HomeMy WebLinkAboutJ5951-10 Dennis Yarmouth Middle School WE 2021-08-06Summary Report #10
August 9, 2021
Job No: 5951
Job Name:Dennis Yarmouth Middle School
296 Station Ave
South Yarmouth, MA 02664
Application No.:
TESTING
INSPECTION
ENGINEERING
EM
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
August 2, 2021
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. No Samples Taken. See attached.
Arsene Ntwali performed reinforcing steel placement inspection. See attached.
The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of
workmanship.
August 3, 2021
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed concrete placement and sampling inspection. Concrete sample(s)
obtained: (5) per set, (2) set(s), (10) total. See attached.
Arsene Ntwali performed soils compaction testing. No Samples Taken. See attached.
The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of
workmanship.
August 4, 2021
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. No Samples Taken. See attached.
The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of
workmanship.
John Lydstone picked up (20) concrete cylinders and (1) soil sample from the jobsite.
August 5, 2021
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. No Samples Taken. See attached.
Arsene Ntwali performed reinforcing steel placement inspection. See attached.
The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of
TESTING
INSPECTION
ENGINEERING
EM
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
workmanship.
August 6, 2021
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed concrete placement and sampling inspection. Concrete sample(s)
obtained: (5) per set, (2) set(s), (10) total. See attached.
Arsene Ntwali performed soils compaction testing. No Samples Taken. See attached.
The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of
workmanship.
Laboratory test results are enclosed if testing was done during the period covered by this report.
Limitations: These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as
acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the
code.
Reviewed by:
Enea Mushi
Project Manager
08-13-2021
Date
Technical Contact: Bruce Tie, Engineering Manager (btie@fenaghengineering.com)
Administrative Contact: Andrew Kelley (akelley@fenaghengineering.com)
TESTING
INSPECTION
ENGINEERING
Soils Compaction
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: NA
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
August 2, 2021
Time In: 07:00 Time Out: 15:00
Weather: Sunny
Temperature: 77°F
Permit No. :
Plans Dated: 03/26/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
08-02-2021
Date Enea Mushi
Project Manager
08-12-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Plate
compactor , excavator , Dozer. No samples taken.
Density Std (DS):
2518
Moisture Std (MS):
470
Specified Compaction:
95%
Soils Report prepared by:
Fenagh Engineering
Source of Fill:
Import:
General Location of Fill:
Building D
Nuclear Gauge:
Humbolt HS-5001EZ 5200
calibration expiration date 09/2021
Soils Report Dated:
06-07-2021
Results Reported to:
Mitch Miller
Equipment Observed:
Compaction: Plate compactor
Excavation: excavator
Earthwork: Dozer
Description of material Reference CurveID Lab Log ID Max Dry Density(pcf)Optimum Moisture
R.B.O Structural fill 1 C-185b 130.4 8.2
Test#Test Location
Probe
Depth
(in)
Test Elev.
(ft)
Ref.
Curve
Used
Test Dry
Density (lbs/cu.
ft.)
Test Moisture
(%)
Compaction
(95%)
(%)
Comments
1 C/d24 6 -1 TOW 1 124.8 4.7 96 Pass
2 D/d22 6 -2 TOW 1 125.4 4.0 96 Pass
3 B/d23 6 -3 TOW 1 125.0 5.3 96 Pass
4 C/d20 6 -2 TOW 1 126.0 5.5 97 Pass
Additional Notes: Proctor provided by PMA.
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
Inspection Type: Reinforcing Steel Placement
Pg. 1 of 1
August 2, 2021
Time In: 10:00 Time Out: 14:00
Weather: Sunny
Temperature: 77°F
Permit No. :
Plans Dated: 06/11/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
08-02-2021
Date Enea Mushi
Project Manager
08-12-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Additional Notes: Wall: D/d3-d5, D-E/II, D-E/JJ, c4-d5/E, c9-c12/E,rnPiers: d8/ErnFooting: elevator pit, c11-c21/H, c22/H-G
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of reinforcing steel for L1 wall(s) at C
and D building . Work complete. Reference detail Sheet R007, R008.
Reinforcing Steel and Anchor Bolts
Y N Y N
Rebar Installed Per Approved Details ✓General Notes And Typical Details Reviewed ✓
Rebar The Proper Size ✓Rebar The Proper Type/grade ✓
Rebar Spacing Acceptable ✓Min Clearances Achieved Around Rebar ✓
Min Lap Splice Lengths Achieved ✓Additional Required Rebar Has Been Placed ✓
Coupler/t-heads Torque Tested If Applicable ✓Coupler/t-heads Placed Per Approved Details If Applicable ✓
Rebar Testing Complete And Passed If Required ✓
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
Inspection Type: Concrete Placement and Sampling
Pg. 1 of 1
August 3, 2021
Time In: 07:00 Time Out: 10:00
Weather: Sunny
Temperature: 77°F
Permit No. :
Plans Dated: 05/19/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
08-03-2021
Date Enea Mushi
Project Manager
08-12-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of and performed sampling of concrete for
Level 1, footings at Building C and D (mix no. 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in.,
specified air content from 4.5% to 7.5%, and 55 cubic yards placed). Monitored loads for mix no., slump, temp., and time limit.
