Loading...
HomeMy WebLinkAbout33-0513-Manholes-and-Structures_Rev_1Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 33 0513 Manholes and Structures 1 of 10 33 0513 Manholes and Structures PART 1 – GENERAL 1.1 GENERAL PROVISIONS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 01 - GENERAL REQUIREMENTS which are hereby made a part of this Section of the Specifications. B. The General Contractor shall either perform the work of this section with its own forces or shall subcontract such work to a subcontractor who will furnish a performance and payment bond for the complete scope of work and listing the Town of Yarmouth as the co-oblige. Such bond shall be procured from a surety that is currently licensed to do business in Massachusetts and is currently listed on the United States Treasure Department circular 570. A copy of such bond shall be submitted to the Owner’s Project Manager for approval and shall be in place prior to the subcontractor commencing any work on the project. 1.2 DESCRIPTION OF WORK A. Work Included: Provide labor, materials and equipment necessary to complete the work of this Section, including but not limited to the following: 1. Install precast concrete manholes, catch basins, frames and covers, grates, manhole rungs, platforms, and appurtenances all as shown on the Drawings and as specified herein. B. Related Work: The following items are not included in this Section and will be performed under the designated Sections: 1. Section 31 0000 - EARTH MOVING 2. Section 33 4100 - STORM UTILITY DRAINAGE PIPING 3. Section 33 3100 - SANITARY UTILITY SEWERAGE PIPING 4. Provision of waste management: Section 01 7419, Construction of Waste Management Plan. 5. Provision of General LEED requirements and forms: 01 8113 Sustainable Design Requirements. 1.3 REFERENCES A. American Concrete Institute: 1. ACI 318 - Building Code Requirements for Structural Concrete. 2. ACI 530/530.1 - Building Code Requirements for Masonry Structures and Specifications for Masonry Structures. Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 33 0513 Manholes and Structures 2 of 10 B. ASTM International: 1. ASTM A48/A48M - Standard Specification for Gray Iron Castings. 2. ASTM A615 - Standard Specification for Deformed and Plain Billet-Steel Bars for Concrete Reinforcement 3. ASTM C32 - Standard Specification for Sewer and Manhole Brick 4. ASTM C39/C39M - Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens. 5. ASTM C55 - Standard Specification for Concrete Brick. 6. ASTM C62 - Standard Specification for Building Brick (Solid Masonry Units Made From Clay or Shale). 7. ASTM C150 - Standard Specification for Portland Cement 8. ASTM C207 - Standard Specification for Hydrated Lime for Masonry Purposes 9. ASTM C478 - Standard Specification for Precast Reinforced Concrete Manhole Sections. 10. ASTM C497 - Standard Test Methods for Concrete Pipe, Manhole Sections, or Tile. 11. ASTM C913 - Standard Specification for Precast Concrete Water and Wastewater Structures. 12. ASTM C923 - Standard Specification for Resilient Connectors Between Reinforced Concrete Manhole Structures, Pipes, and Laterals. 13. ASTM D4097 - Contact Molded Glass Fiber Reinforced Chemical Resistant Tanks 14. ASTMD4101 - Standard Specification for Propylene Plastic Injection and Extrusion Materials C. American Association of State Highway and Transportation Officials (AASHTO) D. Occupational Safety and Health Administration (OSHA) 1.4 DESIGN REQUIREMENTS A. Equivalent strength: Based on structural design of reinforced concrete as outlined in ACI 318. B. Design of Lifting Devices for Precast Components: In accordance with ASTM C913. C. Design of Joints for Precast Components: In accordance with ASTM C913; maximum leakage of 0.025 gallons per hour per foot of joint at 3 ft. of head. 1.5 SUBMITTALS A. Section 013300 - Submittal Procedures: Requirements for submittals. B. Shop Drawings: Indicate manhole locations, elevations, and sizes and elevations of penetrations. C. Product Data: Submit cover and frame construction, features, configuration, dimensions. Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 33 0513 Manholes and Structures 3 of 10 1.6 QUALITY ASSURANCE A. The quality of all materials, the process of manufacture, and the finished sections shall be subject to inspection and approval by the Engineer or other representative of the Owner. Such inspection may be made at the place of manufacture, or on the work after delivery, or at both places and the materials shall be subject to rejection at any time on account of failure to meet any of the requirements specified herein; even though samples may have been accepted as satisfactory as the place of manufacture. Material reject after delivery to the job shall be marked for identification and shall be removed from the job at one. All materials that have been damaged after delivery shall be rejected, and if already installed, shall be acceptably