HomeMy WebLinkAboutJ5951 Dennis Yarmouth Middle School WE 2021-07-23_compressedSummary Report #8
July 26, 2021
Job No: 5951
Job Name:Dennis Yarmouth Middle School
296 Station Ave
South Yarmouth, MA 02664
Application No.:
TESTING
INSPECTION
ENGINEERING
EM
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
July 19, 2021
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed concrete placement and sampling inspection. Concrete sample(s)
obtained: (5) per set, (1) set(s), (5) total. See attached.
Arsene Ntwali performed observation of earthwork activities. No Samples Taken. See attached.
Arsene Ntwali performed reinforcing steel placement inspection. See attached.
The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of
workmanship.
July 20, 2021
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. No Samples Taken. See attached.
Arsene Ntwali performed reinforcing steel placement inspection. See attached.
The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of
workmanship.
July 21, 2021
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed concrete placement and sampling inspection. Concrete sample(s)
obtained: (5) per set, (1) set(s), (5) total. See attached.
Arsene Ntwali performed soils compaction testing. No Samples Taken. See attached.
The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of
workmanship.
Billy Coughlin picked up (5) concrete cylinders from the jobsite.
July 22, 2021
TESTING
INSPECTION
ENGINEERING
EM
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. No Samples Taken. See attached.
The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of
workmanship.
July 23, 2021
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed concrete placement and sampling inspection. Concrete sample(s)
obtained: (5) per set, (1) set(s), (5) total. See attached.
Arsene Ntwali performed soils compaction testing. No Samples Taken. See attached.
The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of
workmanship.
Laboratory test results are enclosed if testing was done during the period covered by this report.
Limitations: These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as
acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the
code.
Reviewed by:
Enea Mushi
Project Manager
07-29-2021
Date
Technical Contact: Jonathan Felts, Vice President (jfelts@fenaghengineering.com)
Administrative Contact: Andrew Kelley (akelley@fenaghengineering.com)
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
Inspection Type: Concrete Placement and Sampling
Pg. 1 of 1
July 19, 2021
Time In: 07:00 Time Out: 15:00
Weather: Sunny
Temperature: 77°F
Permit No. :
Plans Dated: 05/19/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
07-19-2021
Date Enea Mushi
Project Manager
07-26-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of and performed sampling of concrete for
Level 1, wall(s) at A/d17-d23, C-D/d24, d24-d20/D, D-C116 (mix no. 3500D, design strength of 3500 psi at 28 days, specified slump
from 4 to 6 in., specified air content from 4.5% to 7.5%, and 55 cubic yards placed). Monitored loads for mix no., slump, temp., and
time limit. Prepared 4x8" cylinder test specimens sampled from TRUCK DISCHARGE.
Set
No.
Slump
(in.)
Mix
Temp.
(°F)
Air Temp.
(°F)
Air Content
(%)
Unit Weight
(pcf)
Truck
No.Location Qty. of
Samples Batch Time Sample Time Subcontractor Ticket
No.
1 4.5 68 77 5.9 144.0 67 d15/B 5 11:59 AM 12:47 PM Marguerite 3107
3
5 Total
Referenced Details: Mix Design 3500D-3/4 Design Concrete
TESTING
INSPECTION
ENGINEERING
Soils Observation
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: NA
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
July 19, 2021
Time In: 07:00 Time Out: 15:00
Weather: Sunny
Temperature: 77°F
Permit No. :
Plans Dated: 03/26/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
07-19-2021
Date Enea Mushi
Project Manager
07-28-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed observation of earthwork activities. No samples taken.
Additional Notes: Observed earthwork activities of drainage systems on Cultec 1 and 3.
Excavator used to dig the underground for the installation of the drainage pipes.
Observed placement of stones underneath and around the pipes.
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
Inspection Type: Reinforcing Steel Placement
Pg. 1 of 1
July 19, 2021
Time In: 07:00 Time Out: 11:00
Weather: Sunny
Temperature: 77°F
Permit No. :
Plans Dated: 06/09/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
07-19-2021
Date Enea Mushi
Project Manager
07-26-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of reinforcing steel for L1 footings at
A/d17-d23, C-D/d24, d24-d20/D, D-C116. Work complete. Reference detail Sheet R005, R006.
