Message
Locker Room
Room Number
B129
Changing Room ID 1
A6-1B-039 Symbol
[Women Symbol][Shower Symbol]
Message
Girls Changing
Room Number
B128
Changing Room ID 1
A5a-1B-040 Symbol
[Women Symbol][Accessible
Symbol]
Message
Girls
Room Number
B128
Restroom ID, ADA Panel 1
A5a-1B-041 Symbol
[Women Symbol][Accessible
Symbol]
Message
Girls
Room Number
B128A
Restroom ID, ADA Panel 1
A5b-1B-042 Symbol
[Women Symbol]Restroom ID, Super Graphic 1
A9-1B-043 Message
Gym Storage
Room Number
B127
Room ID 1
A12-1B-044 Message
Exit Exit ID 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 12 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
G1-1B-045 Graphic, Mural/Wall 1
A12-1B-046 Message
Exit Exit ID 1
A6-1B-047 Symbol
[Locker Symbol]
Message
Locker Room
Room Number
B126
Changing Room ID 1
A9-1B-048 Message
Adaptive PE
Room Number
B125
Room ID 1
A12-1B-049 Message
Exit Exit ID 1
A10a-1B-050 Title
(Name TBD) (Title TBD)
Room Number
B124A
Office ID (Single Insert)1
R3-1B-051 Occupancy Info 1
A9-1B-052 Message
Gymnasium
Room Number
B123
Room ID 1
A9-1B-053 Message
SRO Office
Room Number
B122
Room ID 1
A2a-1B-054 Message
Gymnasium Area ID, Dimensional Letters 1
G1-1B-055 Graphic, Mural/Wall 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 13 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A1a-1B-056 Message
Dennis-Yarmouth Intermediate
Middle School
School ID, Large 1
A9-1B-057 Message
School Administration
Room Number
B116
Room ID 1
A1c-1B-058 Message
Dennis-Yarmouth Intermediate
Middle School
School ID, Small 1
A3-1B-059 Message
Reception Reception ID 1
A9-1B-060 Message
Administrative Office
Room Number
B120
Room ID 1
A9-1B-061 Message
Conference Room
Room Number
B119
Room ID 1
A9-1B-062 Message
Copy Room
Room Number
B118
Room ID 1
A9-1B-063 Message
Work Room
Room Number
B118
Room ID 1
A9-1B-064 Message
Storage Room
Room Number
B118A
Room ID 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 14 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A10a-1B-065 Title
(Name TBD) (Title TBD)
Room Number
B117
Office ID (Single Insert)1
A10a-1B-066 Title
(Name TBD) (Title TBD)
Room Number
B115
Office ID (Single Insert)1
A5a-1B-067 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
B114
Restroom ID, ADA Panel 1
A10a-1B-068 Title
(Name TBD) (Title TBD)
Room Number
B113
Office ID (Single Insert)1
A9-1B-069 Message
School Records
Room Number
B111
Room ID 1
A9-1B-070 Message
Isolation Room
Room Number
B112J
Room ID 1
A9-1B-071 Message
Exam Room
Room Number
B112F
Room ID 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 15 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A5a-1B-072 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
B112G
Restroom ID, ADA Panel 1
A10a-1B-073 Title
(Name TBD) School Nurse
Room Number
B112C
Office ID (Single Insert)1
A10a-1B-074 Title
(Name TBD) School Nurse
Room Number
B112B
Office ID (Single Insert)1
A5a-1B-075 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
B108
Restroom ID, ADA Panel 1
A10a-1B-076 Title
(Name TBD) (Title TBD)
Room Number
B109
Office ID (Single Insert)1
A10a-1B-077 Title
(Name TBD) (Title TBD)
Room Number
B107
Office ID (Single Insert)1
V1-1B-078 Recycle/Trash Decal 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 16 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A9-1B-079 Message
Work Room
Room Number
B106
Room ID 1
A9-1B-080 Message
Storage Room
Room Number
B106a
Room ID 1
A10a-1B-081 Title
(Name TBD) (Title TBD)
Room Number
B105
Office ID (Single Insert)1
A9-1B-082 Message
Administration Office
Room Number
B104
Room ID 1
A3-1B-083 Message
Reception Reception ID 1
A1c-1B-084 Message
Dennis-Yarmouth Intermediate
Middle School
School ID, Small 1
A9-1B-085 Message
Conference Room
Room Number
B103
Room ID 1
T1-1B-086 Temporary Insert Holder, Letter 20
A9-1B-087 Message
Work Room
Room Number
B106
Room ID 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 17 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A9-1B-088 Message
Administrative Office
Room Number
B102
Room ID 1
A9-1B-089 Message
Conference Room
Room Number
B103
Room ID 1
A9-1B-090 Message
School Nurse
Room Number
B112
Room ID 1
G1-1B-091 Graphic, Mural/Wall 1
A9-1B-092 Message
School Nurse
Room Number
B112
Room ID 1
A9-1B-093 Message
Conference Room
Room Number
B119
Room ID 1
Subtotal: 112
A12-1C-094 Message
Exit Exit ID 1
A8b-1C-095 Classroom ID, Graphic 1
A8a-1C-096 Message
General
Room Number
C101
Classroom ID, ADA Panel 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 18 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A9-1C-097 Message
DOS
Room Number
C116
Room ID 1
A8a-1C-098 Message
General
Room Number
C102
Classroom ID, ADA Panel 1
A8b-1C-099 Classroom ID, Graphic 1
A8a-1C-100 Message
General
Room Number
C104
Classroom ID, ADA Panel 1
A8b-1C-101 Classroom ID, Graphic 1
A8b-1C-102 Classroom ID, Graphic 1
A8a-1C-103 Message
General
Room Number
C103
Classroom ID, ADA Panel 1
A5a-1C-104 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
C118
Restroom ID, ADA Panel 1
A5a-1C-105 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
Restroom
Room Number
C120
Restroom ID, ADA Panel 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 19 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
G2-1C-106 Graphic, Corridor 1
A12-1C-107 Message
Exit Exit ID 1
G2-1C-108 Graphic, Corridor 1
A8b-1C-109 Classroom ID, Graphic 1
A8a-1C-110 Message
Maker Space
Room Number
C125
Classroom ID, ADA Panel 1
A9-1C-111 Message
Prep Room
Room Number
C106A
Room ID 1
A9-1C-112 Message
No Exit
Room Number
CRT-2
Room ID 1
A5a-1C-113 Symbol
[Women Symbol][Accessible
Symbol]
Message
Girls
Room Number
C122
Restroom ID, ADA Panel 1
A5b-1C-114 Symbol
[Women Symbol]Restroom ID, Super Graphic 1
A11-1C-115 Room Number
C123 Utility Room ID 1
A5b-1C-116 Symbol
[Men Symbol]Restroom ID, Super Graphic 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 20 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A5a-1C-117 Symbol
[Men Symbol][Accessible Symbol]
Message
Boys
Room Number
C121
Restroom ID, ADA Panel 1
V1-1C-118 Recycle/Trash Decal 1
S3-1C-119 Elevator Bank Designation
C1
Map
TBD
Message
In Fire Emergency Use Stairs
Unless Otherwise Instructed
Elevator Egress Info 1
S4-1C-120 Level Numeral
1 [Star Symbol]
Elevator Bank Designation
C1
Elevator Jamb ID 1
S4-1C-121 Level Numeral
1 [Star Symbol]
Elevator Bank Designation
C1
Elevator Jamb ID 1
A9-1C-122 Message
ECR
Room Number
C126
Room ID 1
A8a-1C-123 Message
Special Education Resource
Room Number
C105
Classroom ID, ADA Panel 1
A8b-1C-124 Classroom ID, Graphic 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 21 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A8a-1C-125 Message
Special Education Resource
Room Number
C107
Classroom ID, ADA Panel 1
A8b-1C-126 Classroom ID, Graphic 1
A8b-1C-127 Classroom ID, Graphic 1
A8a-1C-128 Message
Health
Room Number
C109
Classroom ID, ADA Panel 1
A9-1C-129 Message
Electrical Closet
Room Number
C127
Room ID 1
A8a-1C-130 Message
Science
Room Number
C106
Classroom ID, ADA Panel 1
A8b-1C-131 Classroom ID, Graphic 1
A9-1C-132 Message
Prep Room
Room Number
C106A
Room ID 1
A9-1C-133 Message
Electrical Room
Room Number
C128
Room ID 1
A9-1C-134 Message
Staff Work Room
Room Number
C129
Room ID 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 22 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A9-1C-135 Message
Staff Work Room
Room Number
C129
Room ID 1
A8b-1C-136 Classroom ID, Graphic 1
A8a-1C-137 Message
World Language
Room Number
C111
Classroom ID, ADA Panel 1
A9-1C-138 Message
IDF Room
Room Number
C130
Room ID 1
A8a-1C-139 Message
General
Room Number
C108
Classroom ID, ADA Panel 1
A8b-1C-140 Classroom ID, Graphic 1
A8b-1C-141 Classroom ID, Graphic 1
A8a-1C-142 Message
English Language Resource
Room Number
C113
Classroom ID, ADA Panel 1
A8a-1C-143 Message
General
Room Number
C110
Classroom ID, ADA Panel 1
A8b-1C-144 Classroom ID, Graphic 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 23 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A5a-1C-145 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
C131
Restroom ID, ADA Panel 1
A8a-1C-146 Message
English Language Resource
Room Number
C115
Classroom ID, ADA Panel 1
A8b-1C-147 Classroom ID, Graphic 1
A5a-1C-148 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
C132
Restroom ID, ADA Panel 1
V1-1C-149 Recycle/Trash Decal 1
G2-1C-150 Graphic, Corridor 1
G2-1C-151 Graphic, Corridor 1
A2b-1C-152 Message
Courtyard Area ID, Vinyl Letters 1
