Loading...
HomeMy WebLinkAboutBuilding Plans4-1')'-A" FLOOR SCALE:1 /4"= PLAN 1'�_ INDICATES NEW WALL CONSTRUCTION CO CARBON MONOXIDE DETECTOR WALL CABINETS 4" BACKSPLASH COUNTERTOP LAUNDRY SCALE: 172- '717-5 DOOR SCHEDULE SYMBOL Manufacturer Model DOOR SIZE NOTES WIDTH HEIGHT 01 -- -- 1'-6" 6'-8" N 02 -- -- 2'-4" 6'-8" -- 03 F M -- 2'-4" W -- a INSECT SCREEN (FULL HEIGHT) @ EACH OPERABLE WINDOW. ZU) �z Q z LAUNDRY SCALE: 172- '717-5 DOOR SCHEDULE SYMBOL Manufacturer Model DOOR SIZE NOTES WIDTH HEIGHT 01 -- -- 1'-6" 6'-8" -- 02 -- -- 2'-4" 6'-8" -- 03 -- -- 2'-4" 6'-8" -- INSECT SCREEN (FULL HEIGHT) @ EACH OPERABLE WINDOW. ZU) �z Q z WINDOW SCHEDULE No Manufacturer Model TYPE SIZE NOTES WIDTH R.O. HEIGHT R.O. 1 ANDERSEN CN 12 CASEMENT 1'-8 1/2" 2'-0 5/8" WINDOW IN SHOWER TO BE TEMPERED 2 VELUX VSCO1 SKYLT 21 26" -- 6. PROVIDE "TRUSCREEN" INSECT SCREEN (FULL HEIGHT) @ EACH OPERABLE WINDOW. NOTES: 1. GRILLE PATTERNS ARE AS SHOWN VINYL SNAP IN GRILLES 2. ALL WINDOWS ARE ANDERSEN,ILT WASH 400 SERIES -WHITE W/ PRE FINISHED INTERIORS 3. ALL WINDOWS TO HAVE (1) - STANDARD SASH LOCK & KEEPER WHITE FINISH 4. ALL WINDOWS TO HAVE (1)- CONTEMPORARY SASH LIFT WHITE FINISH 5. CONTRACTOR TO VERIFY ROUGH OPENING ON WINDOW SCHEDULE PRIOR TO ROUGH FRAMING. 6. PROVIDE "TRUSCREEN" INSECT SCREEN (FULL HEIGHT) @ EACH OPERABLE WINDOW. STAMP: M O O N I 0 I 00 0 LO a 0 U)0 Ld U Q (n j J otf Lit LiJ (n ZU) �z Q z x wp _ o mC,() m� �0a� W U z Q W C-) Q U� 0 = W � I - z � O W� 0 = 0 z CD 0 Q O W � 7�; r,19 F- W 0 Z U� F__ TI TLE: FLOOR PLAN DATE ISSUED: 08/23/2020 REVISIONS: 12/19/2020 DRAWN BY: PROJECT #: DRAWING NO.: FRONT ELEVATI O SCALE: 1/4"= l - 0 M r Mr-\ CLC VH I I U I N SCALE :1 /4 =1 -0 FULL LENGTH SHEAR PANELS PER WCFM 130 WINDLOAD GUIDE. PERIMETER NAILS= 8d 0 6" O.C. FIELD= 8d @ 12" O.C. 33%x12'-4"=4'-1" REQUIRED SHEAR WALL SCHEDULE PER WFCM 130 MPH EXPOSURE B WIDTH = 12'-4" LENGTH = 17'-0" ASPECT RATIO (L/W) =< 1.00 WIDTH - PER TABLE 10 33� FOR 71, g SHEATHING W/8d COMMON NAILS LENGTH PER TABLE 11 337, FOR 71,SHEATHING W/8d COMMON NAILS RS, SIDING, ROOF FNG RIGHT SIDE SCALE: 1/4"=1'-0" ATIO LEFT SIDE SCALE: 1 /4 =1 - C PERIMETER NAILS= 8d 0 6" O.C. FIELD= 8d Q 12" O.C. ATION 337o'x17'-0"=5'-8" REQUIRED J I AM[-': M O O N I O cD 00 O Lo 2 n W O U (n O W W U Q V) < -J ry W W Ui W Cy < z � o�xo o _ mV) mLLJ n �0 a� W U z W 0 < 0 W Cy I- z � 0 L1J C O z CD F--- < — C < z �� � W - 0 �- Co W C Z TI TLE: FLOOR PLAN ELEVATIONS DATE ISSUED: 08/23/2( REVISIONS: 12/19 2020 DRAWN BY: PROJECT #: DRAWING NO.: 01ITI IK1P rw WAI 1 C PIER PLAN SCALE: 1/4 =1 -o i I i I I I I I I I I I I I I I I I I i M rG, .. O N x N a 1 3'-0" DBL 200 -F-"' � AT END WALL DBL 2x10 CONT 200 RIM JST,—" 0 J W CD J J uv 0) r x n I M C�—L00R FMING PLAN CALE:1 /4 =1 - 0 OPTION: FRAME FLOOR AND