Prepared 4x8" cylinder test specimens sampled from TRUCK DISCHARGE.
Set
No.
Slump
(in.)
Mix
Temp.
(°F)
Air
Temp.
(°F)
Air Content
(%)
Unit
Weight
(pcf)
Truck
No.Location Qty. of
Samples
Batch
Time Sample Time Subcontractor Ticket
No.
1 6 70 77 6.6 144.3 73 Elevator pit
foundation 5 6:53 AM 7:40 AM Marguerite 3126
0
2 5.75 70 77 6.2 144.7 59 c22/H 5 9:24 AM 10:30 AM Marguerite 3126
4
10 Total
Additional Notes: Wall: D/d3-d5, D-E/II, D-E/JJ, c4-d5/E, c9-c12/E,rnPiers: d8/ErnFooting: elevator pit, c11-c21/H, c22/H-G
Referenced Details: Mix Design 3500D-3/4 Design Concrete
TESTING
INSPECTION
ENGINEERING
Soils Compaction
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: NA
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
August 3, 2021
Time In: 10:00 Time Out: 15:00
Weather: Sunny
Temperature: 77°F
Permit No. :
Plans Dated: 03/26/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
08-03-2021
Date Enea Mushi
Project Manager
08-12-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Plate
compactor , excavator , Dozer. No samples taken.
Density Std (DS):
2525
Moisture Std (MS):
470
Specified Compaction:
95%
Soils Report prepared by:
Fenagh Engineering
Source of Fill:
Import:
General Location of Fill:
Buildin D
Nuclear Gauge:
Humbolt HS-5001EZ 5200
calibration expiration date 09/2021
Soils Report Dated:
06-07-2021
Results Reported to:
Mitch Miller
Equipment Observed:
Compaction: Plate compactor
Excavation: excavator
Earthwork: Dozer
Description of material Reference CurveID Lab Log ID Max Dry Density(pcf)Optimum Moisture
R.B.O Structural fill 1 C-185b 130.4 8.2
Test#Test Location
Probe
Depth
(in)
Test Elev.
(ft)
Ref.
Curve
Used
Test Dry
Density (lbs/cu.
ft.)
Test Moisture
(%)
Compaction
(95%)
(%)
Comments
1 C/d20 6 -3 TOW 1 125.1 4.4 96 Pass
2 B/d17 6 -2 TOW 1 125.6 4.6 96 Pass
3 A/d15 6 -2 TOW 1 125.9 5.3 97 Pass
Additional Notes: Proctor provided by PMA.
TESTING
INSPECTION
ENGINEERING
Soils Compaction
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: NA
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
August 4, 2021
Time In: 07:00 Time Out: 15:00
Weather: Sunny
Temperature: 80°F
Permit No. :
Plans Dated: 03/26/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
08-04-2021
Date Enea Mushi
Project Manager
08-12-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Plate
compactor , excavator , Dozer. No samples taken.
Density Std (DS):
2532
Moisture Std (MS):
475
Specified Compaction:
95%
Soils Report prepared by:
Fenagh Engineering
Source of Fill:
Import:
General Location of Fill:
Buildin D
Nuclear Gauge:
Humbolt HS-5001EZ 5200
calibration expiration date 09/2021
Soils Report Dated:
06-07-2021
Results Reported to:
Mitch Miller
Equipment Observed:
Compaction: Plate compactor
Excavation: excavator
Earthwork: Dozer
Description of material Reference CurveID Lab Log ID Max Dry Density(pcf)Optimum Moisture
R.B.O Structural fill 1 C-185b 130.4 8.2
Test#Test Location
Probe
Depth
(in)
Test Elev.
(ft)
Ref.
Curve
Used
Test Dry
Density (lbs/cu.
ft.)
Test Moisture
(%)
Compaction
(95%)
(%)
Comments
1 D/d17 6 -3 TOW 1 124.9 4.9 96 Pass
2 B/d17 6 -2 TOW 1 125.5 4.7 96 Pass
3 A/d15 6 -2 TOW 1 125.3 5.0 96 Pass
4 D/d14 6 -1 TOW 1 126.0 5.8 97 Pass
Additional Notes: Proctor provided by PMA.
