Loading...
HomeMy WebLinkAbout35 Par Three Drive, South Yarmouth, MA Family Room Garage W—Foyer(Breakfast Room Stairwa The existing bathroom layout will remain the same. Existing tub will be refinished. Tub/shower trim, mixing valve, and trip level drain will be replaced. Water supply lines and waste piping will not be changed Existing sink will be removed. New vanity and under - mount sink will be installed in same position. New faucet and water shutoff valves will be installed. Water supply lines and waste piping in wall will not be changed, Existing toilet will be removed and stored, and then reinstalled in same position after drywall, painting and floor tiling is completed. Water supply line and waste piping will not be changed. Plumbing Work: Disconnect fixtures (sink, toilet and tub) from water supply and waste piping. Remove existing sink and install new sink with new shutoff valves after new vanity is installed. Remove toilet and store Reinstall toilet after floor tilinq is completed. Replace tub drain and shower and tub trim. Dining Install wall tile above tub. Refinish exist. tub after wall & floor tiling is completed. -- S E W N FIRST FLOOR PLAN Owners: Robert & Shirley Letourneau Living Room Other Work: Remove existing drywall, wall tiles, and insulation. Install new insulation and drywall. Door and window trim will be removed and replaced. Remove existing ceiling drywall and insulation and replace with new drywall and insulation. Remove vanity and sink. Install new vanity and sink after drywall and floor tiling is Bedroom Remove and replace approx. 90 sq. ft. of white cedar shingles. Master Closet MccC-UID MAY 20 2021 HEALTH DEPT. Electrical Work: Remove three ceiling lights. Install two ceiling lights and two wall sconces. Replace GFCI outlet. Replace light switches and wiring as necessary. Master Bedroom GUEST BATHROOM RENOVATIONS FIRST FLOOR PLAN 5 PAR THREE DRIVE SOUTH YARMOUTH, MA OWNERS: ROBERT & SHIRLEY LETOURNEAU REVISED MAY 17, 2021