GLUE AND NAIL PT 1x2 TO UNDERSIDE OF JOISTS PRIOR TO PLACING AND ATTACHING TO SUPPORT BEAMS FLOORINSULATION DETAIL SCALE: 1 1 /2"=1'-0" LOOK CONSTRUCTION /4" T & G PLYWD SUBFLOOR LUED & NAILED OVER 00's @ 16" O.C. 30 INSULATION PT SHEATHING _UE & NAIL TO (2 PT 1x2 CONTINUOUS AT BOTTOM OF ALL JOISTS STAMP: M O O N 1 O c� 1 00 O Lo a 0 I\ cn o W U Q cf) j I ry W W cn Zcf) �Z Q Z �-71 xo _ o m� mLii V) a� W U z L1J D CIS Z W 0 � 1— Q Z Q Z O Ld Z TITLE: PIER PLAN Oc FLOOR FRAMING PLAN DATE ISSUED: 08/23/2020 REVISIONS: 12/19/2020 DRAWN BY: PROJECT #: DRAWING NO.: A3 110 MM EKPOSURE BWND ZONE GENERAL NAUNG SCHEDULE *Corrosion resistant 11 gage roofing nailaand 16 gage staplesare permitted, checklBC foraddkionairequirements. Nails - Unless otherMsee stated, sues given for nails are common wire sines, Box and pnuematic nails of equiveelent diameter and equal or greater length to the specified nails maybe substitutued unlessothennriw prohibited. PROVIDE SOLID BLOCKING @ 48" 0. C. DBL � AROUI ROOF REMOV FLUSH 2-1 J' FLUSH CLG. E ROOF FRAMING PLA J SCALE: 1 /4"-1'-0" APPLY SIMPSON RIDGE STRAPS AT EA. RAFTER TO RAFTER 1 J"x11 J" LVL RIDGE BM 2x6 @ 16" O.C. COLLAR TIES ALUM. GUTTERS ON FASCIA BDS TO MATCH EX. 1x SOFFIT TO MATCH EX. w/CON'T VINYL SOFFIT VENT O X I W o U ilk Nk H a 1" SYROFOAM i CONT. AT RIM 2x4 @ 16" O.C. UP TIGHT TO UNDERSIDE OF RIDGE BM. ­'W� - FURR OUT_x RAFTERS FOR INSUL. FLOOR CONSTRUCTION 3/4" T & G PLYWD SUBFLOOR GLUED & NAILED OVER 2x10's @ 16" O.C. R30 INSULATION " PT PLYWOOD BETWEEN JSTS. SEE DETAIL A CROSS SECTION SCALE:1 /4"= 1 -0 TYPICAL ROOF CONSTRUCTION ASPHALT SHINGLES ON TRI -FLEX UNDERLAYMENT ON 1/2" ZIP PLYWD. PROP -A -VENT BAFFLE AT SLOPED CLG. S 2x10 RAFTERS @ 16" O.C. W/ SIMPSON H2.5A CLIPS @ 16" O.C. (R-49) INSULATION TYPICAL WALL CONSTRUCTION W.C. SHINGLES ON TYVEK HOUSEWRAP 1/2" ZIP PLYWOOD 2x6 STUDS @ 16" O.C. R21 INSULATION 1/2" GWB. -PTD. SIMPSON ANGLE CLIP AT EA. FLOOR JOIST TO BM 3 -PT 1 J"x9 1" LVL W/SIMPSON HOLD DOW AT SONOTUBES 12" DIA. CONIC. SONOTUBES ON "BIGFOOT FTG"-TYP C r 0Ld C U I Cr LTJ LTJ r" ZV) Q C)� XL 0 m LLJ O L U r) U , LLJ 0 Z LLJ O � I- O z 0 f --- r-) _ Q 0 LL1 Number of Number of BDx D Joint Description Common Nails Nails Nail acin 0ry _ Fbof Framing Blocking to Rafter (Toe -nailed) 2-8d 2-10d each end Rim Board to Rater (End -nailed) 2-16d 3-13d each end Wall Framing Tap Plates at Intersections (Face -nailed) Elud to Sud (Face -nailed) 4-16d 2-16d 5-16d 2-16d at ;pints 24" o.c. Headerto Ibader(Face-nailed} 16d 16d 16" o.c. along edge Poor Framing Joist to 80, Top Plate or Grider (Toe -nailed) 4-8d 4-10d per joist Flocking to Joist (Toe -nailed) 2-8d 2-1Od each end Blackleg to 31 or Top Plate (foe -nailed) 3-16d 4-16d each block Ledger trip to Beam or Grider (Face -nailed) Joist on Ledgerto