HomeMy WebLinkAboutJ5951 Dennis Yarmouth Middle School WE 2021-07-16Summary Report #7 July 19, 2021 Job No: 5951 Job Name:Dennis Yarmouth Middle School 296 Station Ave South Yarmouth, MA 02664 Application No.: TESTING INSPECTION ENGINEERING EM 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York July 12, 2021 Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. No Samples Taken. See attached. Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed reinforcing steel placement inspection. See attached. Billy Coughlin picked up (5) concrete cylinders from the jobsite. The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. July 13, 2021 Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed concrete placement and sampling inspection. Concrete sample(s) obtained: (5) per set, (1) set(s), (5) total. See attached. Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. No Samples Taken. See attached. The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. July 14, 2021 Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. No Samples Taken. See attached. Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed reinforcing steel placement inspection. See attached. The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. July 15, 2021 Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed concrete placement and sampling inspection. Concrete sample(s) obtained: (5) per set, (1) set(s), (5) total. See attached. TESTING INSPECTION ENGINEERING EM 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. No Samples Taken. See attached. Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed reinforcing steel placement inspection. See attached. Billy Coughlin picked up (5) concrete cylinders from the jobsite. The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. July 16, 2021 Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed concrete placement and sampling inspection. Concrete sample(s) obtained: (5) per set, (1) set(s), (5) total. See attached. Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. No Samples Taken. See attached. The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Laboratory test results are enclosed if testing was done during the period covered by this report. Limitations: These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Reviewed by: Enea Mushi Project Manager 07-21-2021 Date Technical Contact: Jonathan Felts, Vice President (jfelts@fenaghengineering.com) Administrative Contact: Gina Salerno (gsalerno@fenaghengineering.com) TESTING INSPECTION ENGINEERING Soils Compaction FET Project #: 5951 Project Name: Dennis Yarmouth Middle School TAA #: NA Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Arsene Ntwali July 12, 2021 Time In: 07:00 Time Out: 15:00 Weather: Sunny Temperature: 79°F Plans Dated: 03/23/2021 Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Arsene Ntwali Inspector 07-12-2021 Date Enea Mushi Project Manager 07-21-2021 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Proof roller, Excavator , Dozer. No samples taken. Density Std (DS): 2530 Moisture Std (MS): 471 Specified Compaction: 95% Soils Report prepared by: Fenagh Engineering Source of Fill: Native: General Location of Fill: CULTEC 4 Nuclear Gauge: Humbolt HS-5001EZ 5200 calibration expiration date 09/2021 Soils Report Dated: 06-07-2021 Results Reported to: Mitch Miller Equipment Observed: Compaction: Proof roller Excavation: Excavator Earthwork: Dozer Description of material Reference CurveID Lab Log ID Max Dry Density(pcf)Optimum Moisture Loose glacial 1 S774 115.8 10 Test#Test Location Probe Depth (in) Test Elev. (ft) Ref. Curve Used Test Dry Density (lbs/cu. ft.) Test Moisture (%) Compaction (95%) (%) Comments 1 CULTEC 4 6 22 1 110.2 6.0 95 Pass 2 COLTEC 4 6 23 1 110.8 6.5 96 Pass TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Arsene Ntwali Inspection Type: Reinforcing Steel Placement Pg. 1 of 1 July 12, 2021 Time In: 08:00 Time Out: 12:00 Weather: Sunny Temperature: 79°F Permit No. : Plans Dated: 06/09/2021 Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Arsene