A9-1C-153 Message
Wixon Courtyard
Room Number
CRT-2
Room ID 1
A8a-1C-154 Message
Maker Space
Room Number
C137
Classroom ID, ADA Panel 1
A8b-1C-155 Classroom ID, Graphic 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 24 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A12-1C-156 Message
Exit Exit ID 1
A9-1C-157 Message
Reading Storage
Room Number
C133
Room ID 1
A11-1C-158 Room Number
C134 Utility Room ID 1
A8a-1C-159 Message
Special Education Resource
Room Number
C112
Classroom ID, ADA Panel 1
A8b-1C-160 Classroom ID, Graphic 1
A8a-1C-161 Message
General
Room Number
C117
Classroom ID, ADA Panel 1
A8b-1C-162 Classroom ID, Graphic 1
A8a-1C-163 Message
General
Room Number
C119
Classroom ID, ADA Panel 1
A8b-1C-164 Classroom ID, Graphic 1
A8a-1C-165 Message
Special Education
Room Number
C114
Classroom ID, ADA Panel 1
A8b-1C-166 Classroom ID, Graphic 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 25 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A5a-1C-167 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
C114A
Restroom ID, ADA Panel 1
A9-1C-168 Message
Storage Room
Room Number
C114B
Room ID 1
A12-1C-169 Message
Exit Exit ID 1
A9-1C-170 Message
Gym Storage
Room Number
C135
Room ID 1
Subtotal: 77
A12-1D-001 Message
Exit Exit ID 1
A8b-1D-002 Classroom ID, Graphic 1
A10a-1D-003 Title
(Name TBD) (Title TBD)
Room Number
D115
Office ID (Single Insert)1
A8b-1D-004 Classroom ID, Graphic 1
A8a-1D-005 Message
General
Room Number
D101
Classroom ID, ADA Panel 1
A8b-1D-006 Classroom ID, Graphic 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 26 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A8a-1D-007 Message
General
Room Number
D102
Classroom ID, ADA Panel 1
A8a-1D-008 Message
General
Room Number
D103
Classroom ID, ADA Panel 1
A8b-1D-009 Classroom ID, Graphic 1
A8a-1D-010 Message
General
Room Number
D104
Classroom ID, ADA Panel 1
A8b-1D-011 Classroom ID, Graphic 1
A5a-1D-012 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
D117
Restroom ID, ADA Panel 1
A9-1D-013 Message
Storage Room
Room Number
D119
Room ID 1
G2-1D-014 Graphic, Corridor 1
G1-1D-015 Graphic, Mural/Wall 1
A8b-1D-016 Classroom ID, Graphic 1
A8a-1D-017 Message
Special Education Resource
Room Number
D106
Classroom ID, ADA Panel 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 27 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
V1-1D-018 Recycle/Trash Decal 1
A5a-1D-019 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
D121
Restroom ID, ADA Panel 1
A5a-1D-020 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
D122
Restroom ID, ADA Panel 1
A8b-1D-021 Classroom ID, Graphic 1
A9-1D-022 Message
IDF Room
Room Number
D123
Room ID 1
A8a-1D-023 Message
General
Room Number
D105
Classroom ID, ADA Panel 1
A8b-1D-024 Classroom ID, Graphic 1
A8a-1D-025 Message
Special Education
Room Number
D108
Classroom ID, ADA Panel 1
A8a-1D-026 Message
General
Room Number
D107
Classroom ID, ADA Panel 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 28 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A8b-1D-027 Classroom ID, Graphic 1
A8a-1D-028 Message
General
Room Number
D110
Classroom ID, ADA Panel 1
A8b-1D-029 Classroom ID, Graphic 1
A10a-1D-030 Title
(Name TBD) (Title TBD)
Room Number
D124
Office ID (Single Insert)1
A9-1D-031 Message
Electrical Room
Room Number
D125
Room ID 1
A9-1D-032 Message
Social Work Storage
Room Number
D126
Room ID 1
A9-1D-033 Message
Storage Room
Room Number
D137
Room ID 1
A8b-1D-034 Classroom ID, Graphic 1
A8a-1D-035 Message
General
Room Number
D112
Classroom ID, ADA Panel 1
A9-1D-036 Message
Electrical Closet
Room Number
D127
Room ID 1
A8b-1D-037 Classroom ID, Graphic 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 29 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A8a-1D-038 Message
Science
Room Number
D109
Classroom ID, ADA Panel 1
A9-1D-039 Message
Prep Room
Room Number
D109A
Room ID 1
A9-1D-040 Message
Prep Room
Room Number
D109A
Room ID 1
A8b-1D-041 Classroom ID, Graphic 1
A8a-1D-042 Message
Special Education
Room Number
D114
Classroom ID, ADA Panel 1
A5a-1D-043 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
D128
Restroom ID, ADA Panel 1
A5b-1D-044 Symbol
[Men Symbol]Restroom ID, Super Graphic 1
A5b-1D-045 Symbol
[Women Symbol]Restroom ID, Super Graphic 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 30 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A5a-1D-046 Symbol
[Women Symbol][Accessible
Symbol]
Message
Girls
Room Number
D130
Restroom ID, ADA Panel 1
A5a-1D-047 Symbol
[Men Symbol][Accessible Symbol]
Message
Boys
Room Number
D129
Restroom ID, ADA Panel 1
A11-1D-048 Room Number
TBD Utility Room ID 1
G1-1D-049 Graphic, Mural/Wall 1
G2-1D-050 Graphic, Corridor 1
V1-1D-051 Recycle/Trash Decal 1
A8b-1D-052 Classroom ID, Graphic 1
A8a-1D-053 Message
Special Education Resource
Room Number
D116
Classroom ID, ADA Panel 1
A5a-1D-054 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
D132
Restroom ID, ADA Panel 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 31 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A5a-1D-055 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
D133
Restroom ID, ADA Panel 1
A8b-1D-056 Classroom ID, Graphic 1
A8a-1D-057 Message
General
Room Number
D118
Classroom ID, ADA Panel 1
A8b-1D-058 Classroom ID, Graphic 1
A8b-1D-059 Classroom ID, Graphic 1
A8a-1D-060 Message
General
Room Number
D111
Classroom ID, ADA Panel 1
A8a-1D-061 Message
General
Room Number
D113
Classroom ID, ADA Panel 1
A8b-1D-062 Classroom ID, Graphic 1
A10a-1D-063 Title
(Name TBD) (Title TBD)
Room Number
D134
Office ID (Single Insert)1
A8a-1D-064 Message
General
Room Number
D120
Classroom ID, ADA Panel 1
A8b-1D-065 Classroom ID, Graphic 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 32 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A12-1D-066 Message
Exit Exit ID 1
Subtotal: 66
A11-2A-001 Room Number
B202 Utility Room ID 1
G1-2A-002 Graphic, Mural/Wall 1
A2a-2A-003 Message
Media Center Area ID, Dimensional Letters 1
S2-2A-004 Stair ID
Stair B1
Floor ID
Floor 2
Message
TBD
Stair Egress ID, Stair Side 1
S1-2A-005 Stair ID
Stair B1
Floor ID
Floor 2
Message
TBD
Stair Egress ID, Occupant Side 1
A9-2A-006 Message
Conference Room
Room Number
B201
Room ID 1
S2-2A-007 Stair ID
Stair B1
Floor ID
Floor 2
Message
TBD
Stair Egress ID, Stair Side 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 33 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
S1-2A-008 Stair ID
Stair B1
Floor ID
Floor 2
Message
TBD
Stair Egress ID, Occupant Side 1
Subtotal: 8
A9-2B-001 Message
Guidance Counselor
Room Number
B221
Room ID 1
A10a-2B-002 Title
(Name TBD) (Title TBD)
Room Number
B224
Office ID (Single Insert)1
A10a-2B-003 Title
(Name TBD) (Title TBD)
Room Number
B223
Office ID (Single Insert)1
A9-2B-004 Message
Storage Room
Room Number
B222
Room ID 1
A9-2B-005 Message
Media Center
Room Number
B203
Room ID 1
G5-2B-006 Graphic, Millwork 46
G4-2B-007 Graphic, Nook 1
G4-2B-008 Graphic, Nook 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 34 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A9-2B-009 Message
Innovation/Media Lab
Room Number
B205
Room ID 1
A9-2B-010 Message
Media Work Room
Room Number
B204
Room ID 1
A9-2B-011 Message
Recording
Room Number
B205
Room ID 1
G4-2B-012 Graphic, Nook 1
G4-2B-013 Graphic, Nook 1
G4-2B-014 Graphic, Nook 1
G4-2B-015 Graphic, Nook 1
A9-2B-016 Message
MDF Room
Room Number
B220
Room ID 1
A9-2B-017 Message
Mechanical Room
Room Number
B219
Room ID 1
A9-2B-018 Message
Mechanical Room
Room Number
B219
Room ID 1
A9-2B-019 Message
IT Equipment
Room Number
B218
Room ID 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 35 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A9-2B-020 Message
IT
Room Number
B216
Room ID 1
A9-2B-021 Message
Information Technology
Room Number
B218
Room ID 1
A10a-2B-022 Title
(Name TBD) (Title TBD)
Room Number
B217
Office ID (Single Insert)1
A5a-2B-023 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
B214
Restroom ID, ADA Panel 1
A5a-2B-024 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
B213
Restroom ID, ADA Panel 1
A9-2B-025 Message
ECR
Room Number
B212
Room ID 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 36 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
S3-2B-026 Elevator Bank Designation
B1
Map
TBD
Message
In Fire Emergency Use Stairs
Unless Otherwise Instructed
Elevator Egress Info 1
S4-2B-027 Level Numeral
2
Elevator Bank Designation
B1
