Loading...
HomeMy WebLinkAbout21-0800-Fire-Protection-Systems-Commissioning_Rev_1Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 21 0800 Fire Protection Systems Commissioning 1 of 2 SECTION 21 08 00 FIRE PROTECTION SYSTEMS COMMISSIONING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 RELATED SECTIONS A. Division 21 – Fire Suppression B. Division 23 – Heating, Ventilating and Air Conditioning C. Section 019113 – General Commissioning Requirements 1.3 REQUIRMENTS A. The Commissioning process requires the participation of Division 21, Fire Protection, to ensure that all systems fulfill the functional and pre-functional requirements set forth in these construction documents. The general commissioning requirements and coordination are detailed in Section 019113. Division 21, Fire Protection, shall fulfill commissioning responsibilities assigned to division 21 in accordance with Section 019113. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION 3.1 PRE-FUNCTIONAL CHECKLISTS A. Pre-functional checklists assist in the process to document that the equipment and systems are installed properly. B. The contractor will be provided with construction checklists from the CA for completion. The contractor shall complete the checklists as provide the CA with completed copies in accordance with 019113. C. See attached for a sample pre-functional performance test checklist, attached is included only to provide sample of a typical process and scope. 3.2 FUNCTIONAL PERFORMANCE TESTING A. Intent of functional performance testing is to prove thru functional test procedures proper system operation. B. The contractor will be provided with functional performance test procedures to perform while CA witnesses. The contractor shall perform functional tests in accordance with Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 21 0800 Fire Protection Systems Commissioning 2 of 2 019113, requirements of the specification section, code requirements, or requirements of the authority having local jurisdiction. C. See attached for a sample functional performance test checklist, attached is included only to provide sample of a typical process and scope. 3.3 PREFUNCTIONAL CHECKLISTS AND FUNCTIONAL PREFORMANCE TESTING A. Pre-Functional Checklists and Functional performance testing procedures will be performed on the following system types. (Pre Functional and Functional performance testing requirements are in addition to and do not replace any testing required elsewhere in Division 21 or by applicable codes.) Equipment specifically marked as such below shall be provided with start-up of equipment by factory-authorized service representative. 1. Fire Protection System and equipment; fire alarm system interfaces with HVAC systems 3.4 SAMPLE CHECKLISTS A. See Attached. End of Section Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 21 0800 Fire Protection Systems Commissioning 3 of 2 Contractor Checklist and Functional Test Procedures FIRE PROTECTION SYSTEMS Please refer to the Master Deficiency and Resolution Log for numbers referenced in parentheses, which will indicate deficiencies discovered and resolved. 1. Participants Discipline Name Company CxA Mechanical Controls TAB Plumbing Electrical Fire Protection Date Returned to CxA 2. Prerequisite Checklist Check Description ☐ The above equipment and systems integral to them are complete and ready for functional testing. ☐ All control system functions for this and all interlocking systems are programmed and operable per contract documents, including final setpoints and schedules with debugging, loop tuning and sensor calibrations completed. ☐ All A/E punchlist items for this equipment corrected. ☐ Safeties and operating ranges reviewed. ☐ Schedules and reviewed • This checklist does not take the place of the manufacturer’s recommended checkout and startup procedures. • Items that do not apply shall be noted with the reasons on this form (N/A = not applica- ble, BO = by others). • Contractor’s assigned responsibility for sections of the checklist shall be responsible to see that checklist items by their subcontractors are completed and checked off. Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 21 0800 Fire Protection Systems Commissioning 4 of 2 3. Installation Checks Check if Okay. Enter comment or note number if deficient. Check Zone Valves Sealed ☐ Locked ☐ Tamper Switches ☐ Position ☐ Operation ☐ Supervisory ☐ Alarm Valves Pressure gauges ☐ Main drain/test ☐ Trim piping per manufacturer’s instructions ☐ Isolation valve ☐ Backflow Prevention Reduced Pressure Backflow Preventer ☐ Reduced pressure Detectors Assembly ☐ Double Check Valve Assembly ☐ Double Check Detector Assembly ☐ Fire Department Connection Brass Finish ☐ Brass caps and chains ☐ Check valve ☐ Waterflow alarms Tied into fire alarm control panel ☐ Provided at alarm valve riser ☐ Valves, Piping Isolation valves installed per drawings ☐ Pipe fittings complete and pipes properly supported ☐ Pipes properly labeled ☐ Piping system properly flushed ☐ No leaking apparent around fittings ☐ Valves properly labeled ☐ Risers clamps ☐ Test connections Instrumentation installed according to specification (pressure gages, test valves, etc.) ☐ Clean up of equipment completed per contract doc- uments ☐ Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 21 0800 Fire Protection Systems Commissioning 5 of 2 Check if Okay. Enter comment or note number if deficient. Check Inspectors test connections provided at all zones with equivalent sprinkler orifice size ☐ Maintenance access acceptable for components ☐ The checklist items all successfully completed for given trade ☐YES ☐NO 4. Operational Checks Check if Okay. Enter comment or note number if deficient. Check Equip Tag Test Results Functional Y/N Inspectors test valve opened flowing equivalent of one sprinkler, activation of flow switch and automatic activa- tion of alarm at fire alarm control panel at Zone # 1 Inspectors test valve opened flowing equivalent of one sprinkler, activation of flow switch and automatic activa- tion of alarm at fire alarm control panel at Zone # 2 Inspectors test valve opened flowing equivalent of one sprinkler, activation of flow switch and automatic activa- tion of alarm at fire alarm control panel at Zone # 3 Inspectors test valve opened flowing equivalent of one sprinkler, activation of flow switch and automatic activa- tion of alarm at fire alarm control panel at Zone # 4 Activation of tamper switch and automatic activation of alarm at fire alarm control panel at all valve locations The checklist items all successfully completed for given trade ☐YES ☐NO (THIS PAGE IS BLANK)