Daily Pick Up Report
Job Number: Project Name:
Fenagh Representative: Date:
Cylinders
Shotcrete
Grout
Mortar
Grout Cubes
Prisms
PT Cables
Fireproofing Samples
Soil Samples
Rebar Samples
Steel Plates
Other
Additional Comments:
Job Site Shop Batch Plant/Quarry Other: ________
Cure Box Temp: ______ High/Low Temp: ________ Outside Temp: ______
Dennis-Yarmouth MS 5951
John Lydstone 08/04/2021
n
NA 75
20
1 bucket of soil
Met AN@CSH for samples. Also picked up Nuke gauge.
NA
TESTING
INSPECTION
ENGINEERING
Soils Compaction
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: NA
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
August 5, 2021
Time In: 07:00 Time Out: 15:00
Weather: Sunny
Temperature: 76°F
Permit No. :
Plans Dated: 03/26/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
08-05-2021
Date Enea Mushi
Project Manager
08-12-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Plate
compactor , excavator , Dozer. No samples taken.
Density Std (DS):
2530
Moisture Std (MS):
478
Specified Compaction:
95%
Soils Report prepared by:
Fenagh Engineering
Source of Fill:
Import:
General Location of Fill:
Buildin D
Nuclear Gauge:
Humbolt HS-5001EZ 5200
calibration expiration date 09/2021
Soils Report Dated:
06-07-2021
Results Reported to:
Mitch Miller
Equipment Observed:
Compaction: Plate compactor
Excavation: excavator
Earthwork: Dozer
Description of material Reference CurveID Lab Log ID Max Dry Density(pcf)Optimum Moisture
R.B.O Structural fill 1 C-185b 130.4 8.2
Test#Test Location Probe
Depth (in)
Test Elev.
(ft)
Ref.
Curve
Used
Test Dry
Density (lbs/cu.
ft.)
Test Moisture
(%)
Compaction
(95%)
(%)
Comments
1 C/d15 6 -3 TOW 1 125.5 5.3 96 Pass
2 B/d11 6 -2 TOW 1 125.0 4.8 96 Pass
Additional Notes: Proctor provided by PMA.
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
Inspection Type: Reinforcing Steel Placement
Pg. 1 of 1
August 5, 2021
Time In: 10:00 Time Out: 15:00
Weather: Sunny
Temperature: 76°F
Permit No. :
Plans Dated: 06/11/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
08-05-2021
Date Enea Mushi
Project Manager
08-12-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Additional Notes: Building CrnWall:c4-c2/E, E-H/c1, c1-c5/H, c9-c13/HrnBuilding BrnFoundation: J-J.7/b32, b25-b32/J.7, b25-
b32/J, J-J.7/b25
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of reinforcing steel for L1 wall(s) at C
and B building . Work complete. Reference detail Sheet R007.
Reinforcing Steel and Anchor Bolts
Y N Y N
Rebar Installed Per Approved Details ✓General Notes And Typical Details Reviewed ✓
Rebar The Proper Size ✓Rebar The Proper Type/grade ✓
Rebar Spacing Acceptable ✓Min Clearances Achieved Around Rebar ✓
Min Lap Splice Lengths Achieved ✓Additional Required Rebar Has Been Placed ✓
Coupler/t-heads Torque Tested If Applicable ✓Coupler/t-heads Placed Per Approved Details If Applicable ✓
Rebar Testing Complete And Passed If Required ✓
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
Inspection Type: Concrete Placement and Sampling
Pg. 1 of 1
August 6, 2021
Time In: 07:00 Time Out: 11:00
Weather:
Temperature: 78°F
Permit No. :
Plans Dated: 05/19/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
08-06-2021
Date Enea Mushi
Project Manager
08-12-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of and performed sampling of concrete for
Level 1, wall(s) at Building C and B (mix no. 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified
air content from 4.5% to 7.5%, and 96 cubic yards placed). Monitored loads for mix no., slump, temp., and time limit. Prepared 4x8"
cylinder test specimens sampled from TRUCK DISCHARGE.
Set
No.
Slump
(in.)
Mix
Temp.
(°F)
Air Temp.
(°F)
Air Content
(%)
Unit Weight
(pcf)
Truck
No.Location Qty. of
Samples Batch Time Sample Time Subcontractor Ticket
No.
1 5.5 72 75 5.8 144.6 56 E/c2 5 6:51 AM 7:35 AM Marguerite 3130
2
2 6.0 72 75 6.3 144.1 51 J.7/b25 5 8:21 AM 9:10 AM Marguerite 3152
7
10 Total
Additional Notes: Building CrnWall:c4-c2/E, E-H/c1, c1-c5/H, c9-c13/HrnBuilding BrnFoundation: J-J.7/b32, b25-b32/J.7, b25-
b32/J, J-J.7/b25
Referenced Details: Mix Design 3500D-3/4 Design Concrete
TESTING
INSPECTION
ENGINEERING
Soils Compaction
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: NA
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
August 6, 2021
Time In: 07:00 Time Out: 15:00
Weather:
Temperature: 78°F
Permit No. :
Plans Dated: 03/26/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
08-06-2021
Date Enea Mushi
Project Manager
08-12-2021
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed soils compaction testing. Equipment used was Plate
compactor , excavator , Dozer. No samples taken.
