Loading...
HomeMy WebLinkAboutEngineer Plans - 2000BENCH DARK: TOP OF FND. ELE.= 24.0 AS� SHALL 3E 21 5. %3' ON MAN=HOLE COVERS T() EXTEND TO 1 2.0' WIDE -,IN 6" OF FINISH `RADE I _P WIT[, 2) DEEP 10 MIN. GAS BAFFLE REQ'D 2% NEW DIST. BOX REQ'D EV -20.29 r- 2 0 % om'- LE u RADE REQ 'D NEW W�D DIST. �TB BOX REQ'D 0 27 2 10 _p, ­a, -.,w2" PEASTONE TOPPING 21.3 NEW 21.05 D. B. VENT (SAS) UNDER Uj LU19 99 1,500 GAL 19 19.99, 19.82 JJ= 19.79 DRIVEWA\,/ J 60 CR USHER TONE 10 3 3 El to 1-1/2" DOUBLE 6' CRUSHED STONE SOIL TEST LOG PERC RATE= < 2 MIN/INCH DEPTH 0 6" 22 77 114 ELEV.= 23.0 LOICUS Ld Np LOAMY SAND 2.5y 4/2 B LOAMY SAND 2.5Y 6/6 .25 Cl MED SAND 10YR 5/3- 16 C2 MED SAND 2.5Y 7/3 -.0 GENERAL NO T ES . C3 COARSE SAND 10YR 6/6 124"1 12.50 SOIL TEST CONDU(.TFD ON JULY 13, 20-00 BY BRIAN CELIA, SOIL EVALUATOR WITNESSED BY: AMY VON HONE, AGENT YARMOUTH HEALTH DEPARTMENT NO WATER OBSERVED 0 124" PERC BOTTOM @ 41 " LEGEND: EXISTING CONTOUR 22 EXISTING SPOT EL EV 23x00 WATER GATE W. M. WATER SERVICE _W ­_W_ TEST HOLE GAS SERVICE _G_G BENCH MARK �� BM NOTE: PRIOR TO INSTALLING THE NEW (SAS) THE CONTRACTOR SHALL PUMPOU_11_ CESSPOOLS AND BACKFILL WITH CLEAN MEDIUM SAND .REQUESTED VARIANCES: 1) REQUEST 9' VARIANCE FOR SEPARATION (SAS) AND FOUNDATION WALL 2) REQUEST 8' VARIANCE FOR SEPARATION (SAS) AND PROPERTY LINE 3) REQUEST 7' VARIANCE FOR SEPARATION SEPTIC TANK AND PROPERTY LINE 20' MIN. ASHED STONE ALL AROUND REQ'D 4' 17. C 4,L SE TWO ',2) '..'00 GAL -ON GALLEYS 1-11H 4' 0:__- STONE @ SIDES PROPOSED SEPTIC SYSTEM 4' OF SION_ ®ENDS NO SCALE NO ABUTTING FOUNDATION IS WITHIN 20' TO THE PROPOSED (SAS). t ti 14 I A I 1 1. 6 18 1 1 00 12 14 20 NI 3' B M 28' 0 TOP FND=24.0 I 24) 0 24i QL 28' Q� Q I 23x00 24 21, W SWAY 26 W " 24 LAN 1)) = 20) �ROAD \0' joo� p LOICUS Ld WOOD ROAD 0 LOCUS MAP GENERAL NO T ES — ELEVATIONS SHOWN BASED ON U.S.G.S. DATUM. SYSTEM PIPE SHALL BE EITHER C.I. OR SCHEDULE 40 P.V.C. — THE BOARD OF HEALTH "'HALL BE NOTIFIED PRIOR TO BACKFILLING OF SEPTIC SYSTEM. — SEPTIC SYSTEM STRUCTURAL COMPONENTS SHALL BE CAPABLE OF WITHs-7ANDiNG A h'-10 LOADING, UNLESS SPECIFIED OTHERWISE — SEPTIC SYSTEM UNDER DRIVEWAYS SHALL COMPLY WITH A H-20 LCIADING. — -,-I IE DESIGN AND COMPOlk'li"NTS OF THE SEFF TIC SYSTEM SHALL BE IN COMPLIANCE WITH THE Sl'ATE OF MASSACHUSETT'L-) SANITARY CODE ITLE V, AND SHALL BE I � COMPLIANCE WITH HE LOCAL F3'OARD OF' HEALTH RULES AND R EG Ul LATI 0 N`:_)'. TPF CONTRACTOP -Ht,0,t_ ,F RFcPnNSI8I.E FOP "'ROUND UTILITIES LOCATION OF ALL UNDER "'ROUND AND SHALL NOTiF`Y DIG — SAFE PRIOR TO CONSTRUCTION. NO GARBAGE GRINDER DESIGN CRITERIA: DESIGN FLOW 3 BEDROOMS AT 110 G.P.B. / DAY 330 G.P.D. REQUIRED SEPTIC TANK: NEW 1. 500 LLON SEPTIC TANK PROVIDED 1,500 GALLON DESIGN PERC RATE <2 MIN/INCH SIZE OF REQ'D (SAS) AREA = 330/0.74 = 446 S.F. SIDEWALL (2)(2)(25)+(2)(2)(112)=148 S.F. BOTTOM (12)(25) = 300 S.F. SIZE OF LEACHING FACILITY PROVIDED: 300 S.F. + 148 S.F. = 448 S.F. =331.52 GPD EFFECTIVE DEPTH: 2' EFFECTIVE LENGTH: 25.0' EFFECTIVE WIDTH: 12.0' 4-A CONSULTING ENGINEERS 7 WEEKS POND DRIVE SANDWICH, MA 02601 (508) 477-8268 Hunter Engineering Associates, inc. PROJECT: SEPTIC SYSTEM REPAIR FOR 314 WOOD ROAD SCAU: AS SHOWN D#kAym ffy: J P H NEW MAP 70 / LOT 23 6" 8/19/00 wrsm w,: OWNER: MARY ZIEPERNICK 314 WOOD ROAD SOUTH YARMOUTH, MA 02664 IME- onor