repaired, if permitted, or removed and replaced, entirely at the Contractor’s expense. B. At the time of inspection, the materials will be carefully examined for compliance with the applicable ASTM standard specification and this Section with the approved manufacturer’s drawings. All manhole sections shall be inspected for general appearance, dimension, scratch strength, blisters, cracks, roughness, soundness, and other surface or structural imperfections. The surface shall be dense and close-textured. C. Imperfections in manhole sections may be repaired, subject to the approval of the Engineer, after demonstration by the manufacturer that strong and permanent repairs result. Repairs shall be carefully inspected before final approval. Cement mortar used for repairs shall have a minimum compressive strength of 4,000 psi at seven days and 5,000 psi at 28 days, when tested in 3 inch x 6 inch cylinders stored in the standard manner. Epoxy mortar may be utilized for repairs subject to the approval of the Engineer. 1.7 QUALIFICATIONS A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years documented experience. 1.8 DELIVERY, STORAGE AND HANDLING A. Section 016 000 - PRODUCT REQUIREMENTS: Product storage and handling requirements. B. Comply with precast concrete manufacturer’s instructions for unloading, storing, and moving precast manholes. C. Store precast concrete manholes to prevent damage to Owner’s property or other public or private property. Repair property damaged from materials storage. D. Mark each precast structure by indentation or waterproof paint showing date of manufacture, manufacturer, and identifying symbols and numbers shown on Drawings to indicate its intended use. 1.9 ENVIRONMENTAL REQUIREMENTS A. Section 016 000 - PRODUCT REQUIREMENTS. B. Maintain materials and surrounding air temperature to minimum 50 degrees F prior to, during, and 48 hours after completion of masonry work. Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 33 0513 Manholes and Structures 4 of 10 C. Cold Weather Requirements: ACI 530. PART 2 - PRODUCTS 2.1 PRECAST CONCRETE MANHOLE SECTIONS A. Precast concrete barrel sections and transition top sections shall conform to ASTM C478 and meet the following requirements: 1. Manholes shall have a minimum 48 inch interior diameter with a wall thickness of not less than 5 inch. 2. Top sections shall be eccentric except that barrel sections shall be used where shallow pipe cover requires a top section less than 4 feet. 3. Barrel sections shall have tongue and groove joints. Manholes shall be manufactured in the configuration shown on the Drawings with the bell of the manhole section pointing down. 4. All sections shall be cured by an approved method and shall not be shipped or subjected to loading until the concrete compressive strength has attained 3,000 psi and not before five days after fabrication or repair, whichever is longer. 5. Precast concrete barrel sections with top slabs and precast concrete transition sections shall be designed for a minimum of HS-20 loading plus the weight of the soil above at 120 pcf. 6. The date of manufacture and the name and trademark of the manufacturer shall be clearly marked on the inside of each precast section. 7. Precast concrete bases shall be constructed of and installed as shown on the Drawings. The thickness of the bottom slab of precast bases shall not be less than the manhole barrel sections or top slab, whichever is greater. 8. Knockout panels shall not be permitted. 2.2 CATCH BASINS A. Precast reinforced concrete catch basin sections shall conform to the applicable requirements of ASTM C478, latest revision. B. Basin shall be precast reinforced concrete 4 feet in diameter with penetrations cast into the basin for pipe connection; knockout panels shall not be permitted. Basins shall have a minimum wall thickness of 5 inch and a minimum bottom thickness of 6 inches. Basins shall have a sump of 4 feet. Top sections shall be a flat slab and have a minimum of 8 inches for support of cast iron frame and grate. The hole in the top section shall be 24 inches square size to accommodate frame and cover and be eccentric. The hole in the top section shall be located over the side opposite to the hooded outlet to facilitate future cleaning operations. C. All concrete shall have a minimum compressive strength of 4,000 psi and a live load design base for all catch basins shall be HS-20 loading. D. All catch basins shall be fitted with a hooded outlet. The hoods are to be positioned so they will not interfere with future cleaning operations. The hooded outlet cover shall be fabricated from marine grade fiberglass, stainless steel (18-8) attachment hardware, pressure sensitive oil resistant foam rubber gasket, PVC Schedule 40 fittings, and pipe for anti-siphon device. Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 33 0513 Manholes and Structures 5 of 10 E. Bedding material under catch basins and drain manholes shall conform to the requirements for of the Specifications for pipe bedding. A minimum of 12 inches of 3/4“ crushed stone is required to provide a uniform base. If the material at the elevation that catch basins are to be set on is not suitable to support them, then this material shall be removed to a depth that will support the structure. The material approved by the Engineer shall be used to replace the removed material and be compacted before setting the base. F. Catch basin frames and grates/covers shall be set at a finished elevation 1 inch below finish pavement elevation. 2.3 BRICK MASONRY A. The bricks shall be good, sound, hard and uniformly burned, regular and uniform in shape, of compact size and texture and satisfactory to the Engineer. Underburned or salmon brick will not be acceptable and only whole brick shall be used unless otherwise permitted. In case bricks are rejected by the Engineer, they shall be immediately removed from the site of the work and satisfactory bricks used thereafter. 1. Bricks for the channels and sleeves shall comply with ASTM C32 for sewer brick; Grade SS (from clay or shale) except that the mean of five tests for absorption shall not exceed 8% and no individual brick shall exceed 11%. 2. Bricks for building up and leveling the manhole frames shall comply with ASTM C62. B. Mortar used in the brickwork shall be composed of one part Type II Portland cement conforming to ASTM C150 and sand to which a small amount of hydrated lime not to exceed 10 lbs to each bag of cement shall be added. C. The sand used shall be washed, cleaned, screened, sharp and well graded as to different sizes and with no grain larger than will pass a No. 4 sieve. It shall be free from vegetable matter, loam, organic or other materials of such nature or quantity to render it unsatisfactory. D. The hydrated lime shall also conform to ASTM C207. 2.4 FRAMES, COVERS AND GRATES A. Manufacturers: 1. All manufacturers producing such products shall be considered. 2. Substitutions: Section 01 6000 - PRODUCT REQUIREMENTS. B. Manhole frames and covers shall be of good quality, strong, tough, even grained cast iron, smooth, free from scale, lumps, blisters, sand holes and defects of any kind that render them unfit for the service for which they are intended. Manhole covers and frame seats shall be machined to a true surface. Castings shall be thoroughly cleaned and subject to hammer inspection. Cast iron shall conform to ASTM A48, Class 30. C. Manhole covers shall have a diamond pattern, pick holes, and the word ‘SEWER’, DRAIN', or as appropriate, cast in 3 in. letters. D. Inlet frames and grates shall be of good quality, strong, tough, even grained cast iron, smooth, free from scale, lumps, blisters, sand holes and defects of any kind that render them unfit for the Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 33 0513 Manholes and Structures 6 of 10 service for which they are intended. Catch basin grates and frame seats shall be machined to a true surface. Castings shall be thoroughly cleaned and subject to hammer inspection. Cast iron shall conform to ASTM A48, Class 30. E. Grates, if located in a walking area, shall have spaces no greater than 1/2 inch wide in one direction. If gratings have elongated openings, then they shall be placed so that the long dimension is perpendicular to the dominant direction of travel. 2.5 JOINTING PRECAST MANHOLE SECTIONS A. Tongue and groove joints shall be sealed with either a round rubber o-ring gasket or a preformed flexible joint sealant. The o-ring shall conform to ASTM C443. B. Joints shall be designed and manufactured so that the completed joint will withstand an internal water pressure of 15 psi without leakage or displacement of the gasket or sealant. 2.6 MANHOLE RUNGS A. Manhole rungs shall conform to the requirements of ASTM C478 and be of the following types: 1. Manhole rungs shall be steel reinforced copolymer polypropylene plastic. Rungs shall be 14 inches wide. Copolymer polypropylene shall conform to ASTM D4101. Steel reinforcing shall be 1/2 inch diameter, grade 60 conforming to ASTM A615 and shall be continuous throughout the rung. The portion of the legs to be embedded in the precast section shall have fins and be tapered to insure a secure bond. 2.7 PIPE CONNECTION TO MANHOLE A. Manhole pipe connections may be accomplished in the following ways: 1. The ‘Lock Joint Flexible Manhole Sleeve’ shall be cast in the precast manhole base. The steel strap shall be protected from corrosion with a bituminous coat. 2. ‘A-Lok’ shall be a rubber like gasket cast in the precast manhole base. The rubber gasket shall be case into a formed opening in the manhole. 3. ‘Kor-N-Seal’ joint shall be installed as recommended by the manufacturer. The stainless steel clamp shall be protected from corrosion with a bituminous coat. B. Clear Cover Opening: 24 inch diameter, or as otherwise indicated on Drawings. C. Steps: 12 inch wide, 16 inch on center vertically, set into manhole, or as otherwise indicated on Drawings. 