Elevator Jamb ID 1
S4-2B-028 Level Numeral
2
Elevator Bank Designation
B1
Elevator Jamb ID 1
G2-2B-029 Graphic, Corridor 1
A5a-2B-030 Symbol
[Women Symbol][Accessible
Symbol]
Message
Girls
Room Number
B210
Restroom ID, ADA Panel 1
A11-2B-031 Room Number
B211 Utility Room ID 1
A5b-2B-032 Symbol
[Women Symbol]Restroom ID, Super Graphic 1
A5a-2B-033 Symbol
[Men Symbol][Accessible Symbol]
Message
Boys
Room Number
B209
Restroom ID, ADA Panel 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 37 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A5b-2B-034 Symbol
[Men Symbol]Restroom ID, Super Graphic 1
A9-2B-035 Message
Conference Room
Room Number
B207
Room ID 1
G1-2B-036 Graphic, Mural/Wall 1
A9-2B-037 Message
Computer Lab
Room Number
B206
Room ID 1
A9-2B-038 Message
Media Center
Room Number
B203
Room ID 1
Subtotal: 83
A8a-2C-001 Message
General
Room Number
C201
Classroom ID, ADA Panel 1
A10a-2C-002 Title
(Name TBD) (Title TBD)
Room Number
C216
Office ID (Single Insert)1
A8b-2C-003 Classroom ID, Graphic 1
A8b-2C-004 Classroom ID, Graphic 1
A8a-2C-005 Message
General
Room Number
C202
Classroom ID, ADA Panel 1
A8b-2C-006 Classroom ID, Graphic 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 38 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A8a-2C-007 Message
General
Room Number
C204
Classroom ID, ADA Panel 1
A8b-2C-008 Classroom ID, Graphic 1
A8b-2C-009 Classroom ID, Graphic 1
A8a-2C-010 Message
Special Education Resource
Room Number
C203
Classroom ID, ADA Panel 1
A5a-2C-011 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
C218
Restroom ID, ADA Panel 1
A8a-2C-012 Message
Special Education Resource
Room Number
C205
Classroom ID, ADA Panel 1
A8b-2C-013 Classroom ID, Graphic 1
A5a-2C-014 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
C220
Restroom ID, ADA Panel 1
G2-2C-015 Graphic, Corridor 1
G2-2C-016 Graphic, Corridor 1
V1-2C-017 Recycle/Trash Decal 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 39 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A5a-2C-018 Symbol
[Men Symbol][Accessible Symbol]
Message
Boys
Room Number
C221
Restroom ID, ADA Panel 1
A11-2C-019 Room Number
C223 Utility Room ID 1
A5b-2C-020 Symbol
[Men Symbol]Restroom ID, Super Graphic 1
A5b-2C-021 Symbol
[Women Symbol]Restroom ID, Super Graphic 1
A5a-2C-022 Symbol
[Women Symbol][Accessible
Symbol]
Message
Girls
Room Number
C222
Restroom ID, ADA Panel 1
A8a-2C-023 Message
Maker Space
Room Number
C225
Classroom ID, ADA Panel 1
A9-2C-024 Message
Prep Room
Room Number
C206A
Room ID 1
A9-2C-025 Message
Prep Room
Room Number
C206A
Room ID 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 40 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
S4-2C-026 Level Numeral
2
Elevator Bank Designation
C1
Elevator Jamb ID 1
S4-2C-027 Level Numeral
2
Elevator Bank Designation
C1
Elevator Jamb ID 1
S3-2C-028 Elevator Bank Designation
C1
Map
TBD
Message
In Fire Emergency Use Stairs
Unless Otherwise Instructed
Elevator Egress Info 1
A9-2C-029 Message
Storage Room
Room Number
C226
Room ID 1
A8b-2C-030 Classroom ID, Graphic 1
A8a-2C-031 Message
World Language
Room Number
C207
Classroom ID, ADA Panel 1
A8a-2C-032 Message
Science
Room Number
C206
Classroom ID, ADA Panel 1
A8b-2C-033 Classroom ID, Graphic 1
A8b-2C-034 Classroom ID, Graphic 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 41 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A8a-2C-035 Message
World Language
Room Number
C209
Classroom ID, ADA Panel 1
A9-2C-036 Message
Electrical Room
Room Number
C227
Room ID 1
A9-2C-037 Message
Electrical Room
Room Number
C228
Room ID 1
A9-2C-038 Message
Staff Work Room
Room Number
C229
Room ID 1
A8b-2C-039 Classroom ID, Graphic 1
A8a-2C-040 Message
English Language Resource
Room Number
C208
Classroom ID, ADA Panel 1
A9-2C-041 Message
Staff Work Room
Room Number
C229
Room ID 1
A8b-2C-042 Classroom ID, Graphic 1
A8a-2C-043 Message
World Language
Room Number
C211
Classroom ID, ADA Panel 1
A8b-2C-044 Classroom ID, Graphic 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 42 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A8a-2C-045 Message
Science
Room Number
C210
Classroom ID, ADA Panel 1
A9-2C-046 Message
Prep Room
Room Number
C210A
Room ID 1
A9-2C-047 Message
IDF Room
Room Number
C230
Room ID 1
A8a-2C-048 Message
Health
Room Number
C213
Classroom ID, ADA Panel 1
A8b-2C-049 Classroom ID, Graphic 1
A5a-2C-050 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
C231
Restroom ID, ADA Panel 1
A5a-2C-051 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
C232
Restroom ID, ADA Panel 1
V1-2C-052 Recycle/Trash Decal 1
G2-2C-053 Graphic, Corridor 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 43 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
G2-2C-054 Graphic, Corridor 1
A11-2C-055 Room Number
C233 Utility Room ID 1
A8a-2C-056 Message
Maker Space
Room Number
C235
Classroom ID, ADA Panel 1
A5a-2C-057 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
C237
Restroom ID, ADA Panel 1
A8b-2C-058 Classroom ID, Graphic 1
A9-2C-059 Message
Reading Storage
Room Number
C236
Room ID 1
A8b-2C-060 Classroom ID, Graphic 1
A8b-2C-061 Classroom ID, Graphic 1
A8a-2C-062 Message
General
Room Number
C215
Classroom ID, ADA Panel 1
A8a-2C-063 Message
General
Room Number
C217
Classroom ID, ADA Panel 1
A8a-2C-064 Message
Special Education NECC
Room Number
C212
Classroom ID, ADA Panel 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 44 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A8b-2C-065 Classroom ID, Graphic 1
A8a-2C-066 Message
General
Room Number
C214
Classroom ID, ADA Panel 1
A8b-2C-067 Classroom ID, Graphic 1
A10a-2C-068 Title
(Name TBD) (Title TBD)
Room Number
C238
Office ID (Single Insert)1
Subtotal: 68
A8a-2D-001 Message
General
Room Number
D201
Classroom ID, ADA Panel 1
A8b-2D-002 Classroom ID, Graphic 1
A10a-2D-003 Title
(Name TBD) (Title TBD)
Room Number
D215
Office ID (Single Insert)1
A8b-2D-004 Classroom ID, Graphic 1
A8b-2D-005 Classroom ID, Graphic 1
A8a-2D-006 Message
General
Room Number
D202
Classroom ID, ADA Panel 1
A8a-2D-007 Message
Special Education
Room Number
D203
Classroom ID, ADA Panel 1
A8b-2D-008 Classroom ID, Graphic 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 45 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A8a-2D-009 Message
General
Room Number
D204
Classroom ID, ADA Panel 1
A8b-2D-010 Classroom ID, Graphic 1
A5a-2D-011 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
D217
Restroom ID, ADA Panel 1
G1-2D-012 Graphic, Mural/Wall 1
A9-2D-013 Message
Storage Room
Room Number
D219
Room ID 1
G2-2D-014 Graphic, Corridor 1
A8b-2D-015 Classroom ID, Graphic 1
A8a-2D-016 Message
Special Education Resource
Room Number
D206
Classroom ID, ADA Panel 1
V1-2D-017 Recycle/Trash Decal 1
A5a-2D-018 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
D221
Restroom ID, ADA Panel 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 46 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A5a-2D-019 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
D222
Restroom ID, ADA Panel 1
A9-2D-020 Message
IDF Room
Room Number
D223
Room ID 1
A8b-2D-021 Classroom ID, Graphic 1
A8a-2D-022 Message
Special Education SAILS
Room Number
D208
Classroom ID, ADA Panel 1
A8b-2D-023 Classroom ID, Graphic 1
A8a-2D-024 Message
Science
Room Number
D207
Classroom ID, ADA Panel 1
A9-2D-025 Message
Prep Room
Room Number
D207A
Room ID 1
A8a-2D-026 Message
General
Room Number
D210
Classroom ID, ADA Panel 1
A8b-2D-027 Classroom ID, Graphic 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 47 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A10a-2D-028 Title
(Name TBD) (Title TBD)
Room Number
D224
Office ID (Single Insert)1
A9-2D-029 Message
Electrical Room
Room Number
D225
Room ID 1
A8b-2D-030 Classroom ID, Graphic 1
A9-2D-031 Message
Social Work Storage
Room Number
D226
Room ID 1
A8a-2D-032 Message
English Language Resource
Room Number
D205
Classroom ID, ADA Panel 1
A9-2D-033 Message
Storage Room
Room Number
D237
Room ID 1
A9-2D-034 Message
Electrical Room
Room Number
D227
Room ID 1
A8b-2D-035 Classroom ID, Graphic 1
A8a-2D-036 Message
General
Room Number
D212
Classroom ID, ADA Panel 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 48 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A8a-2D-037 Message
Science
Room Number
D209
Classroom ID, ADA Panel 1
A8b-2D-038 Classroom ID, Graphic 1
A8a-2D-039 Message
General
Room Number
D214
Classroom ID, ADA Panel 1
A8b-2D-040 Classroom ID, Graphic 1
