Loading...
HomeMy WebLinkAbout28-0800-Electronic-Safety-And-Security-Systems-Commissioning_Rev_1Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 28 0800 Electronic Safety and Security Systems Commissioning 1 of 2 SECTION 28 08 00 ELECTRONIC SAFETY AND SECURITY SYSTEMS COMMISSIONING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 RELATED SECTIONS A. Division 23 – Heating, Ventilating and Air Conditioning B. Division 28 - Electronic Safety and Security Systems C. Section 019113 - General Commissioning Requirements 1.3 REQUIRMENTS A. The Commissioning process requires the participation of Division 28, Electronic Safety and Security, to ensure that all systems fulfill the functional and pre-functional requirements set forth in these construction documents. The general commissioning requirements and coordination are detailed in Section 019113. Division 28, Electronic Safety and Security, shall fulfill commissioning responsibilities assigned to division 28 in accordance with Section 019113. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION 3.1 PRE-FUNCTIONAL CHECKLISTS A. Pre-functional checklists assist in the process to document that the equipment and systems are installed properly. a. The contractor will be provided with construction checklists from the CA for completion. The contractor shall complete the checklists as provide the CA with completed copies in accordance with 019113. b. See attached for a sample pre-functional performance test checklist, attached is included only to provide sample of a typical process and scope. Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 28 0800 Electronic Safety and Security Systems Commissioning 2 of 2 3.2 FUNCTIONAL PERFORMANCE TESTING A. Intent of functional performance testing is to prove thru functional test procedures proper system operation. B. The contractor will be provided with functional performance test procedures to perform while CA witnesses. The contractor shall perform functional tests in accordance with 019113. C. See attached for a sample functional performance test checklist, attached is included only to provide sample of a typical process and scope. 3.3 PREFUNCTIONAL CHECKLISTS AND FUNCTIONAL PREFORMANCE TESTING A. Pre-Functional Checklists and Functional performance testing procedures will be performed on the following system types. (Pre Functional and Functional performance testing requirements are in addition to and do not replace any testing required elsewhere in Division 28 or by applicable codes.) Equipment specifically marked as such below shall be provided with start-up of equipment by factory-authorized service representative. 1. Fire Alarm Systems 2. Security Systems including review of Card Readers, In 3. Video Surveillance Systems 3.4 SAMPLE CHECKLISTS A. See Attached. End of Section Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 28 0800 Electronic Safety and Security Systems Commissioning 3 of 2 Contractor Checklist and Functional Test Procedures SECURITY SYSTEM - Access Control and Video Surveillance Please refer to the Master Deficiency and Resolution Log for numbers referenced in parenthe- ses, which will indicate deficiencies discovered and resolved. 1. Participants Discipline Name Company CxA Mechanical Controls TAB Plumbing Electrical Date Returned to CxA 2. Prerequisite Checklist Check Description ☐ The above equipment and systems integral to them are complete and ready for functional testing. ☐ All control system functions for this and all interlocking systems are programmed and oper- able per contract documents, including final setpoints and schedules with debugging, loop tuning and sensor calibrations completed. ☐ Test and balance completed and approved for the hydronic systems and terminal units connected ☐ All A/E punchlist items for this equipment corrected. ☐ Safeties and operating ranges reviewed. Schedules and reviewed • This checklist does not take the place of the manufacturer’s recommended checkout and startup procedures. • Items that do not apply shall be noted with the reasons on this form (N/A = not applicable, BO = by others). • Contractor’s assigned responsibility for sections of the checklist shall be respon- sible to see that checklist items by their subcontractors are completed and checked off. Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 28 0800 Electronic Safety and Security Systems Commissioning 4 of 2 3. Installation Checks Check if Okay. Enter comment or note number if deficient. Check Equip Tag-> Comments General Installation Surfaces, coatings, finishes and equipment is without damage ☐ All wiring fastened and tied in an approved workmanship manner ☐ All material and equipment new and unused Entry Access Control System: 3 x 5 Color Video Sentry Tilt System installed ☐ Color Monitor is operational ☐ Audio operational ☐ The checklist items all successfully completed for given trade ☐YES ☐NO 4. Functional Testing Record Test # Mode ID Test Procedure Expected Response Pass Y/N Note 1 Color Video Sen- try Tilt System – Door Intercom With one person outside (at the entry door) and one person inside at the reception area, have the person out- side push the call button The incoming call will sound chime at the reception area. The person inside will pick up to an- swer and the visitor will speak hands free. The person inside will see the person via the cam-era. The person inside will press the door release button which will allow the visitor to enter. 2 Video Surveil- lance At the head end station, ensure that the dome cameras are accurately displaying the area that they are monitoring The display at the head end should continuously show accu- rate information of what is being monitored and also will record the monitored area. 3 Card Readers Using a staff members HID card, pass the card over the HID Card Reader The card shall be accurately read and access will be allowed. The functional tests have all passed for given trade ☐YES ☐NO