Density Std (DS):
2538
Moisture Std (MS):
472
Specified Compaction:
95%
Soils Report prepared by:
Fenagh Engineering
Source of Fill:
Import:
General Location of Fill:
Buildin D
Nuclear Gauge:
Humbolt HS-5001EZ 5200
calibration expiration date 09/2021
Soils Report Dated:
06-07-2021
Results Reported to:
Mitch Miller
Equipment Observed:
Compaction: Plate compactor
Excavation: excavator
Earthwork: Dozer
Description of material Reference CurveID Lab Log ID Max Dry Density(pcf)Optimum Moisture
R.B.O Structural fill 1 C-185b 130.4 8.2
Test#Test Location
Probe
Depth
(in)
Test Elev.
(ft)
Ref.
Curve
Used
Test Dry
Density (lbs/cu.
ft.)
Test Moisture
(%)
Compaction
(95%)
(%)
Comments
1 C/d4 6 -2 TOW 1 125.5 4.4 96 Pass
2 B/d8 6 -1 TOW 1 125.0 4.0 96 Pass
3 D/d4 6 -1 TOW 1 124.8 5.5 96 Pass
Additional Notes: Proctor provided by PMA.
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
Inspection Type: Samples made by Client Representative
Pg. 1 of 1
August 5, 2021
Permit No. :
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Fenagh laboratory received 1 L-Soil ASTM D1557 Moisture-Density Relations of Soil Using Modified Effort (Modified Proctor),ASTM
D422 Particle-Size Analysis of Soils (with Hydrometer) samples for test(s).
Sample information including but not limited to material, schedule(s), and specified requested test(s) were provided by Client
Representative and cannot be corroborated by Fenagh.
NCR ID#Date Location Inspector Issue RFI/ Submittal
No.Resolved? (Y/N)Sub/ Contractor Date Resolved Comment
EOR to Advise
00/00/2021
7 day break Set 1 = psi
00/00/2021
28 day break Set 1 = psi
Legend:
Status: Closed
Status: Open
TESTING
INSPECTION
ENGINEERING
Soils Test Report
Project Name: Dennis Yarmouth Middle School Place of Sampling : Unknown Appl No:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 08/02/2021
Client: PMA Date of Sampling: 07/26/2021 Lab Log No.: 15408 (S782)
Reviewed by: Henry Soares
08/02/2021
Date
ASTM Standards Used: Unless otherwise noted ASTM D1557, D422, D4318, D2216, D1140,Method-C
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 2
Max Density
130.7 pcf @ 7.9%
As Received Moisture
12.5%
Source
Import
Color
Brown/Grey
Description
Recycled Crushed Concrete
Specific Gravity
2.7 Estimated
Date Received: 07/27/2021
Date Tested: 07/27/2021
Tested by: Max Nabulsi
Desc of Rammer: Mechanical
Material: Recycled Crushed Concrete
Preparation Method: Moist
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERING
Soils Test Report
Project Name: Dennis Yarmouth Middle School Place of Sampling : Unknown Appl No:
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 08/02/2021
Client: PMA Date of Sampling: 07/26/2021 Lab Log No.: 15408 (S782)
Reviewed by: Henry Soares
08/02/2021
Date
ASTM Standards Used: Unless otherwise noted ASTM D1557, D422, D4318, D2216, D1140,Method-C
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 2 of 2
Sieve Designation Sieve Size Cumulative %Cumulative %Low HiRetainedPassing
3 in 3 in 75 mm 0 100
2 in 2 in 50 mm 0 100
1 1/2 in 1.5 in 37.5 mm 0 100
1 in 1 in 25 mm 8 92
3/4 in 0.75 in 19 mm 17 83
1/2 in 0.5 in 12.5 mm 28 72
3/8 in 0.375 in 9.5 mm 34 66
No. 4 0.187 in 4.75 mm 46 54
No. 8 0.0937 in 2.36 mm 51 49
No. 10 0.0787 in 2 mm 53 47
No. 16 0.0469 in 1.18 mm 58 42
No. 30 0.0234 in 600 ?m 70 30
No. 40 0.0165 in 425 ?m 77 23
No. 50 0.0117 in 300 ?m 83 17
No. 100 0.0059 in 150 ?m 91 9
No. 200 0.0029 in 75 ?m 94 6.3
Remarks:
Received Sample Condition: Acceptable and/or Satisfactory