A9-2D-041 Message
Prep Room
Room Number
D209A
Room ID 1
A9-2D-042 Message
Prep
Room Number
D209A
Room ID 1
A5a-2D-043 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
D238
Restroom ID, ADA Panel 1
A5a-2D-044 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
D228
Restroom ID, ADA Panel 1
A5b-2D-045 Symbol
[Men Symbol]Restroom ID, Super Graphic 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 49 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
V1-2D-046 Recycle/Trash Decal 1
A5b-2D-047 Symbol
[Women Symbol]Restroom ID, Super Graphic 1
A5a-2D-048 Symbol
[Men Symbol]
Message
Boys
Room Number
D229
Restroom ID, ADA Panel 1
A11-2D-049 Room Number
D231 Utility Room ID 1
A5a-2D-050 Symbol
[Women Symbol]
Message
Girls
Room Number
D230
Restroom ID, ADA Panel 1
G1-2D-051 Graphic, Mural/Wall 1
G2-2D-052 Graphic, Corridor 1
A8a-2D-053 Message
Special Education Resource
Room Number
D216
Classroom ID, ADA Panel 1
A8b-2D-054 Classroom ID, Graphic 1
A5a-2D-055 Symbol
[All Gender Symbol][Accessible
Symbol]
Message
All Gender Restroom
Room Number
D233
Restroom ID, ADA Panel 1
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 50 of 51
Section 10 0610
Issued 02 03 2021
Sign ID Message Description Details Qty
A9-2D-056 Message
Reading Storage
Room Number
D232
Room ID 1
A8b-2D-057 Classroom ID, Graphic 1
A8a-2D-058 Message
General
Room Number
D211
Classroom ID, ADA Panel 1
A8a-2D-059 Message
General
Room Number
D213
Classroom ID, ADA Panel 1
A8b-2D-060 Classroom ID, Graphic 1
A8a-2D-061 Message
Special Education STAR II
Room Number
D218
Classroom ID, ADA Panel 1
A8b-2D-062 Classroom ID, Graphic 1
A8a-2D-063 Message
General
Room Number
D220
Classroom ID, ADA Panel 1
A8b-2D-064 Classroom ID, Graphic 1
A10a-2D-065 Title
(Name TBD) (Title TBD)
Room Number
D234
Office ID (Single Insert)1
A8b-2D-066 Classroom ID, Graphic 1
Subtotal: 66
Message Schedule
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 51 of 51
Section 10 0610
Issued 02 03 2021
Type Description Qty
A1a School ID, Large 1
A1b School ID, Medium 1
A1c School ID, Small 2
A2a Area ID, Dimensional Letters 6
A2b Area ID, Vinyl Letters 3
A3 Reception ID 2
A5a Restroom ID, ADA Panel 51
A5b Restroom ID, Super Graphic 14
A5c Restroom ID, Dimensional Symbol 2
A6 Changing Room ID 4
A8a Classroom ID, ADA Panel 77
A8b Classroom ID, Graphic 77
A9 Room ID 112
A10a Office ID (Single Insert)21
A11 Utility Room ID 11
A12 Exit ID 23
G1 Graphic, Mural/Wall 10
G2 Graphic, Corridor 15
G3 Graphic, Vinyl on Glass 2
G4 Graphic, Nook 7
G5 Graphic, Millwork 46
R3 Occupancy Info 9
S1 Stair Egress ID, Occupant Side 3
S2 Stair Egress ID, Stair Side 3
S3 Elevator Egress Info 4
S4 Elevator Jamb ID 8
T1 Temporary Insert Holder, Letter 20
Sign Count
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 1 of 2
Type Description Qty
V1 Recycle/Trash Decal 17
Subtotal: 551
Sign Count
Dennis-Yarmouth Intermediate Middle School
NOT FOR CONSTRUCTION
Issued Date: 2021-01-25
Page 2 of 2
Dennis-Yarmouth
Intermediate/
Middle School
Signage & Experiential Graphics
19 January 2021
Dennis–Yarmouth
Intermediate
Middle School
GIRLS
GIRLS
CHANGING
Music
A104
School
Nurse
B112
Administrative
Office
B120 D119A EXIT
Do you have all of
your belongings?
Check your area
before leaving.
Authorized
Personnel Only
OCCUPANCY BY
MORE THAN
PERSONS IS
DANGEROUS
AND UNLAWFUL
XXX
STAIR 2
2
EXIT HERE
NO RE-ENTRY
THIS FLOOR
(MAP)
A
IN FIRE EMERGENCY
USE EXIT STAIRS UNLESS
INSTRUCTED OTHERWISE
Firstname Lastname
Dennis–Yarmouth
Intermediate
Middle School
EXIT DOWN TO FLOOR 1
FLOORS: B-3 ROOF ACCESS
RE-ENTRY ACCESS ON ALL FLOORS
STAIR A
FLOOR 3
3
Dennis–Yarmouth
Intermediate
Middle School
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
perkinseastman.com
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
IG-1.2
Interior Sign Type
Overview
Overview Pages
Sign ID Description Page
Sign Type Overview IG-1.2
Typography & Symbols IG-1.3
Finishes IG-1.4
Color Strategy IG-1.5
Interior Sign Types
Sign ID Description Page
A1a School ID, Large IG-1.6
A1b School ID, Medium IG-1.7
A1c School ID, Small IG-1.8
A2a Area ID, Dimensional Letters IG-1.9
A2b Area ID, Vinyl Letters IG-1.10
A3 Reception ID IG-1.11
A5a Restroom ID, Panel IG-1.12
A5b Restroom ID, Super Graphic IG-1.14
A5c Restroom ID, Dimensional
Symbol IG-1.15
A6 Changing Room ID IG-1.16
A8a Classroom ID, Panel IG-1.17
A8b Classroom ID, Graphic IG-1.18
A9 Room ID IG-1.19
A10 Office ID IG-1.20
A11 Utility Room ID IG-1.21
A12 Exit ID IG-1.22
R1a Regulatory, Large IG-1.23
R1b Regulatory, Small IG-1.24
R3 Occupancy Information IG-1.25
S1 Stair ID, Occupant Side IG-1.26
S2 Stair ID, Stair Side IG-1.27
S3 Elevator Egress Information IG-1.28
S4 Elevator Jamb ID IG-1.29
T1 Temporary Insert Holder IG-1.30
V1 Trash/Recycle Decal IG-1.31
Experiential Graphics
Sign ID Description Page
Experiential Graphics Table of Contents IG-2.1
Sign Type V
Scale: 1 1/2”=1’-0”
Sign Type T
Scale: 1”=1’-0”
Sign Type S4
Scale: 1”=1’-0”
Sign Type S3
Scale: 1”=1’-0”
Sign Type S2
Scale: 3/8”=1’-0”
Sign Type S1
Scale: 1”=1’-0”
Sign Type R3
Scale: 1"=1'-0"
Sign Type R1b
Scale: 1 1/2”=1’-0”
Sign Type R1a
Scale: 1 1/2”=1’-0”
Sign Type A12
Scale: 1 1/2”=1’-0”
Sign Type A11
Scale: 1 1/2”=1’-0”
Sign Type A10
Scale: 1 1/2”=1’-0”
Sign Type A9
Scale: 1 1/2"=1'-0"
Sign Type A8b
Scale: 1/4"=1'-0"
Sign Type A8a
Scale: 1 1/2"=1'-0"
Sign Type A6
Scale: 1 1/2"=1'-0"
Sign Type A5c
Scale: 1"=1'-0"
Sign Type A5b
Scale: 3/16"=1'-0"
Sign Type A5a
Scale: 1 1/2"=1'-0"
Sign Type A3
Scale: 3/4"=1'-0"
Sign Type A2
Scale: 3/8"=1'-0"
Sign Type A1c
Scale: 3/8"=1'-0"
Sign Type A1b
Scale: 3/16"=1'-0"
Sign Type A1a
Scale: 3/32"=1'-0"
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
perkinseastman.com
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-1.3
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Typography &
Symbols
T1 – Montserrat, Medium
ABCDEFGHIJKLMNOPQRSTUVWXYZ
abcdefghijklmnopqrstuvwxyz
1234567890!@%?&*()
T2 – Montserrat, Regular
ABCDEFGHIJKLMNOPQRSTUVWXYZ
abcdefghijklmnopqrstuvwxyz
1234567890!@%?&*()
T2 – Proxima Nova, Light (Elevator Egress Only)
ABCDEFGHIJKLMNOPQRSTUVWXYZ
abcdefghijklmnopqrstuvwxyz
1234567890!@%?&*()
Women/Girls
Graphic
Women/Girls
w/Shower
Women/GirlsWomen/Girls
w/Accessibility
Accessibility
All Gender
Restroom
Men/Boys
Graphic
Men/Boys
w/Shower
Egress Arrow Star
Men/Boys
Recycle Locker
No Smoking
Men/Boys
w/Accessibility
Trash
Restricted Access
Typography Symbols
General Notes:
All typographic layouts within were designed with Adobe Illustrator 2018,
with optical kerning. The awarded Fabricator is responsible for
purchasing all required typefaces for ensuring the design intent is met.
The awarded Fabricator is also responsible for matching all type dimensions
and tracking as noted within. Fabricator should supply sample layouts for
each sign type, as noted within the Specifications, prior to issuing graphic
layouts or producing any prototypes or final signs/graphics.
Finishes
Paint Finishes
Finish Finish ID Description Specification Exterior/Interior Use
F1 White TBD during CA Phase ADA Panel Signs, Egress,
Regulatory Signs
F2 Blue TBD during CA Phase ADA Panel Signs
F3 Green TBD during CA Phase ADA Panel Signs
F4 Orange TBD during CA Phase ADA Panel Signs
F5 Yellow TBD during CA Phase ADA Panel Signs
F6 Gray MP 5480 Asgard ADA Panel Signs, Egress,
Regulatory Signs
F7 Red TBD during CA Phase Max. Occupancy
F8 Egress Gray TBD during CA Phase Stair ID, Occupant Side
F10 DYIMS Green To match school green Gymnasium
Substrates
Finish Finish ID Description Specification Exterior/Interior Use
F20 Wood Panel To match architectural
material finish palette
ADA Panel Signs,
Dimensional Letterforms,
Restroom Symbols
F21 Vinyl on Glass 3M Dusted Crystal or
approved equal
Area ID
F22 Vinyl on Substrate Custom painted 3M
die-cut vinyl or approved
equal
Restroom Super Graphic
General Notes:
This document is the property of Perkins Eastman. No part of this
document shall be duplicated, disseminated, distributed, or used
for any purpose without express written permission.
Do not use this document for final construction. The awarded
Sign Fabricator is responsible to verify all dimensions and work
conditions and inform the Designer of all variations prior to
performing work. Written dimensions govern over scaled dimensions.
Package to be bid based on design intent criteria as outlined,
including but not limited to all material finishes, mounting methods,
and Specifications criteria.
