HomeMy WebLinkAbout26-0800-Electrical-Systems-Commissioning_Rev_1Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 26 0800 Electrical Systems Commissioning 1 of 2 SECTION 26 08 00 ELECTRICAL SYSTEMS COMMISSIONING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 RELATED SECTIONS A. Division 26 – Electrical B. Section 019113 – General Commissioning Requirements 1.3 REQUIRMENTS A. The Commissioning process requires the participation of Division 26, Electrical, to ensure that all systems fulfill the functional and pre-functional requirements set forth in these construction documents. The general commissioning requirements and coordination are detailed in Section 019113. Division 26, Electrical, shall fulfill commissioning responsibilities assigned to division 26 in accordance with Section 019113. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION 3.1 PRE-FUNCTIONAL CHECKLISTS A. Pre-functional checklists assist in the process to document that the equipment and systems are installed properly. 1) The contractor will be provided with construction checklists from the CA for completion. The contractor shall complete the checklists as provide the CA with completed copies in accordance with 019113. 2) See attached for a sample pre-functional performance test checklist, attached is included only to provide sample of a typical process and scope. 3.2 FUNCTIONAL PERFORMANCE TESTING A. Intent of functional performance testing is to prove thru functional test procedures proper system operation. B. The contractor will be provided with functional performance test procedures to perform while CA witnesses. The contractor shall perform functional tests in accordance with 019113. C. See attached for a sample functional performance test checklist, attached is included only to provide sample of a typical process and scope. Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 26 0800 Electrical Systems Commissioning 2 of 2 3.3 PREFUNCTIONAL CHECKLISTS AND FUNCTIONAL PREFORMANCE TESTING A. Pre-Functional Checklists and Functional performance testing procedures will be performed on the following system types. (Pre Functional and Functional performance testing requirements are in addition to and do not replace any testing required elsewhere in Division 26 or by applicable codes.) Equipment specifically marked as such below shall be provided with start-up of equipment by factory-authorized service representative. 1. Emergency Generator and associated transfer panels (if applicable)-Provide with factory authorized start-up. 2. Lighting Control Systems 3. Electrical Service and switchgear, transformers, motor control centers, distribution systems, low voltage systems, grounding and bonding systems. 3.4 SAMPLE CHECKLISTS A. See Attached. End of Section Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 26 0800 Electrical Systems Commissioning 3 of 2 Contractor Checklist and Functional Test Procedures Lighting Control Systems Please refer to the Master Deficiency and Resolution Log for numbers referenced in parentheses, which will indicate deficiencies discovered and resolved. 1. Participants Discipline Name Company CxA Mechanical Controls TAB Plumbing Electrical Date Returned to CxA Check Description ☐ The above equipment and systems integral to them are complete and ready for functional testing. ☐ All control system functions for this and all interlocking systems are programmed and operable per contract documents, including final setpoints and schedules with debugging, loop tuning and sensor calibrations completed. ☐ Test and balance completed and approved for the hydronic systems and terminal units connected ☐ All A/E punchlist items for this equipment corrected. ☐ Safeties and operating ranges reviewed. Schedules and reviewed • This checklist does not take the place of the manufacturer’s recommended checkout and startup procedures. • Items that do not apply shall be noted with the reasons on this form (N/A = not applicable, BO = by others). • Contractor’s assigned responsibility for sections of the checklist shall be responsible to see that checklist items by their subcontractors are completed and checked off. Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 26 0800 Electrical Systems Commissioning 4 of 2 3. Installation Checks Check if Okay. Enter comment or note number if deficient. Check Equip Tag Light- ing Comments Lighting Devices installed per manufacturer’s instructions and specifi-cations ☐ Lighting control system installed per plans, specifications and manufacturer’s recommendations ☐ Switches and occupancy sensors installed at correct height and have correct cover / escutcheon plate ☐ The checklist items all successfully completed for given trade ☐YES ☐NO 4. Operational Checks Check if Okay. Enter comment or note number if deficient. Check Equip Tag Lighting Comments Operational Lights are all functioning. No bulbs are burned out ☐ Lights are not turning on and off frequently causing a disrup- tions ☐ The checklist items all successfully completed for given trade ☐YES ☐NO 5. Functional Testing Record Lighting Systems The functional tests have all passed for given trade ☐YES ☐NO Test# Mode ID Test Procedure Expected Response Pas s Y/N Not e 1 Interior Lighting – Occupancy Sensors With the room unoccupied and the lights off, enter the space The occupancy sensor shall see you and the lights shall energize on. While in the space, the lights shall not continually turn off and on. 2 Interior Lighting – Daylight Dim- ming With the room occupied, and the lights on, shine a flashlight on the photocell The lights should dim as they sense more light in the space. 3 Exterior Lights On Engage the time clock/photocell function to simulate a need for the exterior lighting. Cover the Photo- cell to simulate darkness and over- ride the time clock to simulate a suitable time to be on All exterior lights should energize on including pole lights, wall packs etc. 4 Exterior Lights Off Set the time clock back to normal schedules and remove the cover- ing from the photocell All exterior lights should turn off in- cluding pole lights, wall packs, etc. 5 Stage / Theatri-cal Lighting Try out all functions of the theatri- cal lighting to ensure that it is working per specification System should operate the theatri- cal lighting as setup in accordance with the owners request