Loading...
HomeMy WebLinkAboutA-R01_Rebar shopsAccepted: Date Due: Date Issued: Date Returned: Substitution: Review Status: Project ID: Submittal No: Title: Owner: Construction Team: Design Team: Submittal Types: Trades/Disciplines: Category: Subcontractor / MFG: Yarmouth New DPW Yarmouth New DPW05/06/2020 Weston & Sampson 04/06/2020 04/06/2020 N/A Structural Reinforcing Steel - For Record Reinforcing Steel - For RecordShop Drawings, Submittal Dat Nguyen 03 21 00-0002-02 03 21 00-0002-02Environmental Partners GVW Inc. [(pending) Project Admin (Design) - James Barron ] [(pending) Reviewer - Kevin Connolly ] [(pending) Reviewer - Abby Cory ] [04/06/2020 Project Admin (Contractor) - Dat Nguyen ] For Record #3BARSIZETOP BARSOTHER BARSCASE 1CASE 2CASE 1CASE 2LAPCLASS #4 #5 #6 #7 #8 #9 #10 #11 #14 #18ABABABABABABABABABN/AN/A4,000 psi LAP CHART19"24"28"36"15"19"22"28"105"139"157"209"81"107"121"161"25"32"37"48"19"25"29"37"31"40"47"60"24"31"36"47"37"48"56"72"29"37"43"56"54"70"81"106"42"54"63"81"62"80"93"121"48"62"71"93"70"91"105"136"54"70"81"105"79"102"118"153"61"79"91"118"87"113"131"170"67"87"101"131"DETAILED AT:PAWTUCKETRHODE ISLANDALL REINFORCING IS TO BE PLACED INACCORDANCE WITH CONCRETEREINFORCING STEEL INSTITUTE (CRSI)MANUAL OF STANDARD PRACTICE.ENG. AND ARCH. PLEASE VERIFY ALL CLOUDED AREASU.N.O.ALL MATERIAL ON THIS DRAWINGSHALL BE ASTM A615 GRADE 60AND ENGINEERS DRAWINGSUSE THIS DRAWING INCONJUNCTION WITH ARCHITECTS