Bidders may provide additional pricing alternatives which explore
alternate material approach for backer panel while maintaining
design intent. Alternate materials would be reviewed by the Architect,
Designer, and Owner and approved if, and only if, deemed equivalent.
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
perkinseastman.com
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-1.4
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Finishes
F1 - White
Neutral FOH/BOH spaces
(i.e. Admin. Spaces, Lobby)
F2 - Blue
Oceanic/Shoreline Theme
F3 - Green
Marsh Theme
F4 - Yellow
Field Theme
F4 - Orange
Forest Theme
General Notes:
Color strategy to be implemented on ADA panel signs only. All egress
and regulatory signs to maintain F1 color palette (i.e. Stairs, Elevators,
Max. Occupancy, Regulatory Information Signs, etc).
Final colors to be determined as part of Construction Administration Phase
and must be coordinated with the final architectural finish palette.
The color designation for each unique sign will be part of the graphic layout
review during the Construction Administration Phase.
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
perkinseastman.com
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
IG-1.5
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Color Strategy
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
GRAPHIC LAYOUT
SCALE: 1/2"=1'-0"
SCALE: 1/4"=1'-0"
1 ELEVATION 1
SCALE: 1/2"=1'-0"2 SIDE ELEVATION
SCALE: 3"=1'-0"3
INSTALLATION ELEVATION 4
Letterforms
1/2" TH wooden letterforms;
pin-mounted to wall w/fully
concealed threaded rods
Spacers
1/8" TH aluminum spacers;
painted to match wall surface
Sign Type A2aSign Type A2a
Dennis –Yarmouth
Intermediate
Middle School
Dennis –Yarmouth
Intermediate
Middle School
Gymnasium
Firstname Lastname
Gymnasium
Firstname Lastname
Dennis–Yarmouth
Intermediate
Middle School7 5/8"13"1/2"
CL
Text
T2, F20
+10 Tracking
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
perkinseastman.com
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-1.6
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Sign Type A1a
School ID, Large
GRAPHIC LAYOUT
SCALE: 3/4"=1'-0"1 ELEVATION 1
SCALE: 3/4"=1'-0"2
SIDE ELEVATION
SCALE: 3"=1'-0"4SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION3
Dennis –Yarmouth
Intermediate
Middle School
Dennis–Yarmouth
Intermediate
Middle School
Dennis–Yarmouth
Intermediate
Middle School
Letterforms
1/2" TH wooden letterforms;
pin-mounted to wall w/fully
concealed threaded rods
Spacers
1/8" TH aluminum spacers;
painted to match wall surface 7'-0"EQ EQ 6"10 5/16"26 9/16" +/-1/2"
Text
T2, F20
+10 Tracking
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
perkinseastman.com
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-1.7
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Sign Type A1b
School ID. Medium
GRAPHIC LAYOUT
SCALE: 1"=1'-0"
SCALE: 1/4"=1'-0"
1 ELEVATION 1
SCALE: 1"=1'-0"2
INSTALLATION ELEVATION 4 SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION 5
Dennis –Yarmouth
Intermediate
Middle School
Dennis–Yarmouth
Intermediate
Middle School
Dennis–Yarmouth
Intermediate
Middle School
Dennis–Yarmouth
Intermediate
Middle School
6'-0"3"5"13 1/4" +/-SIDE ELEVATION
SCALE: 3"=1'-0"3
Letterforms
3/8" TH wooden letterforms;
pin-mounted to wall w/fully
concealed mechanical fasteners
Spacers
1/8" TH aluminum spacers;
painted to match wall surface 6'-0"3/8"
EQ EQ EQ EQ
Text
T2, F20
+10 Tracking
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
perkinseastman.com
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-1.8
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Sign Type A1c
School ID, Small
GRAPHIC LAYOUT
SCALE: 1 1/2"=1'-0"
SCALE: 1/4"=1'-0"
1 ELEVATION 1
SCALE: 1 1/2"=1'-0"2 SIDE ELEVATION
SCALE: 3"=1'-0"3
INSTALLATION ELEVATION – AUDITORIUM 4 SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION - GYMNASIUM (SOUTH) 6SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION - GYMNASIUM (NORTH) 5 SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION - MEDIA CENTER 7
Letterforms
3/8" TH wooden letterforms;
pin-mounted to wall w/fully
concealed threaded rods
Spacer
1/8" TH aluminum spacers;
painted to match wall surface
Honorific signage
placeholder
Firstname LastnameFirstname Lastname
Auditorium
Firstname Lastname
Gymnasium
Firstname Lastname
Media Center
Firstname Lastname
6"1'4"2 1/4"6 5/8"2"7'-0"Gymnasium
Firstname Lastname
6"7'-0"7'-0"Text
T2, F20
+10 Tracking
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-1.9
DRAWING TITLE:
SCALED AS NOTED
Sign Type A2a
Area ID, Dimensional
Letters
DRAWING NO.:
New York City
115 Fifth Avenue
New York, NY 10003
T. +1 212 353 7200
perkinseastman.com
GRAPHIC LAYOUT
SCALE: 1 1/2"=1'-0"
SCALE: 1/4"=1'-0"
1 ELEVATION 1
SCALE: 1 1/2"=1'-0"2 SIDE ELEVATION
SCALE: 3"=1'-0"3
INSTALLATION ELEVATION – COURTYARD 4 SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION – COURTYARD 5
Vinyl Text
3M Dusted Crystal film or
approved equal; mtd. to first
surface of glass
Honorific signage
placeholder
First LastnameFirst Lastname
Courtyard
First Lastname
Courtyard
First Lastname
CourtyardCourtyard
7'-0"EQ EQ EQ EQ4"2 1/4"6 5/8"7'-0"Text
T2, F21
+10 Tracking
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-1.10
DRAWING TITLE:
SCALED AS NOTED
Sign Type A2b
Area ID, Vinyl Letters
DRAWING NO.:
New York City
115 Fifth Avenue
New York, NY 10003
T. +1 212 353 7200
perkinseastman.com
GRAPHIC LAYOUT
SCALE: 3/4"=1'-0"
SCALE: 1/4"=1'-0"
1 ELEVATION 1
SCALE: 3/4"=1'-0"2 SIDE ELEVATION
SCALE: 3"=1'-0"3
INSTALLATION ELEVATION – NORTH LOBBY 4 SCALE: 1/4"=1'-0
INSTALLATION ELEVATION – SOUTH LOBBY 5
Text
1/8”-1/4” text routed into desk
surface by Others; Fabricator to
coordinate with the GC
Reception
18"18"3"6"Text
T2
+10 Tracking
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
perkinseastman.com
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-1.11
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Sign Type A3
Reception ID
GIRLS
WOMEN MEN BOYS
GIRLS
ALL GENDER
RESTROOM
GIRLS
GRAPHIC LAYOUT
SCALE: 3"=1'-0"1 ELEVATION 1
SCALE: 3"=1'-0"2 SIDE ELEVATION
SCALE: 3"=1'-0"3
SCALE: 3"=1'-0"
ALTERNATE LAYOUTS5
SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION 4
Info Panel
3/8" TH painted acrylic panel w/silkscreened
text and graphics, laminated to backer panel
w/full coverage VHB adhesive
Backer Panel
1/8" TH wooden panel w/applied tactile text
and braille; mtd. to shim w/full coverage VHB
adhesive
Shim
1/16" TH painted acrylic shim; mtd. to wall w/full
coverage VHB adhesive film; inset 1/4" all sides,
painted to match backer panel
1/8"
3/8"
1/16"
2"5'-0"3/8"3/8"4"5/8"1"2"6"3/8"6"8"6 3/4"
3/8"3/8"1"5/8"1"6"3"General Note:
Package to be bid based on design intent criteria as outlined,
including but not limited to all material finishes, mounting methods,
and Specifications criteria.
Bidders may provide additional pricing alternatives which explore
alternate material approach for backer panel while maintaining
design intent. Alternate materials would be reviewed by the Architect,
Designer, and Owner and approved if, and only if, deemed equivalent.
Info. Panel
F1 (Neutral Palette)
TBD (Theme Palette)
Graphics
F6 (Neutral Palette)
F1 (Theme Palette)
Tactile Text
T1, F1
Backer Panel
F20
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
perkinseastman.com
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-1.12
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Sign Type A5a
Restroom ID, Panel
MEN
BOYS GIRLS
GIRLS ALL GENDERRESTROOM
SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION 4 SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION 5
SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION 1 SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION 3SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION 2
Sign Type A5c
Sign Type A5bSign Type A5b5'-0"5'-0"2"
2"5'-0"5'-0"2"
2"5'-0"2"
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
perkinseastman.com
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-1.13
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Sign Type A5a
Restroom ID, Panel
BOYS GIRLS
Sign Type A5a Sign Type A5a
GRAPHIC LAYOUT
SCALE: 1/2"=1'-0"1 ELEVATION 1
SCALE: 1/2"=1'-0"2 SIDE ELEVATION
SCALE: 1/2"=1'-0"3
CL CL66"Vinyl Graphic
Painted die-cut 3M vinyl graphics
(or approved equal), applied directly
to existing wall surface
SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION 4 SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION 53"1 5/8"Graphics
F22
Finish colors TBD
during CA Phase
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
perkinseastman.com
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-1.14
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Sign Type A5b
Restroom ID,
Super Graphic
MEN
GRAPHIC LAYOUT
SCALE: 3"=1'-0"1 ELEVATION 1
SCALE: 3"=1'-0"2 SIDE ELEVATION
SCALE: 3"=1'-0"3
SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION 4
Dimensional Graphics
1/2" TH wooden graphics;
mtd. to shim w/full coverage
VHB adhesive
Shim
1/16" TH painted acrylic shim,
inset 1/16” all sides, painted to match
wall surface; mtd. to wall w/full
coverage VHB adhesive
2"7'-0"10"5/16"3/8"Dimensional Symbol
F20
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
perkinseastman.com
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
IG-1.15
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Sign Type A5c
Restroom ID,
Dimensional
Symbol
NO.:DATE/ISSUE:
1 100% CID
26 January 2021
GIRLS
CHANGING
GIRLS
CHANGING
BOYS
CHANGING
See Sign Type A5a for details
GIRLSCHANGING
5'-0"2"
GRAPHIC LAYOUT - GIRLS
SCALE: 3"=1'-0"
SCALE: 3/16"=1'-0"
1 ELEVATION 1
SCALE: 3"=1'-0"2 SIDE ELEVATION
SCALE: 3"=1'-0"3
INSTALLATION ELEVATION 4 SCALE: 3"=1'-0"
ALTERNATE LAYOUT - BOYS5
1/8"
3/8"
1/16"3/8"4"1"5/8"1"3/8"
6"6"3"6"9"Info. Panel
F1 (Neutral Palette)
TBD (Theme Palette)
Graphics
F6 (Neutral Palette)
F1 (Theme Palette)
Tactile Text
T1, F1
Backer Panel
F20
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
perkinseastman.com
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-1.16
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Sign Type A6
Changing Room ID
Music
A104
Music
A104
Music
A104
ClassroomName
C104
GRAPHIC LAYOUT
SCALE: 3"=1'-0"
SCALE: 1/4"=1'-0"
1 ELEVATION 1
SCALE: 3"=1'-0"2 SIDE ELEVATION
SCALE: 3"=1'-0"3
INSTALLATION ELEVATION 4 SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION 5
Line of edge of
Spacer beyond
Paper Insert
6" x 3" TH digitally
printed paper insert
NOTE:
Use Strathmore Bright
White paper or approved
alternate
See Sign Type A5a for details
Spacer
1/16” TH painted acrylic spacer
to allow sign to receive paper insert,
painted to match info panel; mtd.