Ntwali Inspector 07-12-2021 Date Enea Mushi Project Manager 07-19-2021 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of reinforcing steel for L1 footings at B/d4-d23, d17-d25/A, A-B/d25. Work complete. Reference detail Sheet R005. Reinforcing Steel and Anchor Bolts Y N Y N Rebar Installed Per Approved Details ✓General Notes And Typical Details Reviewed ✓ Rebar The Proper Size ✓Rebar The Proper Type/grade ✓ Rebar Spacing Acceptable ✓Min Clearances Achieved Around Rebar ✓ Min Lap Splice Lengths Achieved ✓Additional Required Rebar Has Been Placed ✓ Coupler/t-heads Torque Tested If Applicable ✓Coupler/t-heads Placed Per Approved Details If Applicable ✓ Rebar Testing Complete And Passed If Required ✓ Daily Pick Up Report Job Number: Project Name: Fenagh Representative: Date: Cylinders Shotcrete Grout Mortar Grout Cubes Prisms PT Cables Fireproofing Samples Soil Samples Rebar Samples Steel Plates Other Additional Comments: Job Site Shop Batch Plant/Quarry Other: ________ Cure Box Temp: ______ High/Low Temp: ________ Outside Temp: ______ TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Arsene Ntwali Inspection Type: Concrete Placement and Sampling Pg. 1 of 1 July 13, 2021 Time In: 07:00 Time Out: 09:00 Weather: Sunny Temperature: 84°F Permit No. : Plans Dated: 05/19/2021 Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Arsene Ntwali Inspector 07-13-2021 Date Enea Mushi Project Manager 07-19-2021 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of and performed sampling of concrete for Foundation, footings at B/d4-d23, d17-d25/A (mix no. 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5%, and 33 cubic yards placed). Monitored loads for mix no., slump, temp., and time limit. Prepared 4x8" cylinder test specimens sampled from TRUCK DISCHARGE. Set No. Slump (in.) Mix Temp. (°F) Air Temp. (°F) Air Content (%) Unit Weight (pcf) Truck No.Location Qty. of Samples Batch Time Sample Time Subcontractor Ticket No. 1 5.25 73 66 4.5 144.3 53 B/d4 5 7:35 AM 8:25 AM Marguerite 3097 5 5 Total Referenced Details: Mix Design 3500D-3/4 Design Concrete TESTING INSPECTION ENGINEERING Soils Compaction FET Project #: 5951 Project Name: Dennis Yarmouth Middle School TAA #: NA Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Arsene Ntwali July 13, 2021 Time In: 09:00 Time Out: 15:00 Weather: Sunny Temperature: 84°F Plans Dated: 03/26/2021 Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Arsene Ntwali Inspector 07-13-2021 Date Enea Mushi Project Manager 07-21-2021 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Proof roller, excavator , Dozer. No samples taken. Density Std (DS): 2534 Moisture Std (MS): 475 Specified Compaction: 95% Soils Report prepared by: Fenagh Engineering Source of Fill: Native: General Location of Fill: CULTEC 4 Nuclear Gauge: Humbolt HS-5001EZ 5200 calibration expiration date 09/2021 Soils Report Dated: 06-07-2021 Results Reported to: Mitch Miller Equipment Observed: Compaction: Proof roller Excavation: excavator Earthwork: Dozer Description of material Reference CurveID Lab Log ID Max Dry Density(pcf)Optimum Moisture Hardner 1 TBD 120.4 8.4 Test#Test Location Probe Depth (in) Test Elev. (ft) Ref. Curve Used Test Dry Density (lbs/cu. ft.) Test Moisture (%) Compaction (95%) (%) Comments 1 Parking lot 6 22 1 116.6 5.7 97 Pass 2 Parking lot 6 23 1 115.3 6.0 96 Pass Additional Notes: Hardner material lab log ID not provided. Proctor number provided by Mitch Miller with PMA. TESTING INSPECTION ENGINEERING Soils Compaction FET Project #: 5951 Project Name: Dennis Yarmouth Middle School TAA #: NA Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Arsene Ntwali July 14, 2021 Time In: 07:00 Time Out: 15:00 Weather: Sunny Temperature: 83°F Plans Dated: 06/07/2021 Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Arsene Ntwali Inspector 07-14-2021 Date Enea Mushi Project Manager 07-21-2021 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Proof roller, excavator , Dozer. No samples taken. Density Std (DS): 2530 