Loading...
HomeMy WebLinkAboutMassDEP file number Grant, Kelly From:SERO_NOI@MassMail.state.ma.us Sent:Wednesday, July 21, 2021 1:13 PM To:andrew.poyant@mass.gov; michael.t@talbotecolandcare.com Cc:sero_noi@state.ma.us; Grant, Kelly; Hudson, Heidi; sero_noi@state.ma.us Subject:MassDEP NOI File Number Attention! This email originates outside of the organization. Do not open attachments or click links unless you are sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure. Otherwise delete this email. COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF ENERGY & ENVIRONMENTAL AFFAIRS DEPARTMENT OF ENVIRONMENTAL PROTECTION SOUTHEAST REGIONAL OFFICE 20 RIVERSIDE DRIVE, LAKEVILLE, MA 02347 508-946-2700 Date: 07/21/2021 Municipality YARMOUTH RE: NOTIFICATION OF WETLANDS PROTECTION ACT FILE NUMBER The Department of Environmental Protection has received a Notice of Intent filed in accordance with the Wetlands Protection Act (M.G.L. c. 131, §40): MARYJO/HOWARD Applicant SAFFORD Owner 92 JUNIPER RIDGE Address DRIVE,FEEDING HILLS MA Address 310 SOUTH SHORE DRIVE , Locus YARMOUTH MA This project has been assigned the following file # : SE 083-2291 ISSUANCE OF A FILE NUMBER INDICATES ONLY COMPLETENESS OF SUBMITTAL, NOT APPROVAL OF APPLICATION Although a file # is being issued, please note the following: The applicant is not proposing planting or seeding within Bordering Vegetated Wetlands. The work area within BVW should be monitored for compliance with 310 CMR 10.55(4)(b)2. "the ground water and surface elevation of the replacement area shall be approximately equal to that of the lost area;" and 310 CMR 10.55(4)(b)6. "at least 75% of the surface of the replacement area shall be reestablished with indigenous wetland plant species within two growing seasons..." and planting and seeding should occur if this performance standard is not met. General Condition 17 of the Order of Conditions states, "Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary 1 markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission." Regards, for MassDEP, (508)-946-2845 Andrew.Poyant@mass.gov 2