2.8 DAMPPROOFING A. The dampproofing shall be Hydrocide 648 by Sonneborn Building Products, Dehydratine by A.C. Horn, Inc., Meadows Trowel Mastic, or approved equal. Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 33 0513 Manholes and Structures 7 of 10 2.9 CONFIGURATION A. Shaft Construction: Concentric with eccentric cone top section; lipped male/female joints; sleeved to receive pipe sections. B. Shape: Cylindrical. C. Clear Inside Dimensions: 48 inches, or as otherwise indicated on Drawings. D. Design Depth: As indicated on Drawings. E. Clear Cover Opening: 24 inch diameter, or as otherwise indicated on Drawings. F. Steps: 12 inch wide, 16 inch on center vertically, set into manhole, or as otherwise indicated on Drawings. 2.10 BEDDING MATERIALS A. Bedding and Cover: 3/4 inch Crushed Stone in accordance with Section M2.01.4 of the MHD Standard Specifications. B. Soil Backfill from Around Manhole: In pavement areas where controlled density fill is not specified, provide Ordinary Fill to the sub-base of the pavement, and then provide the required sub-base material for the pavement section. In grassed areas where controlled density fill is not specified, provide Ordinary Fill to a point 6 inches below finished grade, then Manufactured Topsoils to finished grade. PART 3 - EXECUTION 3.1 EXAMINATION A. Verify items provided by other sections of Work are properly sized and located. B. Verify built-in items are in proper location, and ready for roughing into Work. C. Verify correct size of manhole excavation. 3.2 PREPARATION A. Coordinate placement of inlet and outlet pipe or duct sleeves required by other sections. B. Do not install structures where site conditions induce loads exceeding structural capacity of structures. C. Inspect precast concrete structures immediately prior to placement in excavation to verify structures are internally clean and free from damage. Remove and replace damaged units. Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 33 0513 Manholes and Structures 8 of 10 3.3 INSTALLATION A. Excavation and Backfill: 1. Excavate for manholes to location and depth shown in accordance with Section 31 0000 - EARTHWORK and as otherwise specified herein. Provide clearance around sidewalls of structure for construction operations. 2. When groundwater is encountered, prevent accumulation of water in excavations. Place manholes in dry trench. 3. Where possibility exists of watertight structure becoming buoyant in flooded excavation, anchor structure to avoid flotation. B. Place base pad, trowel top surface level. C. Install manholes supported at proper grade and alignment on crushed stone bedding as shown on Drawings. D. Backfill and compact excavations for manholes in accordance with Section 31 0000 - EARTHWORK. E. Form and place manhole cylinder plumb and level, to correct dimensions and elevations. F. Cut and fit for sleeves. G. Grout base of shaft sections to achieve slope to exit piping. Trowel smooth. Contour to form continuous drainage channel, as indicated on Drawings. H. Set cover frames and covers level without tipping, to correct elevations. I. Coordinate with other sections of Work to provide correct size, shape, and location. 3.4 PRECAST CONCRETE INSTALLATION A. Lift precast components at lifting points designated by manufacturer. B. When lowering precast structures into excavations and joining pipe to units, take precautions to ensure interior of pipeline and structure remains clean. C. Set precast structures bearing firmly and fully on crushed stone bedding, compacted in accordance with State of MHD specifications. D. Assemble multi-section structures by lowering each section into excavation. Lower, set level, and firmly position base section before placing additional sections. E. Remove foreign materials from joint surfaces and verify sealing materials are placed properly. Maintain alignment between sections by using guide devices affixed to lower section. F. Joint sealing materials may be installed on site or at manufacturer’s plant. G. Verify installations satisfy required alignment and grade. Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 33 0513 Manholes and Structures 9 of 10 H. Cut structure to receive piping without creating openings larger than required to receive pipe. Fill annular space with mortar. I. Cut pipe to finish flush with interior of structure. J. Shape inverts through manhole as shown on Drawings. 3.5 FRAME AND COVER INSTALLATION A. Set frames using mortar and masonry. Install radially laid sewer brick with 1/4 inch thick vertical joints at inside perimeter. Lay sewer brick in full bed of mortar and completely fill joints. Where more than one course of sewer brick is required, stagger vertical joints. No more than three courses of sewer brick shall be permitted. B. Set frame and cover 2 inches above finished grade for manholes with covers located within unpaved areas to allow area to be graded away from cover beginning 1 inch below top surface of frame. 