to backer panel w/full coverag VHB
adhesive
1/16"
1/8"
1/16"
3/8"
2"5'-0"5'-0"6"5 1/2"1/2"1"5/8"3 1/2"2"3/8"1 1/16"3/8"
6"
2"
Info. Panel
F1 (Neutral Palette)
TBD (Theme Palette)
Text
T2, F6 (Neutral Palette)
T2, F1 (Theme Palette)
+10 Tracking
Tactile Text
T1, F1
Backer Panel
F20
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
perkinseastman.com
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-1.17
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Sign Type A8a
Classroom ID, Panel
GRAPHIC LAYOUT
SCALE: 1/2"=1'-0"
SCALE: 1/4"=1'-0"
1 ELEVATION 1
SCALE: 3"=1'-0"2 SIDE ELEVATION
SCALE: 3"=1'-0"3
INSTALLATION ELEVATION 24'-5"2'-0"7'-0"Graphics
F21
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
perkinseastman.com
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-1.18
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Sign Type A8b
Classroom ID,
Graphic
School
Nurse
B112
School
Nurse
B1127/8"5 1/2"3 1/2"1"5/8"3 1/2"2"3/8"1 1/16"3/8"
6"
SchoolNurse
B112
5'-0"5'-0"SCALE: 1/4"=1'-0"
SIDE ELEVATION
SCALE: 3"=1'-0"3
INSTALLATION ELEVATION4
See Sign Type A5a for details
WaitingRoom
B120
3/8"
1/8"
1/16"
GRAPHIC LAYOUT
SCALE: 3"=1'-0"1 ELEVATION 1
SCALE: 3"=1'-0"2
6"
2"
2"
Info. Panel
F1 (Neutral Palette)
TBD (Theme Palette)
Text
T2, F6 (Neutral Palette)
T2, F1 (Theme Palette)
+10 Tracking
Tactile Text
T1, F1
Backer Panel
F20
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
perkinseastman.com
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-1.19
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Sign Type A9
Room ID
Administrative
Office
B120
Administrative
Office
B120
AdministrativeOffice
B120
5'-0"SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION 4
GRAPHIC LAYOUT
SCALE: 3"=1'-0"1 ELEVATION 1
SCALE: 3"=1'-0"2 SIDE ELEVATION
SCALE: 3"=1'-0"3
Line of edge of
Spacer beyond
Paper Insert
6" x 3" TH digitally
printed paper insert
NOTE:
Use Strathmore Bright
White paper or approved
alternate
See Sign Type A5a for details
Spacer
1/16” TH painted acrylic spacer
to allow sign to receive paper insert,
painted to match info panel; mtd.
to backer panel w/full coverag VHB
adhesive
1/16"
1/8"
1/16"
3/8"6"5 1/2"1/2"1"5/8"3 1/2"2"3/8"1 1/16"3/8"
6"7/8"Info. Panel
F1 (Neutral Palette)
TBD (Theme Palette)
Text
T2, F6 (Neutral Palette)
T2, F1 (Theme Palette)
+10 Tracking
Tactile Text
T1, F1
Backer Panel
F20
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
perkinseastman.com
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-1.20
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Sign Type A10
Office ID
D119AD119A
D119A
GRAPHIC LAYOUT
SCALE: 3"=1'-0"
SCALE: 1/4"=1'-0"
1 ELEVATION 1
SCALE: 3"=1'-0"2 SIDE ELEVATION
SCALE: 3"=1'-0"3
INSTALLATION ELEVATION 4
2"
1/16"
1/8"
3/8"3/8"5/8"2"6"
See Sign Type A5a for
backer panel and shim details
5'-0"Tactile Text
T1, F1
Backer Panel
F20
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
perkinseastman.com
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-1.21
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Sign Type A11
Utility Room ID
EXIT EXIT
EXIT
GRAPHIC LAYOUT
SCALE: 3"=1'-0"
SCALE: 1/4"=1'-0"
1 ELEVATION 1
SCALE: 3"=1'-0"2 SIDE ELEVATION
SCALE: 3"=1'-0"3
INSTALLATION ELEVATION 4
6"2"3/8"3/8"5/8"5'-0"1/16"
1/8"
See Sign Type A5a for
backer panel and shim details
2"
Tactile Text
T1, F1
Backer Panel
F20
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
perkinseastman.com
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-1.22
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Sign Type A12
Exit ID
AUTHORIZEDPERSONNEL ONLY24-HOUR SURVEILLANCE
Do you have all of
your belongings?
Check your area
before leaving.
Do you have all of
your belongings?
Check your area
before leaving.
Please place
your tray in
the bin below.
Authorized
Personnel Only
GRAPHIC LAYOUT
SCALE: HALF SIZE
SCALE: 3/8"=1'-0"
1 ELEVATION 1
SCALE: HALF SIZE2 SIDE ELEVATION
SCALE: HALF SIZE3
INSTALLATION ELEVATION 4 SCALE: 3"=1'-0"
ALTERNATE LAYOUTS5
Info Panel
1/8" TH painted acrylic panel w/silkscreened
text and graphics, laminated to shim
w/full coverage VHB adhesive
Shim
1/16" TH painted acrylic shim inset 1/4” all sides;
mtd. to wall w/full coverage VHB adhesive film
For messages w/text
For messages w/symbols
2"4' 6"6"5 1/2"3/8"3/8"1 1/8"5/8"3/4"1/2"3/8"1 1/4"3/8"7/16"1 3/4"3/4"3/8"2 1/2"3/8"1"3/8"5/8"3/4"
1/8"
1/16"
Info Panel
F1
Graphics & Text
T2, F6
+10 Tracking
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
perkinseastman.com
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-1.23
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Sign Type R1a
Regulatory, Large
Authorized
Personnel Only
Thank you for
not smoking.
