HomeMy WebLinkAbout11-68-12-Relocatable-Storage-Container_Rev_1Dennis Yarmouth Intermediate Middle School January 19, 2021
Dennis Yarmouth Regional School District 100% Construction Documents
Perkins Eastman DPC, project #71011
11 68 12 RELOCATABLE STORAGE CONTAINER
1 of 5
Section 11 68 12
RELOCATABLE STORAGE CONTAINER
PART 1 - GENERAL
1.1 SUMMARY
A. Drawings and General Provisions of Contract, including General and Supplementary
Conditions and Division 01 Specification section, apply to work of this section.
B. Related Sections: The following sections contain requirements that relate to this
section.
1. Section 03 30 00 - Cast-in-Place Concrete
2. Section 31 00 00 – Earth Moving
3. Section 32 13 13 – Portland Cement Concrete Pavement
4. Section 01 60 00 - Product Requirements: Listing of Emissions and VOC
requirements.
5. Section 01 74 19 - Construction Waste Management and Disposal: Proce-
dural and administrative requirements for construction and demolition recy-
cling
6. Section 01 81 13 - Sustainable Design Requirements: Special administra-
tive and procedure requirements related to Owner’s LEED v4 for Schools
Building Design + Construction (BD+C) goals of Certification.
7. Section 01 81 13a - LEED v4 Materials Reporting Form: Materials Track-
ing for Building Product Disclosure and Optimization credits
1.2 DESCRIPTION OF WORK
A. Contractor will furnish and install the relocatable storage containers.
B. Contractor to provide crane for lifting the buildings off the delivery truck and placing
units on level concrete pads.
1.3 DESIGN LOAD ITEMS
A. Design load certification and shop drawings stamped by Professional Structural
Engineer including seismic zone, wind loads and snow loads must be confirmed in
writing with local code authorization by Contractor prior to manufacture of the
building.
1.4 WARRANTY
A. Provide Manufacturer’s twenty (20) year warranty against structural failure, material
failure and manufacturing defects covering all levels of warranty for the equipment
and components.
B. Warranty shall spell out what it does not cover.
1.5 QUALITY ASSURANCE
Dennis Yarmouth Intermediate Middle School January 19, 2021
Dennis Yarmouth Regional School District 100% Construction Documents
Perkins Eastman DPC, project #71011
11 68 12 RELOCATABLE STORAGE CONTAINER
2 of 5
A. Manufacturer’s warranties shall pass to the Owner and certification made that the
product materials meet all applicable grade trademarks or conform to industry
standards and inspection requirements.
B. The installation of the Relocatable Storage Unit shall be by Contractor with a
minimum of five (5) years of experience on similar projects, with at least two simi-
lar projects within the last eighteen months. Evidence of this experience shall be
submitted to the Owner’s Representative for review and approval.
1.6 SUBMITTALS
A. Submit shop drawings and product data under provisions of Division 01 for all
manufactured/fabricated items. All submittals must be prior to fabrication and/or
field installation work.
1. Shop drawings shall include plans, details, elevations and specifications
and shall indicate profiles, sizes, dimensions, connection attachments, size
and type of fasteners, accessories, and color and finish as indicated in
these specifications and the plans.
2. Submit manufacturers printed product literature, specifications and data
sheets.
3. Clearly indicate on the shop drawings any deviations from the plans and
specifications.
B. Submit Contractor Qualifications as required under Quality Assurance section
stated herein.
C. Submit warranty information of all manufactured/fabricated items as required under
Warranty section stated herein.
D. Submit samples showing texture, finish and range of colors of all materials.
Samples will establish the standard by which materials provided will be judged.
E. Submit drawings and instructions of manufacturers/fabricators installation
requirements.
F. Submit stamped shop drawings by a Structural Engineer currently registered in the
state where the project is located for footings for all work in this Section. Drawings
shall indicate approved materials in this Section.
G. Submit material test reports from a qualified testing agency indicating and inter-
preting test results for compliance with requirements indicated herein, based on
comprehensive testing of current materials.
H. Submit design load criteria as required under Design Load Items section stated
herein.
I. LEED Submittals:
1. Document FSC Certification for all wood products that contribute to credit
achievement by providing the following:
a. Itemized vendor invoices for FSC-certified products.
b. Chain-of-Custody (COC) certificates. Every entity that
processes or trades FSC-certified material before it is shipped to the
Dennis Yarmouth Intermediate Middle School January 19, 2021
Dennis Yarmouth Regional School District 100% Construction Documents
Perkins Eastman DPC, project #71011
11 68 12 RELOCATABLE STORAGE CONTAINER
3 of 5
project site must have FSC CoC certification. On-site installers of
FSC-certified products must have CoC certification only if they modify
the products off the project site.
2. Complete “LEED Materials Documentation Sheet” with MRc3 Option 2
information for wood products installed in the building.