Moisture Std (MS): 472 Specified Compaction: 95% Soils Report prepared by: Fenagh Engineering Source of Fill: Native: General Location of Fill: East access road by UGI 5 Nuclear Gauge: Humbolt HS-5001EZ 5200 calibration expiration date 09/2021 Soils Report Dated: 06-07-2021 Results Reported to: Mitch Miller Equipment Observed: Compaction: Proof roller Excavation: excavator Earthwork: Dozer Description of material Reference CurveID Lab Log ID Max Dry Density(pcf)Optimum Moisture Loose Glacial 1 S774 115.8 10 Test#Test Location Probe Depth (in) Test Elev. (ft) Ref. Curve Used Test Dry Density (lbs/cu. ft.) Test Moisture (%) Compaction (95%) (%) Comments 1 East access road 6 24 1 110.5 6.5 95 Pass 2 East access road 6 25 1 111.4 5.9 96 Pass TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Arsene Ntwali Inspection Type: Reinforcing Steel Placement Pg. 1 of 1 July 14, 2021 Time In: 07:00 Time Out: 14:00 Weather: Sunny Temperature: 83°F Permit No. : Plans Dated: 06/09/2021 Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Arsene Ntwali Inspector 07-14-2021 Date Enea Mushi Project Manager 07-19-2021 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of reinforcing steel for L1 footings at C/d4-d23, d4-d17/A,B-D/d25. Work complete. Reference detail Sheet R005, R006. Reinforcing Steel and Anchor Bolts Y N Y N Rebar Installed Per Approved Details ✓General Notes And Typical Details Reviewed ✓ Rebar The Proper Size ✓Rebar The Proper Type/grade ✓ Rebar Spacing Acceptable ✓Min Clearances Achieved Around Rebar ✓ Min Lap Splice Lengths Achieved ✓Additional Required Rebar Has Been Placed ✓ Coupler/t-heads Torque Tested If Applicable ✓Coupler/t-heads Placed Per Approved Details If Applicable ✓ Rebar Testing Complete And Passed If Required ✓ TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Arsene Ntwali Inspection Type: Concrete Placement and Sampling Pg. 1 of 1 July 15, 2021 Time In: 12:00 Time Out: 15:00 Weather: Sunny Temperature: 76°F Permit No. : Plans Dated: 05/19/2021 Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Arsene Ntwali Inspector 07-15-2021 Date Enea Mushi Project Manager 07-19-2021 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of and performed sampling of concrete for Foundation, Wal, footings at d2-d17/A, B-C/d25 (mix no. 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5%, and 33 cubic yards placed). Monitored loads for mix no., slump, temp., and time limit. Prepared 4x8" cylinder test specimens sampled from TRUCK DISCHARGE. Set No. Slump (in.) Mix Temp. (°F) Air Temp. (°F) Air Content (%) Unit Weight (pcf) Truck No.Location Qty. of Samples Batch Time Sample Time Subcontractor Ticket No. 1 5 72 76 5.6 145.2 67 d6/A 5 12:00 PM 12:40 PM Marguerite 3102 3 5 Total Referenced Details: Mix Design 3500D-3/4 Design Concrete TESTING INSPECTION ENGINEERING Soils Compaction FET Project #: 5951 Project Name: Dennis Yarmouth Middle School TAA #: NA Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Arsene Ntwali July 15, 2021 Time In: 07:00 Time Out: 12:00 Weather: Sunny Temperature: 76°F Plans Dated: 06/07/2021 Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Arsene Ntwali Inspector 07-15-2021 Date Enea Mushi Project Manager 07-21-2021 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Proof roller, excavator , Dozer. No samples taken. Density Std (DS): 2533 Moisture Std (MS): 471 Specified Compaction: 95% Soils Report prepared by: Fenagh Engineering Source of Fill: Native: General Location of Fill: East access road by UGI 7 Nuclear Gauge: Humbolt HS-5001EZ 5200 calibration expiration date 09/2021 Soils Report Dated: 06-07-2021 Results Reported to: Mitch Miller Equipment Observed: Compaction: Proof roller Excavation: excavator Earthwork: Dozer Description of material Reference CurveID Lab Log ID Max Dry Density(pcf)Optimum Moisture Loose Glacial 1 S774 115.8 10 Test#Test Location Probe Depth (in) Test Elev. (ft) Ref. Curve Used Test Dry Density (lbs/cu. ft.) Test Moisture (%) Compaction (95%) (%) Comments 1 East access road 6 23 1 