Authorized
Personnel Only
5'-0"AuthorizedPersonnel Only
GRAPHIC LAYOUT
SCALE: HALF SIZE
SCALE: 1/4"=1'-0"
1 ELEVATION 1
SCALE: HALF SIZE2 SIDE ELEVATION
SCALE: HALF SIZE3
TYPICAL INSTALLATION ELEVATION 4 SCALE: HALF SIZE
ALTERNATE LAYOUT5
See Sign Type R1a for details
ADA panel sign
may occur
For messages w/symbols
For messages with text
1/8"
1/16"
2"
3/8"3/8"3/8"3/8"3/8"5/8"1 1/4"1/2"2"6"
3/8"3/8"3/8"5/8"3/4"
Info Panel
F1
Graphics & Text
T2, F6
+10 Tracking
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
perkinseastman.com
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-1.24
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Sign Type R1b
Regulatory, Small
A
OCCUPANCY BY
MORE THAN
PERSONS IS
DANGEROUS
AND UNLAWFUL
XXX
OCCUPANCY BY
MORE THAN
PERSONS IS
DANGEROUS
AND UNLAWFUL
XXX
OCCUPANCY BY MORE THAN PERSONS ISDANGEROUSAND UNLAWFUL
XXX
GRAPHIC LAYOUT
SCALE: 3"=1'-0"
SCALE: 1/4"=1'-0"
1 ELEVATION 1
SCALE: 3"=1'-0"2 SIDE ELEVATION
SCALE: 3"=1'-0"3
INSTALLATION ELEVATION 4
See Sign Type R1a for details
1/4"
1/16"
14"12 3/4"1"3/4"1 3/4"1 1/4"1 13/16"2 1/2"3/4"
2"ALIGN TO DOOR FRAMEInfo Panel
F1
Graphics & Text
T2, F7
+10 Tracking
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
perkinseastman.com
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-1.25
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Sign Type R3
Occupancy
Information
GRAPHIC LAYOUT
SCALE: 3"=1'-0"
SCALE: 3/8"=1'-0"
1 ELEVATION 1
SCALE: 3"=1'-0"2 SIDE ELEVATION
SCALE: 3"=1'-0"3
INSTALLATION ELEVATION 4
STAIR 2
2
STAIR 2
2
EXIT HERE
NO RE-ENTRY
THIS FLOOR
EXIT HERE
NO RE-ENTRY
THIS FLOOR
See Sign Type A5a for
info panel details
5'-0"STAIR 2
2
EXIT HERENO RE-ENTRYTHIS FLOOR
1/4"
1/16"12"7 1/2"3/8"1/2"4"3"1"5/8"1 1/16"1 1/8"3/8"
Info Panel
F1
Graphics & Text
Tactile Text:
T1, F6
Non-Tactile Text:
T2, F6
+10 Tracking
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
perkinseastman.com
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-1.26
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Sign Type S1
Stair ID
Occupant Side
SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION 4
GRAPHIC LAYOUT
SCALE: 1 1/2"=1'-0"1 ELEVATION
SCALE: 1 1/2"=1'-0"2
EXIT DOWN
TO FLOOR 1
FLOORS: B-3
ROOF ACCESS
RE-ENTRY ACCESS
ON ALL FLOORS
STAIR A
FLOOR 3
3
SIDE ELEVATION
SCALE: 1 1/2"=1'-0"3
EXIT DOWN
TO FLOOR 1
FLOORS: B-3
ROOF ACCESS
RE-ENTRY ACCESS
ON ALL FLOORS
STAIR A
FLOOR 3
3
EXIT DOWN TO FLOOR 1
FLOORS: B-3 ROOF ACCESS
RE-ENTRY ACCESS ON ALL FLOORS
STAIR AFLOOR 3
3
Info Panel
1/8" TH photo-luminescent panel w/silkscreened
graphics, text, tactile information and braille;
laminated to shim w/full coverage VHB adhesive
Shim
1/8" TH painted acrylic shim inset 1/4” all sides,
painted to match face panel; mtd. to wall w/full
coverage VHB adhesive film 1 1/2"3"2"7"4 3/4"3 1/2"1"1 1/2"2 1/2"2 5/8"5/8"1"1"2" Min.26 1/2"16 1/2"1"1 1/4"5'-0"Graphics & Text
Tactile Text:
T1, F8
Non-Tactile Text:
T2, F8
+10 Tracking
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
perkinseastman.com
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-1.27
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Sign Type S2
Stair ID
Stair Side
GRAPHIC LAYOUT
SCALE: 1 1/2"=1'-0"
SCALE: 1/4"=1'-0"
1 ELEVATION
SCALE: 1 1/2"=1'-0"2 SIDE ELEVATION
SCALE: 1 1/2"=1'-0"3
INSTALLATION ELEVATION 4
(MAP)
A
IN FIRE EMERGENCY
USE EXIT STAIRS UNLESS
INSTRUCTED OTHERWISE
IN FIRE EMERGENCY
USE STAIRS UNLESS
OTHERWISE INSTRUCTED
(MAP)
A
CL
(MAP)
A
IN FIRE EMERGENCYUSE STAIRS UNLESSINSTRUCTED OTHERWISE
See Sign Type R1a for details
1/8"
3/8"3"4"1 3/16"6"1 9/16"1/2"15/16"2"3/8"16"10"
Info Panel
F1
Graphics & Text:
Bank ID & Map:
T1, F6
Egress Info:
T3, F7
-10 Tracking
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
perkinseastman.com
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-1.28
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Sign Type S3
Elevator Egress
Info
GRAPHIC LAYOUT
SCALE: 3"=1'-0"
SCALE: 3/8"=1'-0"
1 ELEVATION 1
SCALE: 3"=1'-0"2 SIDE ELEVATION
SCALE: 3"=1'-0"3
INSTALLATION ELEVATION 4
2
A
CL 3"4"4"2 1/2"2 1/2"3"1/4"1/4"CL
CL1/4"1/4"3"2 1/2"1 1/2"4"8"2
A
2
A 1
Info Panel
1/8" TH painted acrylic panel w/silkscreened
integral ADA tactile text and braille, laminated
to jamb surface w/full coverage VHB adhesive 60"Info Panel
F1
Graphics & Text
T2, F6
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
perkinseastman.com
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-1.29
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Sign Type S4
Elevator Jamb ID
Header Text
Body Text
Authorized
Personnel
Only
24-Hour
Surveillance
2"2"5'-0"4"5'-0"GRAPHIC LAYOUT
SCALE: 3"=1'-0"
SCALE: 1/4"=1'-0"
1 ELEVATION 1
SCALE: 3"=1'-0"2 3D VIEW
SCALE: NTS3
INSTALLATION ELEVATION 4 SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION 5 SCALE: 3"=1'-0"
ALTERNATE LAYOUTS6
Info Holder Frame
Painted Infonorm EPICS insert holder for 8.5”x11” paper;
laminated to shim w/full coverage VHB adhesive
Shim
1/16” TH painted acrylic shim, inset 1/4” all sides;
mtd. to surface w/full coverage VHB adhesive
8 3/4"+/-12"+/-1/4"
1/8"
Frame
Color/Finish TBD during
CA Phase
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
perkinseastman.com
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-1.30
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Sign Type T1
Temporary Insert
Holder
GRAPHIC LAYOUT
SCALE: 3"=1'-0"
SCALE: 1 1/2"=1'-0"
1 ELEVATION 1
SCALE: 3"=1'-0"2 SIDE ELEVATION
SCALE: 3"=1'-0"3
INSTALLATION ELEVATION 4
CL CL
Millwork by others
Graphic
Graphic
Painted die-cut adhesive vinyl
applied directly to millwork/surface
Millwork by Others
3"3"Graphics
F6
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
perkinseastman.com
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-1.31
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Sign Type V1
Trash/Recycle Decal
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.1
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Table of Contents
Description Page
Table of Contents IG-2.1
Finishes IG-2.2
Floor Plans IG-2.3
1A-First Floor A, Lobby A100 West IG-2.4
1A-First Floor A, Corridor A101 North IG-2.5
1A-First Floor A, Corridor Nooks A 100B West IG-2.6
1A-First Floor A, Corridor Glass A100B East IG-2.7
1A-First Floor A, Cafetorium A116 North IG-2.8
1B-First Floor B, Lobby B101 East IG-2.9
1B-First Floor B, Lobby B101 South IG-2.10
1B-First Floor B, Lobby B101 West IG-2.11
1B-First Floor B, Gym B123 East IG-2.12
1B-First Floor B, Gym B123 West IG-2.13
1C-First Floor C, Corridor C139 West IG-2.14
1C-First Floor C, Corridor C141 West IG-2.15
1C-First Floor C, Corridor C140 East IG-2.16
1C-First Floor C, Corridor C142 East IG-2.17
1D-First Floor D, Corridor D136 East IG-2.18
1D-First Floor D, Corridor D135 West IG-2.19
1D-First Floor D, Corridor D100 Northeast IG-2.20
1D-First Floor D, Corridor D100 Northwest IG-2.21
2B-Second Floor B, B200 South IG-2.22
2B-Second Floor B, Media Center B203 West IG-2.23
2B-Second Floor B, Media Center B203 East IG-2.24
2B-Second Floor B, Media Center Bookcase Detail IG-2.25
2B-Second Floor B, Media B200 East IG-2.26
2C-Second Floor C, Corridor C240 West IG-2.27
2C-Second Floor C, Corridor C239 West IG-2.28
2C-Second Floor C, Corridor C243 East IG-2.29
2C-Second Floor C, Corridor C241 East IG-2.30
2D-Second Floor D, Corridor D230 East IG-2.31
2D-Second Floor D, Corridor D235 West IG-2.32
2D-Second Floor D, Corridor D200 Northeast IG-2.33
2D-Second Floor D, Corridor D200 Northwest IG-2.34
All Experiential Graphics are for placeholder only
and should be used for design intent and bid
purposes. All final artwork to be provided prior to
final production. Experiential Graphics
Table of Contents
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.2
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Finishes
F2 – Blue
Color TBD during
CA Phase
F12 – Light Blue
Color TBD during
CA Phase
F3 – Green
Color TBD during
CA Phase
F13 – Light Green
Color TBD during
CA Phase
F4 – Orange
Color TBD during
CA Phase
F14 – Light Orange
Color TBD during
CA Phase
F5 – Yellow
Color TBD during
CA Phase
F15 – Light Yellow
Color TBD during
CA Phase
F16 – Dark Gray
Color TBD during
CA Phase
F17 – Light Gray
Color TBD during
CA Phase
F18 – Sand
Color TBD during
CA Phase
F19 – Grey
Color TBD during
CA Phase
Finishes
A A
B B
C C
D D
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.3
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
Floor Plans
SCALE: 3/16"=1'-0"
INTERIOR ELEVATION - LOBBY A100 WEST1
36'-0"+/-VIF
9'-2"+/-VIFBoston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.4
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
1A-First Floor A
Lobby A100 West
Graphics, Wall/Mural
Painted wall surface w/surface
applied 3M vinyl graphics (or
approved equal
Add. Alt. Pricing:
Large format, full bleed digital
print graphics on vinyl wallcovering.
Graphics
F2, F12
SCALE: 3/16"=1'-0"
INSTALLATION ELEVATION - CORR. A101 NORTH17’-2"+/-VIF72'+/- VIF
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.5
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
1A-First Floor A
Corr A101 North
Graphics, Corridor
1/2”TH 3Form Chroma (or
approved equal); laminated to
1/8” TH painted acrylic backer
(painted to match existing wall
surface). Backer panel to match
graphic profile
General Note:
Slim profile line graphic to maintain
1/2” stroke width min. (as shown in
all drawings within), constructed of
1/2” TH 3Form Chroma
Graphics
F12
SCALE: 1/8"=1'-0"
INTERIOR ELEVATION - CORR. A100B WEST1
5'-2" +/- VIF
6'-8" +/- VIF7'-0" +/- VIF 5'-2"+/- VIF
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.6
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
1A - First Floor A
Corridor Nooks
A100B West
Graphics, Nook
Painted wall surface w/surface
applied 3M vinyl graphics (or
approved equal
Add. Alt. Pricing:
Large format, full bleed digital
print graphics on vinyl wallcovering.
General Note:
Graphics to be adhered to
existing wall surface behind
clear acrylic panel provided
by others for protection.