Reinforcing Steel and Anchor Bolts
Y N Y N
Rebar Installed Per Approved Details ✓General Notes And Typical Details Reviewed ✓
Rebar The Proper Size ✓Rebar The Proper Type/grade ✓
Rebar Spacing Acceptable ✓Min Clearances Achieved Around Rebar ✓
Min Lap Splice Lengths Achieved ✓Additional Required Rebar Has Been Placed ✓
Coupler/t-heads Torque Tested If Applicable ✓Coupler/t-heads Placed Per Approved Details If Applicable ✓
Rebar Testing Complete And Passed If Required ✓
TESTING
INSPECTION
ENGINEERING
Soils Compaction
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: NA
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
July 20, 2021
Time In: 07:00 Time Out: 15:00
Weather: Sunny
Temperature: 82°F
Permit No. :
Plans Dated: 03/26/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
07-20-2021
Date Enea Mushi
Project Manager
07-26-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Proof
roller, excavator , Dozer. No samples taken.
Density Std (DS):
2532
Moisture Std (MS):
474
Specified Compaction:
95%
Soils Report prepared by:
Fenagh Engineering
Source of Fill:
Native:
Import:
General Location of Fill:
UGI 1, 3
Nuclear Gauge:
Humbolt HS-5001EZ 5200
calibration expiration date 09/2021
Soils Report Dated:
06-07-2021
Results Reported to:
Mitch Miller
Equipment Observed:
Compaction: Proof roller
Excavation: excavator
Earthwork: Dozer
Description of material Reference CurveID Lab Log ID Max Dry Density(pcf)Optimum Moisture
Loose Glacial 1 S774 115.8 10
Test#Test Location
Probe
Depth
(in)
Test
Elev. (ft)
Ref.
Curve
Used
Test Dry Density
(lbs/cu. ft.)
Test Moisture
(%)
Compaction
(95%)
(%)
Comments
1 UGI 1 6 23 1 110.0 4.5 95 Pass
2 UGI 1 6 23 1 111.6 4.8 96 Pass
3 UGI 1 6 24 1 111.4 4.7 96 Pass
4 UGI 1 6 24 1 112.0 5.2 97 Pass
5 UGI 3 6 21 1 110.8 5.0 96 Pass
6 UGI 3 6 22 1 111.1 5.3 96 Pass
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
Inspection Type: Reinforcing Steel Placement
Pg. 1 of 1
July 20, 2021
Time In: 07:00 Time Out: 15:00
Weather: Sunny
Temperature: 82°F
Permit No. :
Plans Dated: 06/09/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
07-20-2021
Date Enea Mushi
Project Manager
07-26-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of reinforcing steel for L1 footings at
D/d3-d5, C/d3-d22, d23-d25/A, A-D/d25. Work complete. Reference detail Sheet R005, R006.
Reinforcing Steel and Anchor Bolts
Y N Y N
Rebar Installed Per Approved Details ✓General Notes And Typical Details Reviewed ✓
Rebar The Proper Size ✓Rebar The Proper Type/grade ✓
Rebar Spacing Acceptable ✓Min Clearances Achieved Around Rebar ✓
Min Lap Splice Lengths Achieved ✓Additional Required Rebar Has Been Placed ✓
Coupler/t-heads Torque Tested If Applicable ✓Coupler/t-heads Placed Per Approved Details If Applicable ✓
Rebar Testing Complete And Passed If Required ✓
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
Inspection Type: Concrete Placement and Sampling
Pg. 1 of 1
July 21, 2021
Time In: 07:00 Time Out: 09:00
Weather: Sunny
Temperature: 77°F
Permit No. :
Plans Dated: 05/19/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
07-21-2021
Date Enea Mushi
Project Manager
07-26-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of and performed sampling of concrete for
Level 1, wall(s) at D/d3-d5, C/d3-d22, d23-d25/A, A-D/25 (mix no. 3500D, design strength of 3500 psi at 28 days, specified slump
from 4 to 6 in., specified air content from 4.5% to 7.5%, and 33 cubic yards placed). Monitored loads for mix no., slump, temp., and
time limit. Prepared 4x8" cylinder test specimens sampled from TRUCK DISCHARGE.
Set
No.
Slump
(in.)
Mix
Temp.
(°F)
Air Temp.
(°F)
Air Content
(%)
Unit Weight
(pcf)
Truck
No.Location Qty. of
Samples Batch Time Sample Time Subcontractor Ticket
No.