110.9 6.0 96 Pass 2 East access road 6 23 1 111.8 6.3 97 Pass TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Arsene Ntwali Inspection Type: Reinforcing Steel Placement Pg. 1 of 1 July 15, 2021 Time In: 14:00 Time Out: 15:00 Weather: Sunny Temperature: 76°F Permit No. : Plans Dated: 06/09/2021 Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Arsene Ntwali Inspector 07-15-2021 Date Enea Mushi Project Manager 07-19-2021 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of reinforcing steel for L1 footings at d3-d22/C, d3-d22/B, d2-d4/A, A-D/d1, d1-d3/D. Work complete. Reference detail Sheet R005, R006. Reinforcing Steel and Anchor Bolts Y N Y N Rebar Installed Per Approved Details ✓General Notes And Typical Details Reviewed ✓ Rebar The Proper Size ✓Rebar The Proper Type/grade ✓ Rebar Spacing Acceptable ✓Min Clearances Achieved Around Rebar ✓ Min Lap Splice Lengths Achieved ✓Additional Required Rebar Has Been Placed ✓ Coupler/t-heads Torque Tested If Applicable ✓Coupler/t-heads Placed Per Approved Details If Applicable ✓ Rebar Testing Complete And Passed If Required ✓ Daily Pick Up Report Job Number: Project Name: Fenagh Representative: Date: Cylinders Shotcrete Grout Mortar Grout Cubes Prisms PT Cables Fireproofing Samples Soil Samples Rebar Samples Steel Plates Other Additional Comments: Job Site Shop Batch Plant/Quarry Other: ________ Cure Box Temp: ______ High/Low Temp: ________ Outside Temp: ______ Dennis-Yarmouth MS 5951 Billy Coughlin 07/15/2021 n 65 65 5 Also picked up Nuke gauge NA TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Arsene Ntwali Inspection Type: Concrete Placement and Sampling Pg. 1 of 1 July 16, 2021 Time In: 07:00 Time Out: 10:00 Weather: Sunny Temperature: 80°F Permit No. : Plans Dated: 05/19/2021 Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Arsene Ntwali Inspector 07-16-2021 Date Enea Mushi Project Manager 07-19-2021 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of and performed sampling of concrete for Foundation, footings at d3-d22/C, d3-d22/B, d2-d4/A, A-D/d1, d1-d3/D (mix no. 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5%, and 55 cubic yards placed). Monitored loads for mix no., slump, temp., and time limit. Prepared 4x8" cylinder test specimens sampled from TRUCK DISCHARGE. Set No. Slump (in.) Mix Temp. (°F) Air Temp. (°F) Air Content (%) Unit Weight (pcf) Truck No.Location Qty. of Samples Batch Time Sample Time Subcontractor Ticket No. 1 4.5 70 79 5.3 144.4 67 d15/B 5 7:42 AM 8:20 AM Marguerite 3103 5 5 Total Referenced Details: Mix Design 3500D-3/4 Design Concrete TESTING INSPECTION ENGINEERING Soils Compaction FET Project #: 5951 Project Name: Dennis Yarmouth Middle School TAA #: NA Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Arsene Ntwali July 16, 2021 Time In: 09:00 Time Out: 15:00 Weather: Sunny Temperature: 80°F Plans Dated: 03/26/2021 Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Arsene Ntwali Inspector 07-16-2021 Date Enea Mushi Project Manager 07-21-2021 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Proof roller, excavator , Dozer. No samples taken. Density Std (DS): 2532 Moisture Std (MS): 474 Specified Compaction: 95% Soils Report prepared by: Fenagh Engineering Source of Fill: Native: Import: General Location of Fill: East access road by UGI 7, Electric communication line Nuclear Gauge: Humbolt HS-5001EZ 5200 calibration expiration date 09/2021 Soils Report Dated: 06-07-2021 Results Reported to: Mitch Miller Equipment Observed: Compaction: Proof roller Excavation: excavator Earthwork: Dozer Description of material Reference CurveID Lab Log ID Max Dry Density(pcf)Optimum Moisture Loose Glacial 1 S774 115.8 10 Recycled Concrete 2 C-122a 123.5 11.5 Test#Test Location Probe Depth (in) Test Elev. (ft) Ref. Curve Used Test Dry Density (lbs/cu. ft.) Test Moisture (%) Compaction (95%) (%) Comments 1 Electric line 6 21 1 110.6 6.6 96 Pass 2 Electric line 6 22 1 111.2 6.9 96 Pass 3 East access road 6 23 2 118.9 6.4 96 Pass 4 East access road 6 23 2 118.3 6.0 96 Pass