3.6 FIELD QUALITY CONTROL A. Sections 01 4000 - QUALITY REQUIREMENTS, 016000 - PRODUCT REQUIREMENTS and 01 7700 - CLOSEOUT PROCEDURES. B. Vertical Adjustment of Existing Manholes: 1. Where required, adjust top elevation of existing manholes to finished grades shown on Drawings. 2. Reset existing frames, grates and covers, carefully removed, cleaned of mortar fragments, to required elevation in accordance with requirements specified for installation of castings. 3. Remove concrete without damaging existing vertical reinforcing bars when removal of existing concrete wall is required. Clean vertical bars of concrete and bend into new concrete top slab or splice to required vertical reinforcement, as indicated Drawings. 3.7 LEAKAGE TESTS A. Leakage tests shall be made and observed by the Engineer on each manhole. The test shall be as described below: B. Vacuum Test (required on all new manholes): 1. The test shall be made using an inflatable compression band, vacuum pump, and appurtenances specifically designed for testing manholes. Test procedures shall be in accordance with the equipment manufacturer’s recommendations. Contactor shall be fully familiar with the vacuum testing equipment and provide a minimum of four hours of instruction by a factory authorized representative at the outset of the project. 2. Each manhole shall be test immediately after assembly including the connection of pipes and prior to backfilling. 3. All lift holes shall be plugged with non-shrink grout and all pipes entering the manhole shall be plugged and braced to prevent the plug from being drawn into the manhole. Dennis Yarmouth Intermediate Middle School January 19, 2021 Dennis Yarmouth Regional School District 100% Construction Documents Perkins Eastman DPC, project #71011 33 0513 Manholes and Structures 10 of 10 4. After test equipment is in place the test shall be run at the following rate and test times: a. For 4 foot diameter manholes: 1) Initial test pressure – 10 inches Hg 2) Test Time – 1 inch Hg drop to 9 inches Hg in one minute allowable for 0 feet to 10 feet deep manholes. b. If the pressure drop exceeds 1 inch Hg in the specified time the manhole shall be repaired in accordance with approved procedures and retested. c. If a manhole fails to meet a 1 inch Hg drop in the specified time after repairs the unit shall be water exfiltration tested as specified below and repaired as necessary. C. Exfiltration Test (required as described above): 1. Assemble manhole in place; fill and point all lifting holes and exterior joints within 6 feet of the ground surface with an approved non-shrinking mortar. Test prior to placing the shelf and invert before filling and pointing the horizontal joints below 6 feet of depth. Lower groundwater table below bottom of manhole for the duration of the test. Plug all pipes and other openings into the manhole and brace to prevent blowout. 2. Fill manhole with water to the top of the cone section. If the excavation has not been backfilled and no water in observed moving down the surface of the manhole, the manhole is satisfactorily watertight. If the test, as described above is unsatisfactory to the Engineer, or if the manhole excavation has been backfilled, continue the test. A period of time may be permitted to allow for absorption. Following this period, refill manhole to the top of the cone, if necessary, and allow at least eight hours to pass. At the end of the test period, refill the manhole to the top of the cone again, measuring the volume of water added. Extrapolate the refill amount to a 24 hour leakage rate. If the manhole fails this requirement, but the leakage does not exceed three gallons per vertical foot per day, repairs by approved methods may be as directed by the Engineer. If leakage due to a defective joint exceeds this amount, the manhole shall be rejected. Uncover the rejected manhole as necessary to disassemble, reconstruct, or replace it as directed by the Engineer. Retest the manhole, and if satisfactory, fill and point the interior joints. 3. No adjustment in the leakage allowance may be made for unknown causes such as leaking plugs, absorptions, or other. It will be assumed that all loss of water during the test is a result of leaks through the joints or through the entrance. 4. An infiltration test may not be substituted for an exfiltration test if the groundwater table is above the highest joint in the manhole. If there is no leakage into the manhole as determined by the Engineer, the manhole will be considered watertight. If the Engineer is not satisfied, testing shall be performed as described herein. 3.8 CLEANING A. All new manholes shall be thoroughly cleaned of all silt, debris, and foreign matter of any kind, prior to final inspection. END SECTION