HomeMy WebLinkAbout11-6653.23-Sports-Netting_Rev_0Dennis Yarmouth Intermediate Middle School January 19, 2021
Dennis Yarmouth Regional School District 100% Construction Documents
Perkins Eastman DPC, project #71011
SPORTS NETTING
11 6653.23 - 1
SECTION 11 6653.23
SPORTS NETTING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes fixed sports netting.
B. Related Requirements:
1. Section 05 5000 “Metal Fabrications" for miscellaneous steel framing and supports for
mounting sports netting.
2. Section 11 6623 "Gymnasium Equipment" for basketball and volleyball equipment and for
safety pads.
3. Section 11 6653 “Gymnasium Dividers" for electrically-operated roll-up gymnasium
divider curtain systems
1.3 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1.4 ACTION SUBMITTALS
A. Make Submittals in accordance with Section 01 3300 “Submittal Procedures.”
B. Product Data: For each type of product.
C. Shop Drawings: For fixed sports netting.
1. Include plans showing alignment of sports netting in relation to sport-court layout and
overhead structural supports.
2. Include elevations, sections, details, and attachments to other work.
3. Include system clearances and limits for fitting into adjacent construction.
4. Include point loads and locations for attachment of sports netting to structure.
D. Samples for Verification: For sports netting fabrics, not less than 12 inches square.
1.5 INFORMATIONAL SUBMITTALS
A. Coordination Drawings: Reflected ceiling plans with sports netting layouts, drawn to scale, on
which the following items are shown and coordinated with each other, based on input from
installers of the items involved:
1. Structural members to which sports netting will be attached.
Dennis Yarmouth Intermediate Middle School January 19, 2021
Dennis Yarmouth Regional School District 100% Construction Documents
Perkins Eastman DPC, project #71011
SPORTS NETTING
11 6653.23 - 2
2. Suspended ceiling components, if any.
3. Items supported from building structure, including the following:
a. Lighting fixtures.
b. Air outlets and inlets.
c. Speakers.
d. Sprinklers.
e. Smoke detectors.
f. Acoustical treatments or panels.
g. Access panels.
B. Qualification Data: For Installer.
C. Sample Warranty: For special warranty.
1.6 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For sports netting to include in maintenance manuals.
1.7 QUALITY ASSURANCE
A. Installer Qualifications: Fabricator of products or an entity that employs installers and
supervisors who are trained and approved by manufacturer.
1.8 FIELD CONDITIONS
A. Environmental Limitations: Do not install sports netting until spaces are enclosed and
weatherproof, wet work in spaces is complete and dry, and ambient temperature and humidity
conditions are maintained at the levels indicated for Project when occupied for its intended use.
B. Field Measurements: Verify size of space, available clearances, obstructions, and position for
sports netting.
1.9 COORDINATION
A. Coordinate installation of sports netting and suspension-system components with other
construction including light fixtures, HVAC equipment, fire-suppression-system components,
and partition assemblies.
1.10 WARRANTY
A. Special Warranty: Manufacturer agrees to repair or replace components of sports netting that
fail in materials or workmanship within specified warranty period.
1. Failures include, but are not limited to, the following:
a. Tearing or deterioration of fabric, seams, or other materials beyond normal use.
2. Warranty Period: Five years from date of Substantial Completion.
Dennis Yarmouth Intermediate Middle School January 19, 2021
Dennis Yarmouth Regional School District 100% Construction Documents
Perkins Eastman DPC, project #71011
SPORTS NETTING
11 6653.23 - 3
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Source Limitations: Obtain sports netting from single source from single manufacturer.
2.2 SPORTS NETTING
A. Basis-of-Design Product: Subject to compliance with requirements, provide Sport Netting No.
SN-SQ-36-134 by U.S. Netting, Inc. or a comparable product by one of the following or equal:
1. All Sport Netting, Inc.
2. Nets of America.
3. Midwest Netting Solutions, LLC.
4. On Deck Sports.
B. Sports Netting System: Fixed, cable-suspended system, and as follows:
1. Netting Construction: No. 36 knotted nylon, 1-3/4 inch mesh with a breaking strength not
less than 350 pounds per strand.
2. Netting Edge Binding: Provide edge binding on all edges with black 3/8 inch rope binding
material.
3. Netting Color: Black.
4. Netting Size: As indicated on Drawings.
5. Flame-Resistance Rating: Passes NFPA 701 Test 2.
C. Hardware: Provide hardware as necessary, including turnbuckles and snap hooks, for
attachment to building structure
1. Support Cable: 1/4-inch- diameter galvanized-stranded-steel wire rope with a breaking
strength of 7000 lb. Provide fittings according to the wire rope manufacturer's written
instructions for size, type, number, and installation method.
2. General-Purpose Chain: Provide carbon steel chain, according to ASTM A 413/A 413M,
Grade 30 proof coil chain or higher grade recommended by gymnasium divider
manufacturer. Provide coating type, chain size, number, and installation method
according to manufacturer's written instructions.
3. Anchors, Fasteners, Fittings, and Hardware: Manufacturer's standard corrosion-resistant
or noncorrodible units; concealed.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with
requirements for alignment of mounting substrates, installation tolerances, clearances, and
other conditions affecting performance of the Work.
1. Verify critical dimensions.
2. Examine supporting structure.
3. Examine wall assemblies, where reinforced to receive anchors and fasteners, to verify
that locations of concealed reinforcements are clearly marked. Locate reinforcements
and mark locations.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
Dennis Yarmouth Intermediate Middle School January 19, 2021
Dennis Yarmouth Regional School District 100% Construction Documents
Perkins Eastman DPC, project #71011
SPORTS NETTING
11 6653.23 - 4
3.2 INSTALLATION
A. Comply with manufacturer's written installation instructions.
B. Install sports netting after other finishing operations, including painting, have been completed
unless otherwise indicated.
C. Install sports netting level, plumb, square, and true; anchored securely to supporting structure;
positioned at locations and elevations indicated; in proper relation to adjacent construction; and
aligned with sport-court layout.
END OF SECTION