1 6 70 77 5.5 144.8 73 C/d3 5 7:29 AM 8:25 AM Marguerite 3109
7
5 Total
Additional Notes: Footings: D/d3-d5rnPiers: C/d3-d22rnwall: d23-d25/A, A-D/d25
Referenced Details: Mix Design 3500D-3/4 Design Concrete
TESTING
INSPECTION
ENGINEERING
Soils Compaction
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: NA
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
July 21, 2021
Time In: 09:00 Time Out: 15:00
Weather: Sunny
Temperature: 77°F
Permit No. :
Plans Dated: 03/26/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
07-21-2021
Date Enea Mushi
Project Manager
07-26-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Proof
roller, excavator , Dozer. No samples taken.
Density Std (DS):
2544
Moisture Std (MS):
470
Specified Compaction:
95%
Soils Report prepared by:
Fenagh Engineering
Source of Fill:
Native:
Import:
General Location of Fill:
DMH 23, UGI 1
Nuclear Gauge:
Humbolt HS-5001EZ 5200
calibration expiration date 09/2021
Soils Report Dated:
06-07-2021
Results Reported to:
Mitch Miller
Equipment Observed:
Compaction: Proof roller
Excavation: excavator
Earthwork: Dozer
Description of material Reference CurveID Lab Log ID Max Dry Density(pcf)Optimum Moisture
Loose Glacial 1 S774 115.8 10
Test#Test Location Probe
Depth (in)
Test
Elev. (ft)
Ref.
Curve
Used
Test Dry Density
(lbs/cu. ft.)
Test Moisture
(%)
Compaction
(95%)
(%)
Comments
1 DMH 23 6 23 1 110.9 4.4 96 Pass
2 UGI 1 6 23 1 111.2 5.3 96 Pass
Daily Pick Up Report
Job Number: Project Name:
Fenagh Representative: Date:
Cylinders
Shotcrete
Grout
Mortar
Grout Cubes
Prisms
PT Cables
Fireproofing Samples
Soil Samples
Rebar Samples
Steel Plates
Other
Additional Comments:
Job Site Shop Batch Plant/Quarry Other: ________
Cure Box Temp: ______ High/Low Temp: ________ Outside Temp: ______
Dennis-Yarmouth MS 5951
Billy Coughlin 07/21/2021
n
NA 75
5
Met AN@CSH for samples. Also picked up Nuke gauge.
NA
TESTING
INSPECTION
ENGINEERING
Soils Compaction
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: NA
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
July 22, 2021
Time In: 07:00 Time Out: 15:00
Weather: Sunny
Temperature: 83°F
Permit No. :
Plans Dated: 03/26/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
07-22-2021
Date Enea Mushi
Project Manager
07-26-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Proof
roller, excavator , Dozer. No samples taken.
Density Std (DS):
2538
Moisture Std (MS):
467
Specified Compaction:
95%
Soils Report prepared by:
Fenagh Engineering
Source of Fill:
Native:
Import:
General Location of Fill:
DMH 24
Nuclear Gauge:
Humbolt HS-5001EZ 5200
calibration expiration date 09/2021
Soils Report Dated:
06-07-2021
Results Reported to:
Mitch Miller
Equipment Observed:
Compaction: Proof roller
Excavation: excavator
Earthwork: Dozer
Description of material Reference CurveID Lab Log ID Max Dry Density(pcf)Optimum Moisture
Loose Glacial 1 S774 115.8 10
Test#Test Location Probe
Depth (in)
Test
Elev. (ft)
Ref.
Curve
Used
Test Dry Density
(lbs/cu. ft.)
Test Moisture
(%)
Compaction
(95%)
(%)
Comments
1 DMH 24 6 23 1 111.3 4.9 96 Pass
2 DMH 24 6 24 1 111.6 5.1 96 Pass
Additional Notes: DMH: Double Manhole
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
Inspection Type: Concrete Placement and Sampling
Pg. 1 of 1
July 23, 2021
Time In: 07:00 Time Out: 15:00
Weather: Sunny
Temperature: 73°F
Permit No. :
Plans Dated: 05/19/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
07-23-2021
Date Enea Mushi
Project Manager
07-26-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of and performed sampling of concrete for
Level 1, wall(s) at d4-d2/A, A-D/d1, d1-d3/D, D/d18, d14-d9/D, D-JJ/d9, c4-c12/F, c4-c12/G (mix no. 3500D, design strength of 3500
psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5%, and 33 cubic yards placed). Monitored loads
for mix no., slump, temp., and time limit. Prepared 4x8" cylinder test specimens sampled from TRUCK DISCHARGE.