3. Provide manufacturers’ product documentation that includes recycled con-
tent claims for the products contributing towards compliance. Claims must
conform to the definition in ISO 14021-1999, Environmental Labels and 4.
Declarations, Self-Declared Environmental Claims.
4. Complete "LEED Materials Documentation Sheet" with MRc3 Option 2 in-
formation for products with recycled content installed in the building.
1.7 DELIVERY, STORAGE AND HANDLING
A. All equipment, unless otherwise indicated, shall be furnished, assembled and installed
by the contractor.
B. Deliver to site, store and protect products under provisions of Division 1.
C. Installation Documentation, Packing List and Maintenance Kits shall be supplied by the
manufacturer for each component.
D. Do not store paint, paint additives or cleaners at site.
PART 2 - PRODUCTS
A. Any manufacturer’s names and/or model numbers identified herein are intended to
assist in establishing a general level of quality, configuration, functionality, and
appearance required. This is NOT a proprietary specification and it should be noted
that “Or approved equal” applies to all products denoted herein. It is understood that
all manufactures will have minor variations in configuration, appearance, and product
specifications and such minor variations shall not eliminate such manufacturers as
an approved equal". It is the intent of this specification to encourage open and
competitive involvement from multiple manufacturers that are able to supply similar
products.
B. Relocatable storage building shall be Miller Relocatable Storage Buildings, Rite-
Away by US Door B Building Components, Mini-Storage Outlet Relocatable/Portable
Storage Building system 10’x15’ or equivalent and include but not be limited to the
following items:
1. 24 gauge galvalume plus standing seam roof with fixed clip system and
with gutters and downspouts with 20 year manufacturer’s warranty.
2. Building shall have a standard peak roof 1:12 slope. Color of Roof shall
be Polar White.
3. 26 gauge “R” panel siding with siliconized polyester finish for walls and
blank wall areas. Color shall be Classic Green with a 40 year
manufacturer’s warranty or equal.
Dennis Yarmouth Intermediate Middle School January 19, 2021
Dennis Yarmouth Regional School District 100% Construction Documents
Perkins Eastman DPC, project #71011
11 68 12 RELOCATABLE STORAGE CONTAINER
4 of 5
4. 29 gauge galvalume plus interior partitions designed to provide resistance
to smudging, staining and corrosion.
5. Interior structural steel is red oxide primed.
6. Jambs between exterior doors are 16 gauge galvanized structural steel
covered with pre-painted 26 gauge jamb covers with a 20 year
manufacturer’s warranty.
7. Roof is insulated with ply-foil insulation to help prevent condensation.
8. Eave height shall be 8-’4”.
9. Exterior roll-up door shall be 7’ high x 8’8” wide on 10’ wide units.
10. 26 gauge exterior roll-up door with corrugated door headers. Door colors
shall be Polar White and include a 20 year manufacturer’s paint warranty.
11. Tension control, coil springs, brackets, door stops, slide latch and bottom
bar with rubber astragal and ball-bearings included for all roll up doors.
12. Floor system consists of: (1) 2x4 and 2x6 pressure treated joists covered
with ¾” exterior grade plywood with the exterior edges wrapped in a 16
gauge galvanized steel sill. (2) 16-gauge diamond plate aluminum flooring
over 3” galvanized corrugated steel floor deck.
13. Standard industry latches.
14. Four corner bracket assembly with steel rods for fastening building to the
ground.
15. Eye bolts in all 4 corners for lifting building off of flatbed with crane will be
required.
16. All colors to be approved by the Landscape Architect and the Owner prior
to fabrication.
C. LEED Requirements
1. Wood products that are not reused, salvaged, or recycled must be certified
to the standards of the Forest Stewardship Council.
2. Provide products manufactured and extracted within 100 miles of the pro-
ject site whenever possible.
PART 3 - EXECUTION
3.1 GENERAL
A. Installation shall conform to the lines and dimensions shown on the approved shop
drawings, where applicable, and the contract drawings.
Dennis Yarmouth Intermediate Middle School January 19, 2021
Dennis Yarmouth Regional School District 100% Construction Documents
Perkins Eastman DPC, project #71011
11 68 12 RELOCATABLE STORAGE CONTAINER
5 of 5
B. Field stake locations of structure in conformance with the plans for approval by
Owner’s Representative and the Landscape Architect. Owner’s Representative and
Landscape Architect may make field changes before approving layout at no additional
cost to the Owner.
C. Verify all dimensions in the field and check work by other trades for conformance with
the drawings before proceeding with the work. Report any discrepancies to the Owner
before proceeding.
D. Deliver to the site all items necessary for completion of installation.
E. Storage Unit shall conform to the manufacturers' recommendations for installation
unless otherwise indicated.
F. Secure components in proper alignment and elevation.
G. Protect structure until completely installed and safe for use.
H. Maintenance kit shall be provided to the Owner for each structure and component.
END OF SECTION 11 68 12