Beam (Toe -nailed) 3-16d 3-8d 4-16d 3-10d each joist perjoist Band Joist to Joist (End -nailed} 3-16d 4-16d per joist Band Joist to 90 orTop Plate (Toe -nailed) 2-16d 3-16d per#oot Rbof Sheathing VV1bod Structural Pane rafters or trusses spaced up to 16" o.c. 8d 10d 6" edge / 6" field rafters or trusses spaced over 16" o.c. 8d 1 O 4" edge / 4" field gable endwali rake or rake trusswfo gable overhang gable endwali rake or rake trussw/structural outlookers gable endwall rake or rake trussw/lookout blocks 8d 8d 8d 10d 10d 10d 6" edge / 6" field 6" edge / 6" field 4" edge / 4" field Ceiling Sheathing Gypsum Wallboard 5 d coolers - 7" edge / 10" field V1+all Sheathing Wood aructural Panels studs spaced up to 24" o.c. 1/2" and 25/32" Fiberboard Panels 8d 8d* 10d - 6" edge / 12" field Sedge / 6" field 1/2" Gypsum Wallboard 5d coolers - 7" edge 110" field Noor Sheathing Mod Structural Panels 1" or less 8d 1 O 6" edge / 12" field greaterthan 1" 1 O 16d 6" edge / 6" field *Corrosion resistant 11 gage roofing nailaand 16 gage staplesare permitted, checklBC foraddkionairequirements. Nails - Unless otherMsee stated, sues given for nails are common wire sines, Box and pnuematic nails of equiveelent diameter and equal or greater length to the specified nails maybe substitutued unlessothennriw prohibited. PROVIDE SOLID BLOCKING @ 48" 0. C. DBL � AROUI ROOF REMOV FLUSH 2-1 J' FLUSH CLG. E ROOF FRAMING PLA J SCALE: 1 /4"-1'-0" APPLY SIMPSON RIDGE STRAPS AT EA. RAFTER TO RAFTER 1 J"x11 J" LVL RIDGE BM 2x6 @ 16" O.C. COLLAR TIES ALUM. GUTTERS ON FASCIA BDS TO MATCH EX. 1x SOFFIT TO MATCH EX. w/CON'T VINYL SOFFIT VENT O X I W o U ilk Nk H a 1" SYROFOAM i CONT. AT RIM 2x4 @ 16" O.C. UP TIGHT TO UNDERSIDE OF RIDGE BM. ­'W� - FURR OUT_x RAFTERS FOR INSUL. FLOOR CONSTRUCTION 3/4" T & G PLYWD SUBFLOOR GLUED & NAILED OVER 2x10's @ 16" O.C. R30 INSULATION " PT PLYWOOD BETWEEN JSTS. SEE DETAIL A CROSS SECTION SCALE:1 /4"= 1 -0 TYPICAL ROOF CONSTRUCTION ASPHALT SHINGLES ON TRI -FLEX UNDERLAYMENT ON 1/2" ZIP PLYWD. PROP -A -VENT BAFFLE AT SLOPED CLG. S 2x10 RAFTERS @ 16" O.C. W/ SIMPSON H2.5A CLIPS @ 16" O.C. (R-49) INSULATION TYPICAL WALL CONSTRUCTION W.C. SHINGLES ON TYVEK HOUSEWRAP 1/2" ZIP PLYWOOD 2x6 STUDS @ 16" O.C. R21 INSULATION 1/2" GWB. -PTD. SIMPSON ANGLE CLIP AT EA. FLOOR JOIST TO BM 3 -PT 1 J"x9 1" LVL W/SIMPSON HOLD DOW AT SONOTUBES 12" DIA. CONIC. SONOTUBES ON "BIGFOOT FTG"-TYP C r 0Ld C U I Cr LTJ LTJ r" ZV) Q C)� XL 0 m LLJ O L U r) U , LLJ 0 Z LLJ O � I- O z 0 f --- r-) _ Q 0 LL1 TI TLE: ROOF FRAMING PLAN/ CROSS SEDTION DATE ISSUED: 08/23/2020 REVISIONS: 12/19/2020 DRAWN BY: PROJECT #: DRAWING NO. Q D Q 0ry _ � W O CD > � 0 Q0 0 V) TI TLE: ROOF FRAMING PLAN/ CROSS SEDTION DATE ISSUED: 08/23/2020 REVISIONS: 12/19/2020 DRAWN BY: PROJECT #: DRAWING NO.