Set
No.
Slump
(in.)
Mix
Temp.
(°F)
Air Temp.
(°F)
Air Content
(%)
Unit Weight
(pcf)
Truck
No.Location Qty. of
Samples Batch Time Sample Time Subcontractor Ticket
No.
1 6 68 73 5.6 144.5 73 D/d3 5 6:40 AM 7:40 AM Marguerite 3113
2
5 Total
Additional Notes: Building D:rnFooting: D/d18, d14-d9/D, D-JJ/d9, wall:d4-d2/A, A-D/d1, d1-d3/DrnWall:d4-d2/A, A-D/d1, d1-
d3/DrnBuilding C:rnSpread Footings:c4-c12/F, c4-c12/G
Referenced Details: Mix Design 3500D-3/4 Design Concrete
TESTING
INSPECTION
ENGINEERING
Soils Compaction
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: NA
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
July 23, 2021
Time In: 09:00 Time Out: 15:00
Weather: Sunny
Temperature: 73°F
Permit No. :
Plans Dated: 03/26/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
07-23-2021
Date Enea Mushi
Project Manager
07-26-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Sheep's
foot BMP8500, excavator , Dozer. No samples taken.
Density Std (DS):
2544
Moisture Std (MS):
470
Specified Compaction:
95%
Soils Report prepared by:
Fenagh Engineering
Source of Fill:
Native:
Import:
General Location of Fill:
DMH 23, UGI 1
Nuclear Gauge:
Humbolt HS-5001EZ 5200
calibration expiration date 09/2021
Soils Report Dated:
06-07-2021
Results Reported to:
Mitch Miller
Equipment Observed:
Compaction: Sheep's foot BMP8500
Excavation: excavator
Earthwork: Dozer
Description of material Reference CurveID Lab Log ID Max Dry Density(pcf)Optimum Moisture
Loose Glacial 1 S774 115.8 10
Test#Test Location Probe
Depth (in)
Test
Elev. (ft)
Ref.
Curve
Used
Test Dry Density
(lbs/cu. ft.)
Test Moisture
(%)
Compaction
(95%)
(%)
Comments
1 DMH 23 6 19 1 110.5 5.7 95 Pass
2 DMH 23 6 24 1 110.4 5.0 95 Pass
NCR ID#Date Location Inspector Issue RFI/ Submittal
No.Resolved? (Y/N)Sub/ Contractor Date Resolved Comment
EOR to Advise
00/00/2021
7 day break Set 1 = psi
00/00/2021
28 day break
Set 1 = psi
Legend:
Status: Closed
Status: Open
TESTING
INSPECTION
ENGINEERING
Field Number: 5 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Appl No:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 07/21/2021
Client: PMA
Date of Sampling: 07/09/2021 Lab Log No.: 15185 (2528C)
Reviewed by: Henry Soares
07/21/2021
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: 3500D Supplier: Cape Cod Mix Contractor: Marguerite
Set: 1 of 1 Truck #: 83 Design Strength (psi): 3,500 @28 days Ticket#: 169176
Sample Material/Shape: 4x8 Cylinders Type of Structure: Footings
Location: Onsite
Location for overall pour: Foundation Footings at d2-d19
Location when sampled: D4
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF):70 50-90 Slump or Spread (in.):5.5 4-6 Unit Wt (#cu ft):144.2 140-150
Air Temperature (ºF):72 >40 Air Content (%):5.0 4.5-7.5 Time Sampled:11:10 AM
Aggregate Size (in):3/4 N/A Batch Time:10:11 AM Time in Truck:59 minutes
Information supplied by Laboratory Technician
Date Received: 07/12/2021 Technician that received: Billy Coughlin
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 07/16/2021 Max Nabulsi 4.00 8.00 12.57 Lab 36,938 2,940 Type 2
B 28 08/06/2021 4.00 8.00 12.57 Lab
C 28 08/06/2021 4.00 8.00 12.57 Lab
D 28 08/06/2021 4.00 8.00 12.57 Lab
E H H 4.00 8.00 12.57 Lab
Remarks: Received Sample Condition: Acceptable and/or Satisfactory