Loading...
HomeMy WebLinkAboutSeptic As-Built CardNAME: HIGH VENT 24.8' _ PRESBY BED WITH 5 ENVIRO-SEPTIC LINES AT 30' EACH (9'W X 321 SAND BED AND 150' OF PIPE) 1000 GALLON H-20 MONOLITHIC PUMP CHAMBER 176 H-1500 GALLON ® 20 MONOLITHIC SEPTIC TANK 3 0 20._ AO 30.9' SEPTIC SYSTEM AS -BUILT SITE: 41 HEATHER LANE YARMOUTH, MASSACHUSETTS BILL BACHANT BUILDERS 9 TYLER AVENUE EAST WAREHAM, MA 02538 Engineering Heather VENT EX. DWELLING 2 -BEDROOM TOF=100.66 INSP. r m 21.5' -© vl.. 19te-1Nt 11 LOT AREA 12.501± S.F. 0.287± ACRES (NO WETLANDS) EX. WATER SERVICE (APPROX.) 014 1 4 *NFS PAVED DRIVE JLL 13 2ud HEALTH D=P_T. SCOTT WAY DRAWN BY- GRAPHICS SCALE WBC 1 inch = 20 feet DESIGNED BY- 0 20 40 60 WBC CHECKED NB - I DATE: 7-9-21 1APPROVED I PROJECT I S SEPTIC CZ AS -BUILT As Built — 41 Heather Lane — Yarmouth.dwa DESCRIPTION OP OF FOUNDATION " INV. OUT OF HOUSE SWING TIE SWING TIE SWING WI IGHUt1NU WAIFN I V1.0 i V1.0 I i 1 Z N07EL Q 1. WATER PURIFICATION SYSTEM'S BACKWASH SHALL BE PROHIBITED FROM DISCHARGING INTO 49 THE SEPTIC TANK AND SHALL DISCHARGE TO A DRYWELL OR TO THE GROUND IN ACCORDANCE WITH 310 CMR 15.004 (8). THE BACKWASH IS NOT TO BE DISCHARGED INTO OR IN THE DIRECTION OF THE SEPTIC SYSTEM. 2. THE SEPTIC SYSTEM OWNER SHALL HAVE THE SEPTIC TANK AND OUTLET FILTER W INSPECTED ANNUALLY AND CLEANED AND PUMPED AS NECESSARY. W 3. OPEN HOLE INSPECTION PERFORMED BY YARMOUTH BOARD OF HEALTH. Fm I HEREBY CERTIFY THAT THE SUBSURFACE DISPOSAL SYSTEM HAS BEEN CONSTRUCTED IN a COMPLIANCE WITH 310 CMR 15.000, THE APPROVED DESIGN PLANS AND ALL LOCAL REQUIREMENTS AND THAT ANY CHANGES TO THE DESIGN PLANS HAVE BEEN REFLECTED ON W THE AS -BUILT WHICH IS HEREBY BEING SUBMITTED TO THE YARMOUTH BOARD OF HEALTH. OT NYLES ZAGER, P.E. DATE CE Y ZENITH CONSULTING ENGINEERS, LLC 3 MAIN STREET LAKEVILLE, MA 02347 PHONE: (508) 947-4208