Graphics
F1, F2, F12
SCALE: 1/8"=1'-0"
INSTALLATION ELEVATION - CORR. A100B EAST 19’-8"+/- VIF98’-5” +/- VIF
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.7
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
1A-First Floor A
Corridor Glass
A100B East
Graphics, Vinyl on Glass
3M Dusted Crystal (or approved
equal) applied to second surface
of glass
SCALE: 1/8"=1'-0"
INSTALLATION ELEVATION - CAFETORIUM A116 NORTH1
67'-2"+/-VIF
9'-8 1/2"+/-VIF8'+/-VIFBoston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.8
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
1A-First Floor A
Cafetorium A116
North
Graphics, Vinyl on Glass
See page IG-2.7 for similar details
SCALE: 1/8"=1'-0"
INSTALLATION ELEVATION - LOBBY B101 EAST14'-7"+/- VIF72'-9"+/- VIF
Dennis–Yarmouth
Intermediate
Middle School
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.9
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
1B-First Floor B
Lobby B101 East
Graphics, Corridor
See page IG-2.5 for similar details
Graphics
F10
SCALE: 3/32"=1'-0"
INSTALLATION ELEVATION - LOBBY B101 SOUTH126’ +/- VIF82"+/- VIF
100’+/-VIF
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.10
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
1B-First Floor B
Lobby B101 South
Graphics, Wall/Mural
See page IG-2.4 for similar details
Graphics
F1, F17
SCALE: 3/16"=1'-0"
INSTALLATION ELEVATION - LOBBY B101 WEST13'-6"+/- VIF23'-5"+/- VIF
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.11
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
1B-First Floor B
Lobby B101 West
Graphics, Corridor
See page IG-2.5 for similar details
Graphics
F13
SCALE: 3/32"=1'-0"
INSTALLATION ELEVATION - GYM B123 EAST18’-8"+/- VIF34’+/- VIF47’-7"+/- VIF
120’-6"+/- VIF
DOLPHINS
9’+/-VIF4’+/-VIFBoston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.12
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
1B-First Floor B
Gym B123 East
Graphics, Painted Surface
Large-scale graphics painted
directly to existing wall surface
Painted green band to run 360
degrees around Gymnasium interior
as shown in drawings
Text
F1, F16
Band
F10
SCALE: 3/32"=1'-0"
INSTALLATION ELEVATION - GYM 123 WEST1
120’-5"+/- VIF
35’ +/- VIF9’+/-VIFBoston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.13
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
1B-First Floor B
Gym 123 West
Graphics, Painted Surface
Large-scale graphics painted
directly to existing wall surface
Painted green band to run 360
degrees around Gymnasium interior
as shown in drawings
Band
F10
SCALE: 1/4"=1'-0"1 INSTALLATION ELEVATION - CORR. C139 WEST5’+/- VIF24’+/- VIF
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.14
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
1C- First Floor C
Corridor C139 West
Graphics, Corridor
See page IG-2.5 for similar details
Graphics
F12
SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION - CORR. C141 WEST15’+/- VIF25’+/- VIF
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.15
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
1C- First Floor C
Corridor C141 West
Graphics, Corridor
See page IG-2.5 for similar details
Graphics
F13
SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION - CORR. C140 EAST1
24’+/- VIF
5’+/- VIFBoston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.16
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
1C- First Floor C
Corridor C140 East
Graphics, Corridor
See page IG-2.5 for similar details
Graphics
F12
SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION - CORR. C142 EAST1
24’+/- VIF
5’+/- VIFBoston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.17
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
1C- First Floor C
Corridor C142 East
Graphics, Corridor
See page IG-2.5 for similar details
Graphics
F13
SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION - CORR. D136 EAST1
24’+/- VIF
5’+/- VIF3 1/2’+/-VIF 3 1/2’+/-VIF
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.18
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
1D- First Floor D
Corridor D136 East
Graphics, Corridor
See page IG-2.5 for similar details
Graphics
F14
SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION - CORR. D135 WEST1
24’+/- VIF
5’+/- VIF3 1/2’+/-VIF 3 1/2’+/-VIF
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.19
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
1D- First Floor D
Corridor D135 West
Graphics, Corridor
See page IG-2.5 for similar details
Graphics
F14
SCALE: 3/16"=1'-0"
INSTALLATION ELEVATION - CORR. D100 NORTHEAST1
25’+/-VIF
8 1/2’+/-VIFBoston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.20
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
1D- First Floor D
Corridor D100
Northeast
Graphics, Wall/Mural
See page IG-2.4 for similar details
Graphics, Wall/Mural
F4, F14
SCALE: 1/8"=1'-0"
INSTALLATION ELEVATION - D100 NORTHWEST1
25’+/-VIF
8 1/2’+/-VIFBoston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.21
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
1D- First Floor D
Corridor D100
Northwest
Graphics, Wall/Mural
See page IG-2.4 for similar details
Graphics, Wall/Mural
F4, F14
SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION - B200 SOUTH1
14’+/- VIF
8’+/- VIFBoston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.22
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
2B- Second Floor B
B200 South
Graphics, Corridor
See page IG-2.5 for similar details
Graphics
F13
SCALE: 1/4"=1'-0"1 INSTALLATION ELEVATION - MEDIA CENTER B203 EAST6’+/- VIF3.25’+/- VIF 9’+/- VIF
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.23
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
2B- Second Floor B
Media Center B203
West
Graphics, Nook
See page IG-2.6 for similar details
Graphics
F3, F13
SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION - MEDIA CENTER B203 WEST1
8’+/- VIF
6’+/- VIF3 1/4’+/- VIF
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.24
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
2B- Second Floor B
Media Center B203
East
Graphics, Nook
See page IG-2.6 for similar details
Graphics
F3, F13
SCALE: 1"=1'-0"
BOOKCASE ELEVATION - MEDIA CENTER: 3 OF 3 TYPES3 SCALE: 1"=1'-0"
BOOKCASE ELEVATION - MEDIA CENTER: 4 OF 4 TYPES4
SCALE: 1"=1'-0"
BOOKCASE ELEVATION - MEDIA CENTER: 1 OF 4 TYPES1 SCALE: 1"=1'-0"
BOOKCASE ELEVATION - MEDIA CENTER: 2 OF 4 TYPES2
2’+/- VIF 2’++/- VIF
2’+/- VIF 2’++/- VIF
3’ 6” +/- VIF3’ 6”+/- VIF3’ 6” +/- VIF3’ 6” +/- VIFBoston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.25
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
2B- Second Floor B
Media Center
Bookcase Detail
Graphics, Milwork
1/8”-1/4”TH graphics CNC routed
1/8”into existing mill-work endcaps
(by others)
Fabricator is responsible for
coordinating w/GC
Fabricator to assume 4 unique tree
ring patterns to duplicate across all
mill-work pieces
SCALE: 3/16"=1'-0"
INSTALLATION ELEVATION - B200 EAST1
48’+/- VIF
5’+/- VIF141" +/- VIF
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.26
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
2B- Second Floor B
B200 East
Graphics, Corridor
See page IG-2.5 for similar details
Graphics
F13
SCALE: 1/4"=1'-0"1 INSTALLATION ELEVATION - CORR. C240 WEST5’+/- VIF24’+/- VIF
SUM
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.27
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
2C-Second Floor C
Corridor C240 West
Graphics, Corridor
See page IG-2.5 for similar details
Graphics
F13
SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION - CORR. C239 WEST15’+/- VIF25’+/- VIF
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.28
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
2C-Second Floor C
Corridor C239 West
Graphics, Corridor
See page IG-2.5 for similar details
Graphics
F13
SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION - CORR. C243 EAST1
24’+/- VIF
5’+/- VIFBoston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.29
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
2C-Second Floor C
Corridor C243 East
Graphics, Corridor
See page IG-2.5 for similar details
Graphics
F13
SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION - CORR. C241 EAST15’+/- VIF25’+/- VIF
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.30
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
2C-Second Floor C
Corridor C241 East
Graphics, Corridor
See page IG-2.5 for similar details
Graphics
F13
SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION - CORR. D230 EAST1
24’+/- VIF
5’+/- VIF3.5’+/-VIF 3.5’+/-VIF
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.31
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
2D- Second Floor D
Corridor D230 East
Graphics, Corridor
See page IG-2.5 for similar details
Graphics
F15
SCALE: 1/4"=1'-0"
INSTALLATION ELEVATION - CORR. D235 WEST1
24’+/- VIF
5’+/- VIF3.5’+/-VIF 3.5’+/-VIF
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.32
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
2D- Second Floor D
Corridor D235 West
Graphics, Corridor
See page IG-2.5 for similar details
Graphics
F15
SCALE: 3/16"=1'-0"
INSTALLATION ELEVATION - CORR. D200 NORTHEAST1
25’+/-VIF
8.5’+/-VIFBoston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.33
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
2D- Second Floor D
Corridor D200
Northeast
Graphics, Wall/Mural
See page IG-2.4 for similar details
Graphics, Wall/Mural
F5, F15
SCALE: 1/8"=1'-0"
INSTALLATION ELEVATION - D200 NORTHWEST1
Boston
20 Ashburton Place
Floor 8
Boston, MA 02108
T. +1 617 449 4000
286 Station Avenue
South Yarmouth, MA 02664
This document and the entirety
of its contents are the property
of Perkins Eastman.
No part of this document should
be duplicated, disseminated,
distributed or used for any purpose
without express written consent.
Not for use in final construction.
The awarded fabricator is responsible
to verify all dimensions and work
conditions and inform Perkins Eastman
of variations prior to performing work.
Written dimensions supersede scaled
dimensions.
PROJECT:
71011
Dennis-Yarmouth
Intermediate/
Middle School
NO.:DATE/ISSUE:
1 100% Construction Documents
19 January 2021
IG-2.34
DRAWING NO.:
DRAWING TITLE:
SCALED AS NOTED
2D- Second Floor D
Corridor D200
Northwest
Graphics, Wall/Mural
See page IG-2.4 for similar details
Graphics, Wall/Mural
F5, F15
1D:
First Floor D
Forest + Fields - Orange
1C:
First Floor C
Shoreline + Marsh + Streams - Blue
1B:
First Floor B
Shoreline + Marsh + Streams - Greens
1A:
First Floor A
Ocean + Shoreline - Blue
2B:
Second Floor B
Shoreline+ Marsh + Streams - Greens
2C:
Second Floor C
Marsh + Streams - Greens
2D:
Second Floor D
Forest + Fields - Yellow
(THIS PAGE IS BLANK)