HomeMy WebLinkAbout22-0800-Plumbing-Systems-Commissioning_Rev_1Dennis Yarmouth Intermediate Middle School January 19, 2021
Dennis Yarmouth Regional School District 100% Construction Documents
Perkins Eastman DPC, project #71011
22 0800 Pluming Systems Commissioning
1 of 2
SECTION 22 08 00
PLUMBING SYSTEMS COMMISSIONING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and General Provisions of the Contract, including General and Supplementary
Conditions and Division 1 Specification Sections, apply to this Section.
1.2 RELATED SECTIONS
A. Division 22 – Plumbing
B. Section 019113 – General Commissioning Requirements
1.3 REQUIRMENTS
A. The Commissioning process requires the participation of Division 22, Plumbing, to ensure
that all systems fulfill the functional and pre-functional requirements set forth in these
construction documents. The general commissioning requirements and coordination are
detailed in Section 019113. Division 22, Plumbing, shall fulfill commissioning
responsibilities assigned to division 22 in accordance with Section 019113.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION
3.1 PRE-FUNCTIONAL CHECKLISTS
A. Pre-functional checklists assist in the process to document that the equipment and
systems are installed properly.
B. The contractor will be provided with construction checklists from the CA for completion.
The contractor shall complete the checklists as provide the CA with completed copies in
accordance with 019113.
C. See attached for a sample pre-functional performance test checklist, attached is included
only to provide sample of a typical process and scope.
3.2 FUNCTIONAL PERFORMANCE TESTING
A. Intent of functional performance testing is to prove thru functional test procedures proper
system operation.
B. The contractor will be provided with functional performance test procedures to perform
while CA witnesses. The contractor shall perform functional tests in accordance with
019113.
Dennis Yarmouth Intermediate Middle School January 19, 2021
Dennis Yarmouth Regional School District 100% Construction Documents
Perkins Eastman DPC, project #71011
22 0800 Pluming Systems Commissioning
2 of 2
C. See attached for a sample functional performance test checklist, attached is included
only to provide sample of a typical process and scope.
3.3 PREFUNCTIONAL CHECKLISTS AND FUNCTIONAL PREFORMANCE TESTING
A. Pre-Functional Checklists and Functional performance testing procedures will be
performed on the following system types. (Pre Functional and Functional performance
testing requirements are in addition to and do not replace any testing required elsewhere
in Division 22 or by applicable codes.) Equipment specifically marked as such below shall
be provided with start-up of equipment by factory-authorized service representative.
1. Domestic Hot Water Heater and Recirculation System
Provide documentation for factory authorized start-up on water heaters.
a) Provide sign off and/or documentation of mixing valve setup and
recirculation system balancing as per the requirements of the contract
documents and or manufacturer’s instructions.
b) Provide sign off and/or documentation of system flushing as per the
requirements of the contract documents.
2. Sinks and Lavatories
3. Water Closets
4. Acid Neutralization System
3.4 SAMPLE CHECKLISTS
A. See Attached.
End of Section
Dennis Yarmouth Intermediate Middle School January 19, 2021
Dennis Yarmouth Regional School District 100% Construction Documents
Perkins Eastman DPC, project #71011
22 0800 Pluming Systems Commissioning
3 of 2
Contractor Checklist and Functional Test Procedures
DOMESTIC WATER HEATER AND RECIRCULATION SYSTEM
Please refer to the Master Deficiency and Resolution Log for numbers referenced in parentheses, which
will indicate deficiencies discovered and resolved.
1. Participants
Discipline Name Company
CxA
Mechanical
Controls
TAB
Plumbing
Electrical
Date Returned to CxA
2. Prerequisite Checklist
Check Description ☐ The above equipment and systems integral to them are complete and ready for functional testing.
☐ All control system functions for this and all interlocking systems are programmed and operable per
contract documents, including final setpoints and schedules with debugging, loop tuning and sensor
calibrations completed. ☐ Test and balance completed and approved for the hydronic systems and terminal units connected ☐ All A/E punchlist items for this equipment corrected. ☐ Safeties and operating ranges reviewed. ☐ Schedules and reviewed
• This checklist does not take the place of the manufacturer’s recommended checkout
and startup procedures.
• Items that do not apply shall be noted with the reasons on this form (N/A = not applica-
ble, BO = by others).
• Contractor’s assigned responsibility for sections of the checklist shall be responsible to
see that checklist items by their subcontractors are completed and checked off.
Dennis Yarmouth Intermediate Middle School January 19, 2021
Dennis Yarmouth Regional School District 100% Construction Documents
Perkins Eastman DPC, project #71011
22 0800 Pluming Systems Commissioning
4 of 2
3. Installation Checks
Check if Okay. Enter comment or note number if deficient.
Domestic HW Sys-
tem
General Installation
Permanent labels affixed ☐
Casing condition good: no dents ☐
Maintenance access acceptable for unit and components valve has been in-stalled where it can be easily, cleaned, adjusted, etc. ☐
Concrete pad provided ☐
Instrumentation installed according to specification (thermometers, pressure gages, flow meters, etc.) ☐
Clean up of equipment completed per contract documents ☐
Main gas, pilot gas pressure regulators, and high and low pressure switches are
vented to the outdoors ☐
Water heater is ASME rated ☐
Piping arrangement installed per the contract documents ☐
Installation of combustion air fan and associated motorized damper ☐
Flue pipe installed as per the contract documents ☐
Valves and Piping
Pipe fittings complete and pipes properly supported ☐
Pipes properly labeled ☐
Pipes properly insulated ☐
Relief valve on water heater properly piped ☐
Valves properly labeled ☐
Valves installed in proper direction ☐
Piping system properly flushed ☐
No leaking apparent around fittings ☐
Cold water make-up isolation valve ☐
Isolation valves installed per drawings ☐
Water heater drain valve ☐
ASME Pressure relief valve ☐
Re-circulation line connection to cold water make-up ☐
Gas connection with plug valve ☐
Gas train to water heater ☐
Sensors calibrated ☐
Electrical and Controls
Power disconnects in place and labeled ☐
All electric connections tight ☐
Safeties in place and operable ☐
Misc.
Aquastat installed on recirculation pumps ☐
Dennis Yarmouth Intermediate Middle School January 19, 2021
Dennis Yarmouth Regional School District 100% Construction Documents
Perkins Eastman DPC, project #71011
22 0800 Pluming Systems Commissioning
5 of 2
Check if Okay. Enter comment or note number if deficient.
Domestic HW Sys-
tem
Recirc pumps in place and service switches in place and labeled ☐
The checklist items all successfully completed for given trade ☐YES ☐NO
4. Functional Testing Record
Test
#
Mode ID
Test Procedure
(including special conditions) Expected Response Pass
Y/N
Not
e
1 Manufacturers
Startup
Procedures performed as per
manufacturers requirements Startup Report attached
2 Operating
control
Set operating controller above
setpoints degrees F. Burner turns on
3 Operating
control
Set operating controller below
setpoints degrees F. Burner turns off
4
Combustion
Fan Interlock
(if applicable)
Simulate a need for the Water
Heater to fire
Ensure that the Combustion Air
fan is energized on and that the
associated motorized damper
operates as intended
5 Recirc Pumps Simulate a call for the domes-
tic water heater
The recirc pumps operate as
needed. Ensure also that the
disconnect switches associated
will turn the pump on/off for ser-
vice.
6
Set-
ting/balancing
the Mixing
Valve
See methods below As listed below
The functional tests have all passed for given trade ☐YES ☐NO
☐ Balancing Procedures have been followed as per manufacturer recommendations per specific manu-
facturer.